Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20111B078 + (06:18:38, 13 December 2024)
- BSEP-96-0186, Informs of Relocation of Joint Info Ctr + (06:18:39, 13 December 2024)
- ML20111B066 + (06:18:39, 13 December 2024)
- RBG-42888, Forwards Summary of Startup Physics Testing Conducted on Cycle 7 Core Reload + (06:18:40, 13 December 2024)
- ML20111B064 + (06:18:40, 13 December 2024)
- 3F0596-04, Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Vessel or Over Safety-Related Equipment + (06:18:41, 13 December 2024)
- ML20111B050 + (06:18:42, 13 December 2024)
- ML20111B052 + (06:18:42, 13 December 2024)
- 05000327/LER-1984-073, :on 841212,110 Fire Doors Failed to Meet Ul Stds.Caused by Maint & Mods Performed on Doors.Fire Watches Set Per Tech Specs & Mod/Repair Schedule & long-term Maint Being Addessed + (06:18:44, 13 December 2024)
- 05000311/LER-1984-025-01, :on 841126,audit Revealed That Weekly Plant Vent Particulate Sample for 840927 Not Analyzed within Time Required by Tech Specs.Caused by Personnel Error.Procedures Revised + (06:18:46, 13 December 2024)
- ML20111B046 + (06:18:47, 13 December 2024)
- NSD-NRC-96-4704, Forwards Draft TSs 5.1,5.2 & 5.3 for Use in Preliminary Review of SSAR Section 18.7 + (06:18:47, 13 December 2024)
- 05000362/LER-1984-041-01, :on 841126,containment Purge Isolation Sys Train Actuated.Caused by Grounding of Ac Power Cord Damaged by Drawer Removal from Plant Protection Sys.Personnel Cautioned + (06:18:55, 13 December 2024)
- ML20111B036 + (06:18:56, 13 December 2024)
- ML20111B033 + (06:18:57, 13 December 2024)
- 05000454/LER-1984-021-05, :Between 841127 & 1203,main Control Room Process Radiation Monitors Failed Automatic Check Source Tests,Causing Ventilation Sys to Switch to ESF Mode.Caused by Insufficient Tolerance in Setpoints + (06:18:58, 13 December 2024)
- RBG-19761, Interim Deficiency Rept DR-177 Re Installation,Design & Mfg of Coaxial & Instrumentation Cable for Neutron Monitoring Sys.Next Rept Will Be Provided by 850111 + (06:18:59, 13 December 2024)
- RBG-19757, Interim Deficiency Rept DR-225 Re Motor Torque Specified for Motor Operated Valves Supplied by Velan Engineering,Ltd.Next Rept Will Be Provided by 850121 + (06:19:00, 13 December 2024)
- ML20111B022 + (06:19:04, 13 December 2024)
- RBG-19758, Interim Deficiency Rept DR-243 Re Installation of Pacific Scientific Snubbers (PSA 10) & Bergen Paterson Clamps (PT 1001-15).Next Rept Will Be Provided by 850122 + (06:19:05, 13 December 2024)
- ML20111B019 + (06:19:06, 13 December 2024)
- 05000352/LER-1984-017, :on 841127,improper Setpoint for Chlorine Analyzer Trip Switch Found.Caused by Personnel Error.Calibr Performed Immediately & Personnel Counseled Re Procedures + (06:19:07, 13 December 2024)
- ML20111B014 + (06:19:08, 13 December 2024)
- RBG-19736, Final Deficiency Rept DR-220 Re Tdi Standby Diesel Generator Cylinder Head Valve Seats.Initially Reported on 841119. Cylinder Heads Replaced + (06:19:09, 13 December 2024)
- ML20111B013 + (06:19:09, 13 December 2024)
- ML20111B006 + (06:19:10, 13 December 2024)
- RBG-19756, Interim Deficiency Rept DR-203 Re Arc Strikes on Interior Surface of Seven of Eight Air Start Receiver Tanks on Standby Diesel Generators Supplied by Tdi.Next Rept Will Be Submitted by 850110 + (06:19:11, 13 December 2024)
- TAC:55409 + (06:19:11, 13 December 2024)
- ML20111B000 + (06:19:13, 13 December 2024)
- RBG-19389, Corrected Interim Deficiency Rept DR-182 Re Limitorque Motor Operator Failure on Feedwater Isolation Valve.Next Rept Will Be Provided by 850130 + (06:19:13, 13 December 2024)
