NRC-92-0110, Monthly Operating Rept for Oct 1992 for Fermi 2
| ML20116K556 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/31/1992 |
| From: | Orser W, Stone B DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-92-0110, CON-NRC-92-110 NUDOCS 9211170251 | |
| Download: ML20116K556 (4) | |
Text
._.
c, 4 '
a
- "MAf=.,,
Detroit-r-o Ec!ison w=eo~ene+n aes outoa ' '6 uoo w November 13, 1992 WRC-92-0110 U. S. Nuclear Ecqulatory Comm1Arion Attenticn: Document Control Desk Washington, D.C.
20555
Reference:
Fermi 2 NRC Doc!:r'. No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating, Status Report for October, l
1992 l
Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for October, 1992. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Poster Reductione -
identified in NRC Regulatory Juide 1.16 a.'d Fermi 2 Technical Specification 6.9 1.6.
If you have any questions, please contact Brian Stone, at (313) 586-5148.
Sincerely, Enclosure cc:
T. G. Colburn A. B. Davis D. E. Hahn H. P. Phillip; K. R. Riemer P. L. Torpey 170.014 9211170251 921031 I
I PDR-- ADOCK 05000341 R:
OPERATING DATA REl' ORT DOCKET NO. 50-341 COMPLETED BY pb,J. Stone DATE November 13, 1992 TELEPHCNE (313) 586-5148 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
(1) Calculated using f
2.
REPORTING PERIOD: October, 1992 l weighted averages to reflect l
3 LICENSED THERMAL POWER (MWL):
3293 1 variations in HDC.
I 4.
NAMEPLATE RATING (GROSS HWe):
1154 I
I 5.
DESIGN ELECT Rt. TING (Not HWe):_1023 l
l 6.
HAX DEPENDABLE CAP (GROSS HWe):1110 l
l 7
MAX DEPENDABLE CAP (Not NWe):1060 __
l l
8.
IF CHANGES OCCUR IN CAPACITY RATIdGS (ITEMS KUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVS REASONS: N/A 9
POWER LEVEL TO WHICl! RESTRICTED, IF ANY (HWe Net):
N/t.
- 10. REASONS FOR RESTRICTION, IF ANY:
N/A TIIIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 745 7,320 41,846
- 12. HRS REACTOR WAS CRITICAL 0
6,015 3 31,279
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. F' <URS GENERATOR ON-LINE O
5,982.8
___ 30,009.6
- 15. UNIT RESERVR SHUTDOWN 110URS 0
0 0
- 16. GROSS TIIERMAL ENERGY GEN (WWil) 0 19,481,040 90,962,231.4
- 17. GROSS ELECT ENERGY GEN (HWH) 0 6,623,970 30,272,007 18.-NET ELECT ENERGY GEN (HWH) 0 6,344,765 28,937,001
- 19. UN! ' SERVICE FACTOR 0
81.7 71 7
- 20. UNIT AVAILAEILITY FACTOR 0
81.7 71.7
- 22. UNIT CAP FACTOR (USING DER NET) 0 79.3 63.3
- 23. UNIT FORCED OUTAGE RATE O
2.3 79
- 24. SliUTDOWNS SLHEDULED OVER NEXT 6 HONTilS (TYPE, DATE, DIIRATION OF EACH):
Refueling: Started September 12, 1992: Duration 57 uays.
- 25. IF SHUT DOWN AT END OF REPORT PEhIOD, ESTIMATED DATE OF STARTUP:
November 7, 1992.
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECASf ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL-OPERATION N/A
__,N/A
AVERhCE DAILY UNIT POWER 1EVEL DOCKET NO.
50-341 UNIT FERMI 2 DATE Novemter 13, 1992 COMPLETED BY E. Dawson TELEP110NE (313) 586-5027 Aonth October, 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)
(HWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 O_
25 0
10 o
O 11 0
27 3
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
- '...;. y.
~"
w UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NO.
50-347 DATE tovember 13. 1992 UNIT NAME Fermi ?
COM4LETED BY B.
J.
Stone TELEPHONE D13) 586-5148 4
REPORT MONTH October. 1992 l
METHOD OF LER l SYS COMP CAUSE & CORRECTIVE i
NO.
DATE TYPE DUR REASON SHUTTING DOWN NO.
CODE CODE ACTION TO PREVENT (1)
(HRS)
(2)
THE REACTOR (4)
(5)
RECURRENCE f6)
(3) 1 L
S 92-02 09/12/92 S
1198.8 C
1 N/A Scheduled refueling outage number 3 in progress.
(1) F: FORCED (2i REASON:
(3) METHOD:
(4) EXHIBIT G - INSTRUCTIONS Sr SCHEDULED A - EQUIPM5.NT FAILURE (EXPLAIN) 1 - MANUAL FOR PREDARATION OF DATA
'.}
e MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D ~ REGULATORY RESTRICTION 4 - CONT:NUED (NUREG-0161)
E - OPEP.* TOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G - OPERATIONAL EPROR (EXPLAIN)
H-OTHER (EXPLAIN)
(S) EXHIBIT 1 - SAME SOURCE (6) R - PREFIX INDICATES POwtR REDUCTION.
S - DREFIX INDICATES PLANT SHUTDOWN.
t L
9 w
b i
9 g
u
,