Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000366/LER-1985-008-01, :on 850420,reactor Water Cleanup Outboard Isolation Valve 2G31-F004 Isolated on High Differential Flow.Caused by Flow Fluctuation During Valving in of Filter Demineralizer 2A.Valve Opened + (18:26:47, 12 December 2024)
- LIC-93-0075, Monthly Operating Rept for Jan 1993 for Fcs,Unit 1 + (18:26:48, 12 December 2024)
- ML20128K652 + (18:26:49, 12 December 2024)
- ML20128K650 + (18:26:50, 12 December 2024)
- ML20128K648 + (18:26:51, 12 December 2024)
- ML20128K647 + (18:26:52, 12 December 2024)
- ML20128K644 + (18:26:53, 12 December 2024)
- B11575, Forwards Rev 1 to Radiological Effluent Monitoring & Offsite Dose Calculation Manual. Process Control Program Also Encl.Info Responds to Unit 3 SER Confirmatory Items 59 & 60 + (18:26:55, 12 December 2024)
- B14350, Provides Actual Operation & Maint Expenditures for 1992 & Revised Budget & Forecasts for Yrs 1993-95,per 920513,0604 & 30 Ltrs + (18:26:56, 12 December 2024)
- ML20128K639 + (18:26:56, 12 December 2024)
- ML20128K638 + (18:26:58, 12 December 2024)
- ML20128K636 + (18:26:59, 12 December 2024)
- ML20128K634 + (18:27:00, 12 December 2024)
- ML20128K632 + (18:27:01, 12 December 2024)
- LIC-93-0018, Responds to NRC Re Violations Noted in Insp Rept 50-285/92-32 on 921214-18.Corrective Actions:Procedure Re Removal & Disposal of CH-17A & CH-17B Filter Cartridges Revised to Ensure Filter Kept Wet Until Changeout + (18:27:02, 12 December 2024)
- ML20128K630 + (18:27:03, 12 December 2024)
- PNO-III-96-058B, 961004,second Update Re Preliminary Findings of Two NRC Team Insps Stemming from Utils Handling of Recirculation Pump Seal Leak & Shutdown of Plant on 960906. Plant Will Remain Shutdown Until 961013 Refueling Outage + (18:27:04, 12 December 2024)
- IR 05000424/1985019 + (18:27:26, 12 December 2024)
- ML20128K627 + (18:27:28, 12 December 2024)
- ML20128K624 + (18:27:29, 12 December 2024)
- ML20128K623 + (18:27:30, 12 December 2024)
- B11584, Application for Amends to Licenses DPR-61,DPR-21 & DPR-65, Changing Tech Specs Re Reportable Events & Reporting Requirements in Response to Revs to 10CFR50.72 & 73 & Generic Ltr 83-43.Proposed Tech Spec Revs Encl + (18:27:31, 12 December 2024)
- AECM-85-0149, Forwards Rev 0 to App a of Spec MP&L-M-189.1, Max Stroke Times for Power Actuated Valves, Providing Max Allowable Stroke Time Values for All Power Operated Valves Subj to Inservice Testing & Addl Relief Requests + (18:27:33, 12 December 2024)
- 05000373/LER-1985-047-01, :on 850610,four Samples of Hydrogen Concentration of Offgas Sys Collected at Incorrect Location Due to Confusion Re Which Prefilter in Operation.Sign Posted to Alert Personnel + (18:27:38, 12 December 2024)
- ML20128K616 + (18:27:40, 12 December 2024)
- ML20128K615 + (18:27:41, 12 December 2024)
- ML20128K614 + (18:27:42, 12 December 2024)
- ML20128K612 + (18:27:43, 12 December 2024)
- ML20128K611 + (18:27:44, 12 December 2024)
- 05000382/LER-1985-024, :on 850611,loss of Offsite Power Occurred Due to Loss of Side B 230-kV Incoming Feeder Line.Caused by Troubleshooting on Main Generator Oil Circuit Breaker B. Training Given on Oil Circuit Breaker Relays + (18:27:47, 12 December 2024)
- HL-5248, Requests Temporary Relief from Making ASME Code Repair on Unit 2 Plant Svc Water Valve 2P41-F332D.Addl Details Pertinent to This Request Encl + (18:27:49, 12 December 2024)
- ML20128K605 + (18:27:50, 12 December 2024)
- ML20128K601 + (18:27:51, 12 December 2024)
- ML20128K600 + (18:27:52, 12 December 2024)
- ML20128K597 + (18:27:54, 12 December 2024)
- ML20128K596 + (18:27:55, 12 December 2024)
- IR 05000341/1996008 + (18:27:57, 12 December 2024)
- ML20128K594 + (18:27:58, 12 December 2024)
- ML20128K591 + (18:27:59, 12 December 2024)
- ML20128K589 + (18:28:01, 12 December 2024)
- U-602092, Advises That All ERDS Activities,Outlined in Implementation Schedule Contained in Util Completed & ERDS Online & Ready for Operation,Should Need Arise + (18:28:02, 12 December 2024)
- ML20128K585 + (18:28:04, 12 December 2024)
- ML20128K584 + (18:28:05, 12 December 2024)
- ML20128K583 + (18:28:06, 12 December 2024)
- A10848, Forwards Copy of Agreement Entered Into Between Northeast Utilities & PM Blanch,In Response to 930211 Request. Agreement Withheld,Per 10CFR2.790 + (18:28:07, 12 December 2024)
- ML20128K579 + (18:28:07, 12 December 2024)
- ML20128K577 + (18:28:09, 12 December 2024)
- ML20128K575 + (18:28:10, 12 December 2024)
- ML20128K576 + (18:28:10, 12 December 2024)
- ML20128K574 + (18:28:11, 12 December 2024)
- ML20128K573 + (18:28:12, 12 December 2024)