- HL-5164, Forwards MOR for April 1996 for Ei Hatch Nuclear Plant & Revised Rept for Mar 1996 + (06:19:14, 13 December 2024)
- AECM-85-0050, Special Rept 84-37/1:on 841129,loose Parts Detection Sys Declared Inoperable for 30 Days Reaching Time Limit of Tech Spec.Caused by Alarm Susceptibility to Changing Plant Conditions.Alarm Response Instruction Revised + (06:19:15, 13 December 2024)
- BSEP-84-2766, LER 1-84-18 Re Support to Snubber 1-E11-84SS491 Found to Be Reportable Per 10CFR50.73.LER Number 1-84-18 May Be Reassigned + (06:19:15, 13 December 2024)
- 3F0596-07, Provides Interpretation of Status of Exemption from 10CFR70.24, Criticality Accident Requirements + (06:19:16, 13 December 2024)
- ML20111A975 + (06:19:17, 13 December 2024)
- 05000454/LER-1984-018-06, :on 841128,HVAC Outside Air Vent Fan Started During Filter Change.Caused by Monitor Tripping During Filter Change.Procedures Revised So Filter Changes Will Not Cause Radiation Monitors to Trip + (06:19:18, 13 December 2024)
- HL-5153, Forwards Description of Util Insp Plan,Results of Initial & Expanded Scope Insps & Evaluation of Findings of Augmented ISI of Core Shroud Vertical Welds + (06:19:19, 13 December 2024)
- ML20111A966 + (06:19:20, 13 December 2024)
- 05000454/LER-1984-019-05, :on 841127,boron Dilution Protection Isolation Sys Actuated.Caused by Noise Spike on Source Range Channels. Westinghouse Requested to Investigate Means of Filtering Out Noise Spikes + (06:19:22, 13 December 2024)
- ML20111A960 + (06:19:23, 13 December 2024)
- 05000389/LER-1984-011-03, :on 841121,reactor Tripped Due to Loss of Turbine Load & Auxiliary Feed Pump C Tripped on Overspeed. Caused by Generator Exciter Bearing Failure & Steam Leakage, Respectively.Bearing Replaced + (06:19:25, 13 December 2024)
- ML20111A955 + (06:19:26, 13 December 2024)
- 05000413/LER-1984-027-01, :on 841126,RCS Boron Concentration Decreased to Less than 2,000 Parts Per Million.Cause Unknown.Boric Acid Added to Bring Level Above 2,000 Part Per Million + (06:19:27, 13 December 2024)
- ML20111A953 + (06:19:29, 13 December 2024)
- 05000364/LER-1996-001-01, :on 960408,2B DG Experienced Reduction Followed by Resumption in Speed During Auto Start Surveillance Test. Caused by Procedural Inadequacy.Dg Test Procedures Revised to Ensure Relay Actuated/Reset W/Proper Delays + (06:19:30, 13 December 2024)
- HL-5162, Forwards Rev 0 to Ei Hatch Nuclear Plant Unit 1,Cycle 17 Colr + (06:19:32, 13 December 2024)
- ML20111A950 + (06:19:32, 13 December 2024)
- PY-CEI-NRR-2049, Notifies of Completion of GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance Activities + (06:19:33, 13 December 2024)
- ML20111A944 + (06:19:34, 13 December 2024)
- 05000389/LER-1984-010-03, :on 841119,inservice Insp Surveillance Requirements of Tech Spec 4.7.9 Performed & 19 Snubbers Declared Inoperable as Result.All Inoperable Snubbers Replaced or Repaired + (06:19:36, 13 December 2024)
- 05000251/LER-1984-025-01, :on 841124,reactor Trip Occurred.Caused by Ground in One Stab Connector of Reactor Coolant Pump 4a Breaker.Unit Brought to Refueling Shutdown Condition to Deenergized 4a 4-kV Bus for Insp & Repair + (06:19:37, 13 December 2024)
- 05000285/LER-1984-024, :on 841126,unplanned Ventilation Isolation Actuation Sys Actuation Occurred.Caused by Operator Changing Ventilation Discharge Duck Monitor RM-061 to High Alert/Alarm Setpoints During Temp Inversion + (06:19:40, 13 December 2024)