Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116K778 + (03:20:12, 13 December 2024)
- ML20116K771 + (03:20:13, 13 December 2024)
- ML20116K774 + (03:20:13, 13 December 2024)
- ML20116K770 + (03:20:14, 13 December 2024)
- ML20116K766 + (03:20:18, 13 December 2024)
- ML20116K760 + (03:20:18, 13 December 2024)
- ML20116K758 + (03:20:19, 13 December 2024)
- ML20116K756 + (03:20:20, 13 December 2024)
- HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 + (03:20:21, 13 December 2024)
- U-602064, Monthly Operating Rept for Oct 1992 for Clinton Power Station Unit 1 + (03:20:21, 13 December 2024)
- ML20116K737 + (03:20:24, 13 December 2024)
- ML20116K734 + (03:20:25, 13 December 2024)
- 2CAN119201, Confirms That Initial Tests & Activities Described in Correspondence Re GL 89-13, Service Water Sys Problems Affecting Safety-Related Equipment, Have Been Completed for ANO-2 + (03:20:26, 13 December 2024)
- ML20116K729 + (03:20:26, 13 December 2024)
- 05000366/LER-1992-020-01, :on 921010,determined That Sealing Devices for 22 Spare Unit 2 Primary Containment Penetrations Did Not Meet ASME Requirements.Caused by Construction Error.Sealing Devices Will Be Replaced to Meet ASME Code + (03:20:29, 13 December 2024)
- ML20116K704 + (03:20:31, 13 December 2024)
- ML20116K701 + (03:20:33, 13 December 2024)
- ML20116K698 + (03:20:36, 13 December 2024)
- ML20116K689 + (03:20:37, 13 December 2024)
- HL-5222, Notifies That Southern Operating Company Telephone Prefix Has Been Changed.Old Prefix Will Be Discontinued as of 961101 + (03:20:38, 13 December 2024)
- ML20116K683 + (03:20:38, 13 December 2024)
- ML20116K678 + (03:20:40, 13 December 2024)
- ML20116K670 + (03:20:41, 13 December 2024)
- ML20116K669 + (03:20:42, 13 December 2024)
- ML20116K665 + (03:20:46, 13 December 2024)
- ML20116K664 + (03:20:47, 13 December 2024)
- ML20116K659 + (03:20:48, 13 December 2024)
- ML20116K657 + (03:20:49, 13 December 2024)
- ML20116K650 + (03:20:49, 13 December 2024)
- 05000254/LER-1985-012-03, :on 850327,0418 & 19,fuel Pool Radiation Monitors 1A & 1B Spiked Upscale,Energizing Fuel Pool High Radiation Alarms.Caused by Loose Capacitor in Radiation Monitor Sensor Unit.Connection Repaired + (03:20:51, 13 December 2024)
- ML20116K634 + (03:20:53, 13 December 2024)
- ML20116K633 + (03:20:54, 13 December 2024)
- ML20116K626 + (03:20:58, 13 December 2024)
- ML20116K623 + (03:21:01, 13 December 2024)
- ML20116K620 + (03:21:03, 13 December 2024)
- ML20116K621 + (03:21:03, 13 December 2024)
- ML20116K615 + (03:21:04, 13 December 2024)
- NSD-NRC-96-4796, Forwards AP600 Passive Sys Reliability Roadmap.Roadmap Provides Overview of Types of Design & Design Certificate Activities,Contribute to Passive Sys Reliability & Refs Associated Documents Related to Activity + (03:21:05, 13 December 2024)
- ML20116K604 + (03:21:06, 13 December 2024)
- ML20116K594 + (03:21:06, 13 December 2024)
- ML20116K583 + (03:21:08, 13 December 2024)
- ML20116K587 + (03:21:08, 13 December 2024)
- ST-HL-AE-4251, Responds to NRC Re Violation Noted in Insp Rept 50-498/92-26.Corrective Actions:Plant Bulletin Issued Reiterating Requirements to Signoff,Check or Initial Work Performance as Soon as Practical + (03:21:09, 13 December 2024)
- ML20116K579 + (03:21:10, 13 December 2024)
- HL-3021, Monthly Operating Repts for Ei Hatch Nuclear Plant,Units 1 & 2 + (03:21:11, 13 December 2024)
- ST-HL-AE-4250, Responds to NRC Re Violation Noted in Insp Rept 50-499/92-26.Corrective Action:Individual Svc Requests Will Be Issued to Perform Insp & PMT of Remaining Breakers Ref in SR 115415 & Maint Planner Guide Revised + (03:21:11, 13 December 2024)
- ST-HL-AE-4262, Special Rept:On 921014,Standby Diesel Generater 12 Shed Load to 0 Kw Due to Failure of Swing Disk Check Valve in Fuel Supply Line.Damaged Check Valve Replaced & Internals Removed.Remaining Check Valves Inspected + (03:21:12, 13 December 2024)
- NRC-92-0110, Monthly Operating Rept for Oct 1992 for Fermi 2 + (03:21:13, 13 December 2024)
- ML20116K554 + (03:21:14, 13 December 2024)
- ST-HL-AE-4263, Monthly Operating Repts for Oct 1992 for STP Electric Generating Station,Units 1 & 2 + (03:21:15, 13 December 2024)
- ML20116K546 + (03:21:16, 13 December 2024)