Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20108E669 + (06:25:35, 13 December 2024)
- ML20108E646 + (06:25:36, 13 December 2024)
- 3F0385-07, Forwards Prioritized List of Issues to Facilitate NRC Resolution of Necessary Manpower by Needed Approval Dates + (06:25:37, 13 December 2024)
- ML20108E608 + (06:25:37, 13 December 2024)
- ML20108E578 + (06:25:38, 13 December 2024)
- PNP 2020-012, 2019 Radiological Environmental Operating Report + (06:25:39, 13 December 2024)
- ML20108E567 + (06:25:39, 13 December 2024)
- ML20108E558 + (06:25:40, 13 December 2024)
- ML20108E552 + (06:25:41, 13 December 2024)
- ML20108E534 + (06:25:41, 13 December 2024)
- ML20108E515 + (06:25:42, 13 December 2024)
- ML20108E523 + (06:25:42, 13 December 2024)
- ML20108E503 + (06:25:43, 13 December 2024)
- B11439, Forwards Environ Qualification Rept for safety-related Equipment,Per 10CFR50.49 & SER (NUREG-1031) + (06:25:44, 13 December 2024)
- ML20108E480 + (06:25:44, 13 December 2024)
- ML20108E424 + (06:25:45, 13 December 2024)
- ML20108E437 + (06:25:45, 13 December 2024)
- LIC-96-0065, Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment + (06:25:46, 13 December 2024)
- 05000261/LER-1985-005-02, :on 850109,reactor Trip Occurred at 14% Power in Steam Generator A.Caused by Turbine Trip.Feedwater Control Valves Observed & Determined to Be Stable + (06:25:51, 13 December 2024)
- LIC-96-0061, Forwards Response to Violations Noted in Insp Rept 50-285/96-01.Corrective Actions:Reminder Added to Operations Dept Night Notes on Requirement to Initiate CR on 960412 + (06:25:52, 13 December 2024)
- NRC-96-0050, Provides Response to Re Util Request to Increase Allowed out-of-service Time for 1 Onsite AC Electrical Power Division + (06:25:53, 13 December 2024)
- GO2-96-095, Forwards Rev 31 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 + (06:25:54, 13 December 2024)
- ML20108E394 + (06:25:54, 13 December 2024)
- ML20108E384 + (06:25:55, 13 December 2024)
- ML20108E380 + (06:25:57, 13 December 2024)
- ML20108E371 + (06:25:58, 13 December 2024)
- ML20108E366 + (06:25:59, 13 December 2024)
- ML20108E359 + (06:26:00, 13 December 2024)
- ML20108E363 + (06:26:00, 13 December 2024)
- ML20108E355 + (06:26:01, 13 December 2024)
- 05000266/LER-1996-001, :on 960405,inadvertent ESF Actuation in Train B Due to DC Sys Ground Occurred.Caused by Inadequate Ground Search Technique.Site Engineering Personnel Will Be Involved in Ground Detection Needed on DC Sys + (06:26:02, 13 December 2024)
- 05000331/LER-1996-002, :on 960408,PCIS Half Group III Isolation Occurred Due to Blown Fuse During Maint.Reviewed Event W/ Maint Technicians to Reinforce Need to Secure Loose Cables During Maint Activities + (06:26:05, 13 December 2024)
- ML20108E338 + (06:26:06, 13 December 2024)
- ULNRC-03375, Responds to NRC Bulletin 96-001, Control Rod Insertion Problems + (06:26:06, 13 December 2024)
- ML20108E333 + (06:26:07, 13 December 2024)
- 05000271/LER-1996-009, :on 960404,determined Combustible Polystyrene Matl Present in Joints Between Turbine,Radwaste,Reactor & Control Bldgs.Caused by Personnel Error.Two H Roving Fire Watch Established in Adjoining Radwaste Bldg + (06:26:09, 13 December 2024)
- ML20108E325 + (06:26:10, 13 December 2024)
- ML20108E319 + (06:26:11, 13 December 2024)
- ML20108E317 + (06:26:11, 13 December 2024)
- BECO-85-051, Suppl Response to NUREG-0803, Generic SER Re Integrity of BWR Scram Sys Piping. Seismic Reanalysis of Scram Discharge Vols Performed.Updates to Isometrics to Reflect as-built Configuration Expected by 850401 + (06:26:12, 13 December 2024)
- ML20108E297 + (06:26:13, 13 December 2024)
- ML20108E249 + (06:26:14, 13 December 2024)
- 05000237/LER-1985-005-04, :on 850130,Group II Isolation Occurred While Returning Level Transmitter 2-263-S8B to Svc.Cause Under Investigation.Supplemental Rept Will Be Issued When Root Cause Determined + (06:26:15, 13 December 2024)
- B11474, Forwards Amend 12 to FSAR for Millstone Unit 3.Revised Responses to Selected Requests for Addl Info,Per 830503,31 & 1203 Ltrs,Included + (06:26:16, 13 December 2024)
- ML20108E207 + (06:26:17, 13 December 2024)
- ML20108E216 + (06:26:17, 13 December 2024)
- ML20108E193 + (06:26:18, 13 December 2024)
- ML20108E191 + (06:26:19, 13 December 2024)
- ML20108E186 + (06:26:20, 13 December 2024)
- ML20108E167 + (06:26:21, 13 December 2024)
- ML20108E181 + (06:26:21, 13 December 2024)