ML20101J793

From kanterella
Jump to navigation Jump to search
Forwards CPSES Unit 2,Cycle 3 Colr
ML20101J793
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 03/28/1996
From: Terry C, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101J796 List:
References
TXX-96107, NUDOCS 9604020145
Download: ML20101J793 (1)


Text

i s

g l

m Log # TXX 96107 l

==

File # 10010 916(COLR)

Ref. # 10CFR50.36 1UELECTRIC l

March 28, 1996 C. Lance Terry l

Group Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

UNIT 2 DOCKET N0. 50-446 CORE OPERATING LIMITS REPORT FOR CYCLE 3 Gentlemen:

Enclosed is the Core Ope.*ating Limits Report for Unit 2 Cycle 3, prepared and submitted pursuant tc Technical Specification 6.9.1.6.

Sincerely, he $

  • C. L. Terry By:

M Roger 0. Walker 6

Regulatory Affairs Manager JDS/bd Enclosure l

cc:

Mr. L. J. Callan, Region IV Hr. W. D. Johnscn. Region IV Mr. T. J. Polich, NRR Resident Inspectcrs 9604020145 960328 PDR ADOCK 05000446 P

PDR 020013 opt (t

P. O. Bos 1002 O'.en Rose. Texas 76043