ML20107J164
| ML20107J164 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 02/19/1985 |
| From: | Danni Smith COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 84-13, 9774N, NUDOCS 8502270406 | |
| Download: ML20107J164 (2) | |
Text
n- -
dn\\t2.
Commonwealth Edison one First National Plaz7, Chicago, Illinois Address Reply to: Post Office Box 767 Chicago, Illinois 60690 February 19, 1985 Mr. James G. Keppler Regional Administrator U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Braidwood Station Units 1 and 2 10 CFR 50.55(e) No. 84-13 Interim Report Electrical Butt Splices NRC Docket Nos. 50-456/457 References (a):
E. D. Swartz letter to J. G. Keppler dated September 5, 1984 (b):
D.
H.
Smith letter to J. G. Keppler dated November 1, 1984
Dear Mr. Keppler:
References (a) and (b) provided information concerning a potential deficiency reportable pursuant to 10 CFR 50.55(e) regarding electrical butt splices not installed in accordance with the manufacturer's recommendations at our Braidwood Station.
The purpose of this letter is to provide an updated status of the corrective actions taken to resolve this issue.
This letter is considered to be an Interim Report.
As previously reported in Reference (b), Commonwealth Edison Company NCR-598 has been issued to track issue resolution.
A program was developed as a supplement to the disposition of NCR-598 to ensure that all potentially deficient safety related butt splices are identified and inspected.
Deficient splices will be repaired and reinspected in accordance with revised installation and inspection procedures.
This program also provides for adequate documentation of corrective action activities.
Training sessions have been conducted for personnel involved in the implementation of the corrective action program.
Currently, a listing of all cables / equipment potentially utilizing butt splices is being developed using documentation associated with completed and accepted terminations.
List completion and initiation of inspection activities is anticipated by March 15, 1985.
Overall program completion is projected for September, 1985.
An interim report updating the status of corrective action will be submitted by May 1, 1985.
8502270406 850219 PDR ADOCK 05000456 FEB 2 01985 1
S PDR 1 0 t
50l
~ '<' %
I Please address any questions that you or your staff may have concerning this matter to this office.
- rulyyufs, ery sn&l l%A David H. Smith Nuclear Licensing Administrator cc:
NRC Resident Inspector - Braidwood Director of Inspection and Enforcement
.U.S.
Nuclear Regulatory Commission Washington, D.C. 20555 9774N e
f