Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20107J256 + (06:57:41, 13 December 2024)
- ML20107J253 + (06:57:43, 13 December 2024)
- ML20107J246 + (06:57:44, 13 December 2024)
- ML20107J236 + (06:57:45, 13 December 2024)
- ML20107J234 + (06:57:46, 13 December 2024)
- ML20107J229 + (06:57:47, 13 December 2024)
- ML20107J226 + (06:57:48, 13 December 2024)
- ML20107J224 + (06:57:49, 13 December 2024)
- ML20107J218 + (06:57:50, 13 December 2024)
- PY-CEI-NRR-0157, Responds to Sser 4 Confirmatory Issue 56 Re Containment Purge Sys.Commitment to Three Programs to Assess Need for Use of Containment Purge Sys & to Minimize Use Consistent W/Alara Guidelines Verified.Programs Encl + (06:57:50, 13 December 2024)
- ML20107J207 + (06:57:51, 13 December 2024)
- ML20107J202 + (06:57:53, 13 December 2024)
- 05000423/LER-1996-004-02, :on 960316,auxiliary Feedwater Isolation Valves Noncompliance W/Ts Occurred.Caused by Misinterpretation of Ts.Event Reviewed W/Station Personnel to Caution Others on TS Surveillance Requirements + (06:57:54, 13 December 2024)
- ML20107J179 + (06:57:56, 13 December 2024)
- B11448, Requests NRC Issue Certificates by 850314 Stating That Listed Facilities Are in Furtherance of Abatement & Control of Pollution for Purposes of Any Section of Internal Revenue Code Which Requires Certification + (06:57:57, 13 December 2024)
- ML20107J170 + (06:57:57, 13 December 2024)
- ML20107J164 + (06:57:58, 13 December 2024)
- ML20107J162 + (06:57:59, 13 December 2024)
- PY-CEI-NRR-0195, Provides Info Addressing STS 4.8.4.2 Re Surveillance of Containment Penetration Conductor Overcurrent Protective Device Fuses.Requests Deletion of Tech Spec Based on Lack of Existing Justification for Surveillance of Fuses + (06:57:59, 13 December 2024)
- ML20107J152 + (06:58:00, 13 December 2024)
- 05000366/LER-1984-018-01, :on 841002,util Informed That Johnston Pump Co Standby Svc Water Pump 2P41-C002 Might Not Withstand DBE Because of Incorrect Assumption in Calculation Stress Analysis.Split Ring Removed + (06:58:02, 13 December 2024)
- ML20107J144 + (06:58:03, 13 December 2024)
- ML20107J141 + (06:58:04, 13 December 2024)
- ML20107J137 + (06:58:05, 13 December 2024)
- ML20107J138 + (06:58:05, 13 December 2024)
- PY-CEI-NRR-0197, Responds to Questions Re Components Purchased from Tdi,Per Review of Design Review/Quality Revalidation & Quality Revalidation Insp Results & SER Outstanding Issue 24.All Recommendations on Push Rod Insps Implemented + (06:58:06, 13 December 2024)
- BECO-LTR-96-035, Forwards Revised Table in Support of Plant Relief Request - 9 Re Reactor Pressure Vessel nozzle-to-shell & Nozzle Inner Radius Exams + (06:58:07, 13 December 2024)
- ML20107J120 + (06:58:07, 13 December 2024)
- ML20107J111 + (06:58:08, 13 December 2024)
- PY-CEI-NRR-0191, Forwards Info Addressing SER Section 2.4.7 Re Tech Spec for Shoreline Erosion Monitoring.Designs for Shoreline Protection Will Be Reflected in FSAR Amend.Deletion of Tech Spec Re Shoreline Monitoring Requested + (06:58:09, 13 December 2024)
- ML20107J094 + (06:58:10, 13 December 2024)
- ML20107J095 + (06:58:10, 13 December 2024)
- ML20107J093 + (06:58:11, 13 December 2024)
- ML20107J091 + (06:58:12, 13 December 2024)
- ML20107J088 + (06:58:12, 13 December 2024)
- 05000395/LER-1984-041, :on 840928,reactor Tripped from Approx 10% Power & Intermediate Range High Flux Bistable Did Not Reset on Decreasing Power.Caused by Operator Error.Incident Reviewed W/Personnel + (06:58:14, 13 December 2024)
- 05000321/LER-1984-016-01, :on 840929,reactor Protection Sys Logic Actuation Occurred from Erratic Reactor Water Level a Instruments 1B21-N017A & B.Caused by Air Trapped in Instrument Lines.Variable Leg Backfilled + (06:58:16, 13 December 2024)
- TXX-9611, Forwards Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan + (06:58:17, 13 December 2024)
- W3P85-0464, Forwards Program to Perform Confirmatory Analyses,Nuclear Plant Island Structure Basemat, Concerning Cracking of Basemat.Program Plan Incorporates NRC Comments from 850213 Meeting + (06:58:18, 13 December 2024)
- IR 05000219/1974005 + (06:58:22, 13 December 2024)
- ML20107J053 + (06:58:23, 13 December 2024)
- FVY-84-128, Forwards Results of Detailed Engineering Evaluation of Potential Oxygen Addition to Primary Containment Conducted to Satisfy Criteria of Generic Ltr 84-09.Hydrogen Recombiner Capability Not Necessary + (06:58:24, 13 December 2024)
- ML20107J050 + (06:58:24, 13 December 2024)
- ML20107J025 + (06:58:25, 13 December 2024)
- 05000454/LER-1985-017, :on 850119,PORV Block Valves Not Deenergized During RCS Leak Test.Caused by Misinterpretation of Tech Spec Limiting Condition for Operation.Personnel Briefed + (06:58:27, 13 December 2024)
- B11450, Forwards Summary of Core Barrel Insp Planned During 1985 End of Cycle 6 Refueling Outage.Insp Results & Conclusions Will Be Provided by 850601 + (06:58:28, 13 December 2024)
- ML20107J014 + (06:58:28, 13 December 2024)
- ML20107J009 + (06:58:29, 13 December 2024)
- ML20107J007 + (06:58:30, 13 December 2024)
- 05000454/LER-1985-016, :on 850124,reactor Trip Occurred.Caused by Instrument Mechanic Grounding Strip Chart Recorder Connector Using Incorrect Size for Connectors.Surveillances Performed to Verify Proper Operation of Trains + (06:58:32, 13 December 2024)
- ML20107H998 + (06:58:33, 13 December 2024)
- ML20107J000 + (06:58:33, 13 December 2024)