Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129E702 + (16:32:57, 12 December 2024)
- ML20129E700 + (16:32:58, 12 December 2024)
- ML20129E699 + (16:32:59, 12 December 2024)
- ML20129E698 + (16:33:00, 12 December 2024)
- ML20129E696 + (16:33:01, 12 December 2024)
- ML20129E695 + (16:33:01, 12 December 2024)
- ML20129E693 + (16:33:02, 12 December 2024)
- 05000315/LER-1985-021, :on 850429,reactor Vessel Flow Requirement Not Verified Prior to RCS Boron Dilution.Procedure for Filling Reactor Refueling Cavity Revised to Include Verification/ Documentation of Reactor Vessel Flow During RCS Dilution + (16:33:04, 12 December 2024)
- ML20129E689 + (16:33:05, 12 December 2024)
- ML20129E686 + (16:33:06, 12 December 2024)
- ML20129E684 + (16:33:07, 12 December 2024)
- ML20129E682 + (16:33:11, 12 December 2024)
- ML20129E680 + (16:33:12, 12 December 2024)
- ML20129E679 + (16:33:13, 12 December 2024)
- RBG-21445, Forwards Revs to FSAR Section 1.8,including Discussion of Effect of Revs on Ser.No Impact on Tech Specs Expected.Revs Will Be Included in Future FSAR Amend + (16:33:14, 12 December 2024)
- NSD-NRC-96-4851, Submits non-proprietary & Proprietary Drafts of Section 3.0 of AP600 Notrump Verification & Validation Rept + (16:33:14, 12 December 2024)
- ML20129E672 + (16:33:15, 12 December 2024)
- ML20129E669 + (16:33:16, 12 December 2024)
- ML20129E668 + (16:33:17, 12 December 2024)
- B15944, Monthly Operating Repts for Sept 1996 for Millstone Nuclear Power Station Units 1,2 & 3 + (16:33:18, 12 December 2024)
- ML20129E665 + (16:33:19, 12 December 2024)
- ML20129E664 + (16:33:20, 12 December 2024)
- ML20129E663 + (16:33:21, 12 December 2024)
- ML20129E660 + (16:33:22, 12 December 2024)
- ML20129E662 + (16:33:22, 12 December 2024)
- NSD-NRC-96-4829, Forwards Rev 8 to GWGL022, AP600 Probabilistic Risk Assessment. Encl 2 in Form of Replacement Pages & Chapters to Be Added to Existing PRA Rept + (16:33:26, 12 December 2024)
- ML20129E657 + (16:33:27, 12 December 2024)
- ML20129E656 + (16:33:27, 12 December 2024)
- ML20129E655 + (16:33:28, 12 December 2024)
- ML20129E652 + (16:33:29, 12 December 2024)
- ML20129E650 + (16:33:29, 12 December 2024)
- ML20129E649 + (16:33:30, 12 December 2024)
- ML20129E648 + (16:33:31, 12 December 2024)
- ML20129E647 + (16:33:32, 12 December 2024)
- ML20129E646 + (16:33:33, 12 December 2024)
- AECM-85-0212, Forwards Preliminary Data in Support of NRC Review of Safety Relief Valve in-plant Test Plan,Per 850626 Telcon.Addl Tests Unnecessary + (16:33:34, 12 December 2024)
- ML20129E642 + (16:33:35, 12 December 2024)
- ML20129E641 + (16:33:36, 12 December 2024)
- ML20129E639 + (16:33:37, 12 December 2024)
- ML20129E636 + (16:33:38, 12 December 2024)
- 05000250/LER-1985-012, :on 850429,during shutdown,generator-main Transformer Lockout Relay Tripped,Resulting in Actuation of ESF Equipment.Caused by Personnel Error.Personnel Counseled. Transformer turn-ratio Tested + (16:33:40, 12 December 2024)
- ML20129E633 + (16:33:41, 12 December 2024)
- ML20129E632 + (16:33:42, 12 December 2024)
- ML20129E629 + (16:33:43, 12 December 2024)
- BECO-LTR-96-084, Requests Extension to 961218 to Respond to GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks + (16:33:44, 12 December 2024)
- ML20129E627 + (16:33:44, 12 December 2024)
- ML20129E625 + (16:33:46, 12 December 2024)
- ML20129E624 + (16:33:47, 12 December 2024)
- ML20129E622 + (16:33:48, 12 December 2024)
- 05000361/LER-1996-006, :on 960826,NRC Inspector Observed Local Voltage Meter for Vital Bus Inverter Y003 Indicating 122.5 Volt Ac. Caused by Util Not Providing Quantitative Operability Info. Occurrence Will Be Reviewed + (16:33:50, 12 December 2024)
- ML20129E619 + (16:33:52, 12 December 2024)