Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134B344 + (10:51:47, 12 December 2024)
- ML20134B340 + (10:51:48, 12 December 2024)
- ML20134B339 + (10:51:49, 12 December 2024)
- ML20134B337 + (10:51:49, 12 December 2024)
- ML20134B336 + (10:51:50, 12 December 2024)
- ML20134B332 + (10:51:51, 12 December 2024)
- ML20134B330 + (10:51:52, 12 December 2024)
- IR 05000528/1977003 + (10:51:53, 12 December 2024)
- ML20134B327 + (10:51:54, 12 December 2024)
- ML20134B322 + (10:51:55, 12 December 2024)
- ML20134B323 + (10:51:55, 12 December 2024)
- ML20134B319 + (10:51:56, 12 December 2024)
- ML20134B318 + (10:51:57, 12 December 2024)
- ML20134B315 + (10:52:02, 12 December 2024)
- 05000271/LER-1992-017, :on 920529 & 0623,EDG a Rendered Inoperable After Completing 8 H Monthly Surveillance.Caused by Crack in Cylinder Liner 7 & Cylinder Liner 10.Cylinder Liners Replaced.Not Reportable Per Part 21 + (10:52:04, 12 December 2024)
- ML20134B313 + (10:52:05, 12 December 2024)
- 05000344/LER-1993-001, :on 921008,determined That Sleeved Conduit Penetration Did Not Have Internal Seal Between Sleeve & Conduit Due to Personnel Error.Incorrect Drawing A-116 Revised to Show Wall Containing Penetration + (10:52:07, 12 December 2024)
- ML20134B309 + (10:52:08, 12 December 2024)
- ML20134B308 + (10:52:08, 12 December 2024)
- 05000353/LER-1993-002-01, :on 930124,improperly Connected Wires Discovered in Circuit Breakers Caused EDG to Be Inoperable & Violation of TS to Occur.Procedure S93.O.C Will Be Revised + (10:52:10, 12 December 2024)
- 05000266/LER-1993-001, Revised LER 93-001-00:on 930107,all 4,160 Volt Degraded Grid Voltage Protection Channels Declared Inoperable Due to Discovery That Settings for Relays on Subj Channels Being Too Low.Plant Mods Will Be Made + (10:52:12, 12 December 2024)
- ML20134B304 + (10:52:12, 12 December 2024)
- ML20134B301 + (10:52:13, 12 December 2024)
- 05000341/LER-1993-003, :on 930106,TS Required Recorder Discovered Not to Be Qualified Due to Procedural deficiency.Non-qualified Recorder Installed in Main Control Room Div 2 Panel Replaced W/Qualified Recorder + (10:52:15, 12 December 2024)
- 05000362/LER-1993-001, :on 930116,main Generator Tripped on Stator Ground Protection Signal Causing Turbine/Reactor Trip.Caused by Water Intrusion.Addl Sealing Provided for Main Generator Terminal Encl to Minimize Water Intrusion + (10:52:17, 12 December 2024)
- ML20134B295 + (10:52:18, 12 December 2024)
- ML20134B294 + (10:52:19, 12 December 2024)
- ML20134B292 + (10:52:20, 12 December 2024)
- 05000443/LER-1993-004, :on 930118,determined That 4 H Flow Estimate for Effluent Releases W/Flowmeter Inoperable Exceeded by 35 Minutes.Caused by Chemistry Technician Error.Technician Counseled & Event Will Be Reviewed + (10:52:21, 12 December 2024)
- ML20134B289 + (10:52:23, 12 December 2024)
- 05000443/LER-1992-026, :on 920714,discovered That Three of Four Cover Bolts on Resin Sluice Discharge Valve Fractured,Resulting in Loosening of Valve Bonnet.Caused by High Matl Hardness.Bolts in Plug Valves Replaced + (10:52:25, 12 December 2024)
- ML20134B287 + (10:52:26, 12 December 2024)
- 05000425/LER-1993-001-02, :on 930129,discovered That Low Temp Lift Settings on PORVs Incorrect & Valves Relied Upon to Meet TS Requirements for Cold Overpressure Protection Sys.Caused by Inadequate Procedures.Setpoints Corrected + (10:52:28, 12 December 2024)
- RBG-43-653, Forwards River Bend Station Tier II Chemical List Update + (10:52:29, 12 December 2024)
- 05000254/LER-1992-020, :on 920920,determined That TS 3.7.A.2.a.2 Limit Exceeded While Performing LLRT of Atmospheric Containment,Atmospheric Dilution & SGTR Isolation Valve. Caused by Bonnet Leak.Valve Flushed + (10:52:34, 12 December 2024)
- IR 05000528/1976004 + (10:52:37, 12 December 2024)
- 05000325/LER-1992-028, :on 921212,group 6 Reactor Bldg Ventilation Sys Isolation & SBGT Initiation for Both Units Occurred During Plant Modification Wire Lift.All Affected Sys Restored to Normal Standby Lineup + (10:52:39, 12 December 2024)
- ML20134B276 + (10:52:40, 12 December 2024)
- ML20134B275 + (10:52:42, 12 December 2024)
- ML20134B272 + (10:52:46, 12 December 2024)
- NSD-NRC-97-4953, Forwards One Page Statement of Intent to Be Filed in Copy of Emergency Response Guidelines Between Cover Page & Table of Contents + (10:52:46, 12 December 2024)
- ML20134B267 + (10:52:51, 12 December 2024)
- ML20134B266 + (10:52:51, 12 December 2024)
- 05000382/LER-1992-018-01, :on 920930,loss of 3A3-S Safety Bus Experienced When Bus Feeder Breaker Tripped Open on Degraded Voltage Condition.Caused by Personnel Error.Design Change Package Implementation Process Will Be Revised + (10:52:53, 12 December 2024)
- ML20134B264 + (10:52:54, 12 December 2024)
- 05000458/LER-1993-001, :on 930113,determined That RWCU Isolation Setpoint Allowable Value Was Exceeded Due to Faulty Thermocouple Tester.All Three STPs Were Performed in Jan 1993 & Improper Settings Corrected + (10:52:56, 12 December 2024)
- ML20134B262 + (10:52:57, 12 December 2024)
- ML20134B260 + (10:52:58, 12 December 2024)
- ML20134B259 + (10:53:02, 12 December 2024)
- ML20134B257 + (10:53:03, 12 December 2024)
- ML20134B258 + (10:53:03, 12 December 2024)