Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20125B828 + (01:55:32, 13 December 2024)
- ML20125B827 + (01:55:32, 13 December 2024)
- ML20125B826 + (01:55:33, 13 December 2024)
- 05000423/LER-1992-028, :on 921116,reactor Trip Signal Occurred Due to IR High Level Signal.Caused by Cognitive Personnel Error. Review of Prerequistes & Methods for Conducting Surveillance Testing Underway + (01:55:35, 13 December 2024)
- ML20125B823 + (01:55:36, 13 December 2024)
- ML20125B822 + (01:55:37, 13 December 2024)
- ML20125B819 + (01:55:38, 13 December 2024)
- ML20125B821 + (01:55:38, 13 December 2024)
- ML20125B817 + (01:55:39, 13 December 2024)
- ML20125B816 + (01:55:40, 13 December 2024)
- ML20125B813 + (01:55:41, 13 December 2024)
- ML20125B814 + (01:55:41, 13 December 2024)
- ML20125B812 + (01:55:42, 13 December 2024)
- ML20125B810 + (01:55:43, 13 December 2024)
- ML20125B809 + (01:55:43, 13 December 2024)
- ML20125B807 + (01:55:44, 13 December 2024)
- ML20125B808 + (01:55:44, 13 December 2024)
- ML20125B806 + (01:55:45, 13 December 2024)
- ML20125B803 + (01:55:46, 13 December 2024)
- ML20125B801 + (01:55:46, 13 December 2024)
- ML20125B800 + (01:55:47, 13 December 2024)
- ML20125B798 + (01:55:48, 13 December 2024)
- ML20125B799 + (01:55:48, 13 December 2024)
- ML20125B797 + (01:55:49, 13 December 2024)
- ML20125B795 + (01:55:49, 13 December 2024)
- ML20125B794 + (01:55:50, 13 December 2024)
- ML20125B792 + (01:55:51, 13 December 2024)
- 05000423/LER-1992-025, :on 921102,LCO 3.4.9.2.a Not Initiated for Pressurizer Heatup.Caused by Lack of Detailed Procedural Guidance & Licensed Operator Error.Procedure Change Re Insurge During Plant Heatup Implemented + (01:55:53, 13 December 2024)
- ML20125B790 + (01:55:54, 13 December 2024)
- PNO-V-85-033, on 850605,Channel C Reactor Trip Breaker Failed to Open During Surveillance Testing of Undervoltage Trip Attachment.Preliminary Info Indicates That Failed Breaker Refurbished During Current Outage + (01:55:55, 13 December 2024)
- ML20125B788 + (01:55:55, 13 December 2024)
- IR 05000089/1985001 + (01:55:56, 13 December 2024)
- ML20125B784 + (01:55:57, 13 December 2024)
- ML20125B785 + (01:55:57, 13 December 2024)
- ML20125B783 + (01:55:58, 13 December 2024)
- ML20125B781 + (01:55:59, 13 December 2024)
- ML20125B782 + (01:55:59, 13 December 2024)
- ML20125B779 + (01:56:00, 13 December 2024)
- ML20125B778 + (01:56:00, 13 December 2024)
- 05000333/LER-1992-047, :on 921104,automatic Shutdown Cooling Occurred Due to Loss of Power to Rps.Caused by Voltage Drop When Starting Large Electrical Load.Protective Device Setpoint Will Be Evaluated + (01:56:03, 13 December 2024)
- ML20125B775 + (01:56:04, 13 December 2024)
- ML20125B774 + (01:56:05, 13 December 2024)
- ML20125B773 + (01:56:05, 13 December 2024)
- ML20125B769 + (01:56:06, 13 December 2024)
- ML20125B767 + (01:56:07, 13 December 2024)
- ML20125B766 + (01:56:08, 13 December 2024)
- ML20125B765 + (01:56:08, 13 December 2024)
- ML20125B764 + (01:56:09, 13 December 2024)
- ML20125B763 + (01:56:09, 13 December 2024)
- ML20125B762 + (01:56:10, 13 December 2024)
- ML20125B757 + (01:56:11, 13 December 2024)