Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117B715 + (03:01:51, 13 December 2024)
- ML20117B704 + (03:01:52, 13 December 2024)
- ML20117B699 + (03:01:53, 13 December 2024)
- ML20117B701 + (03:01:53, 13 December 2024)
- ML20117B678 + (03:01:54, 13 December 2024)
- ML20117B666 + (03:01:55, 13 December 2024)
- ST-HL-AE-1240, Forwards Main Cooling Reservoir Embankment Summary Rept Re Erosion Effects Due to Dike Failure Identified in 10CFR50.55(e) Repts.Analyses Demonstrate Adequate Margin of Safety.Design Basis Contingent Upon Listed Items + (03:01:56, 13 December 2024)
- ML20117B607 + (03:01:57, 13 December 2024)
- LIC-96-0120, Forwards Revs to EPIPs Including Pp 1 of FC-EPF Forms Index, Rev 5 to FC-EPF-1, Alert Notification Sys Accidental Activation Rept Form, RERP Index & Rev 26 to RERP-Section H, Emergency Facilities & Equipment + (03:01:58, 13 December 2024)
- 05000272/LER-1984-008, :on 840309,during Refueling Outage,Radiography of 16 Welds in Svc Water Piping Associated W/Component Cooling HX 12 Revealed Possible Indications in 9 Welds. Caused by Low Velocity Water in Piping + (03:01:59, 13 December 2024)
- ML20117B584 + (03:02:01, 13 December 2024)
- ML20117B523 + (03:02:02, 13 December 2024)
- ML20117B581 + (03:02:02, 13 December 2024)
- ML20117B512 + (03:02:03, 13 December 2024)
- ML20117B509 + (03:02:04, 13 December 2024)
- ML20117B508 + (03:02:05, 13 December 2024)
- ML20117B475 + (03:02:06, 13 December 2024)
- ML20117B472 + (03:02:06, 13 December 2024)
- LIC-96-0127, Requests Termination of Senior Reactor Operator License of Ja Spilker,SOP-43182-2 + (03:02:07, 13 December 2024)
- ML20117B464 + (03:02:08, 13 December 2024)
- ML20117B455 + (03:02:09, 13 December 2024)
- ML20117B452 + (03:02:10, 13 December 2024)
- ML20117B450 + (03:02:11, 13 December 2024)
- ML20117B446 + (03:02:12, 13 December 2024)
- 05000327/LER-1985-015, :on 850404,hourly Fire Watch for Auxiliary Bldg Supply Air Fan Room Not Conducted.Caused by Inoperable Door. Door repaired,post-maint Check Made & Fire Watch Reestablished + (03:02:14, 13 December 2024)
- 05000327/LER-1996-009-01, :on 960718,auxiliary Building Secondary Containment Boundary/Fire Barrier Not Maintained as Required by Design.Caused by Failure to Follow Design Control Process + (03:02:16, 13 December 2024)
- AECM-85-0135, Forwards Endorsement 4 to Nelia Certificate N-79 & Endorsement 4 to Maelu Certificate M-79 + (03:02:17, 13 December 2024)
- ML20117B383 + (03:02:18, 13 December 2024)
- ML20117B333 + (03:02:19, 13 December 2024)
- ML20117B346 + (03:02:19, 13 December 2024)
- 05000352/LER-1985-037, :on 850326,during Cold Shutdown,Loca Signal Received,Resulting in LPCI Sys B Injection Into Reactor Vessel.Caused by Personnel Error.Technician Counseled on Proper Valving Techniques + (03:02:21, 13 December 2024)
- 05000352/LER-1985-038, :on 850328,inboard RHR Shutdown Cooling Suction Valve Received Isolation Signal.Caused by Procedural Inadequacy.Isolation Logic Reset & Shutdown Cooling Sys Returned to Svc + (03:02:26, 13 December 2024)
- 05000278/LER-1985-009-01, :on 850328,insp Plate Discovered Missing from Standby Gas Treatment Sys Suction Plenum,Affecting Secondary Containment Capacity.Caused by Maint Personnel Removing Plate for Fan Insp.Plate Reinstalled + (03:02:28, 13 December 2024)
- ML20117B283 + (03:02:29, 13 December 2024)
- ML20117B269 + (03:02:29, 13 December 2024)
- ML20117B248 + (03:02:30, 13 December 2024)
- ML20117B234 + (03:02:31, 13 December 2024)
- ML20117B238 + (03:02:31, 13 December 2024)
- ML20117B222 + (03:02:32, 13 December 2024)
- ML20117B184 + (03:02:33, 13 December 2024)
- ML20117B186 + (03:02:33, 13 December 2024)
- ML20117B161 + (03:02:34, 13 December 2024)
- ML20117B153 + (03:02:35, 13 December 2024)
- ML20117B146 + (03:02:35, 13 December 2024)
- ML20117B142 + (03:02:36, 13 December 2024)
- ML20117B119 + (03:02:38, 13 December 2024)
- ML20117B112 + (03:02:39, 13 December 2024)
- ML20117B033 + (03:02:40, 13 December 2024)
- NSD-NRC-96-4783, Forwards Rev 9 of AP600 SSAR + (03:02:41, 13 December 2024)
- 1CAN089601, Forwards Errors or Changes in Emergency Core Cooling Sys Evaluation + (03:02:44, 13 December 2024)
- ML20117A936 + (03:02:47, 13 December 2024)