Text
._
1 January'28, 1997 Mr.. Jack D. Woodard.
Senior Vice' President -
Nuclear Operations ~-
Georgia Power Company-P. O. Box 1295
_ Birmingham, AL 35201
SUBJECT:
SAFETY EVALUATION FOR REVISED QUALITY ASSURANCE PROGRAM - EDWIN I.
{
HATCH UNITS 1 AND 2 (TAC NOS. M95754 AND M95755)-
)
J
Dear Mr. Woodard:
I
\\
12, 1996, and-supplemented September 4 and December 11, By letter dated June 1996, you submitted for NRC approval a revision to the Quality Assurance (QA)
}
program-for the Edwin I. Hatch Nuclear Plant, Units 1 and 2.
The proposed j
revision seeks permission to utilize a Qualified Reviewer (QR) to conduct 10 i
'CFR 50.59 screening evaluations of planned changes to.the plant procedures and programs, and the conduct of tests or~ experiments in lieu of the previous-practice.cf a~ Plant Review Board (PRB) review of such documents.
l 1
i i-Baeed on its review of the above submittals, the staff finds that your revised QA program is acceptable as documented in the enclosed Safety Evaluation.
h This completes'our action regarding the'above TACs.
Please contact me at
-(301) 415-1496 if you have any_ questions.
1 Sincerely, Original signed by:
Kahtan N. Jabbour, Senior Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of "uclear Reactor Regulation
~
Docket Nos. 50-321 and 50-366
Enclosure:
Safety Evaluation k
cc w/ enc 1: See next page l
Distribution:-
l 7
Docket File JZwolinski OGC PUBLIC HBerkow ACRS PD 11-2 Rdg.
LBerry EMerschoff, RII
@Ol /i SVarga KJabbour PSkinner, RII i
WHaass SBlack 300034 i
~
DOCUMENT NAME: G:\\ HATCH \\ HAT 95754.SER *See previous concurrence Ta rec +1ve a copy of this document, Indicate in the box BTCopy w/o attachment / enclosure E= Copy with attachment / enclosure N = No copy 0FFICE PM h E LA:PD II-h bE OGCNb BC:EMEB*
D:O-2 NAME'b O k r:cn LBerri b LMA SBlack
'H8er DATElk
/ /1Y97-k h[Y97
/ /11 /97 1/24/97
//lhg7 9701300028 970128 acFICIAL RECORD COPY PDR ADOCK 05000321 P
PDR ta w
a se
-e un
- n.
e e
w*-
g
O arrog 79 UNITED STATES g
j NUCLEAR RECULATORY COMMISSION WA8HINGTON, D.C. 20selM1001
/
January 28, 1997 Mr. Jack D. Woodard Senior Vice President -
l Nuclear Operations Georgia Power Company P. O. Box 1295 i
Birmingham, AL 35201
SUBJECT:
SAFETY EVALUATION FOR REVISED QUALITY ASSURANCE PROGRAM - EDWIN 1.
HATCH UNITS 1 AND 2 (TAC NOS. M95754 AND M95755)
Dear Mr. Woodard:
By letter dated June 12, 1996, and supplemented September 4 and December 11, 1996, you submitted for NRC approval a revision to the Quality Assurance (QA) program for the Edwin I. Hatch Nuclear Plant, Units 1 and 2.
The proposed revision seeks permission to utilize a Qualified Reviewer (QR) to conduct 10 CFR 50.59 screening evaluations of planned changes to the plant procedures and-programs, and the conduct of tests or experiments in lieu of the previous practice of a Plant Review Board (PRB) review of such documents.
Based on its review of the above submittals, the staff finds that your revised QA program is acceptable as documented in the enclosed Safety Evaluation.
This completes our action regarding the above TACs.
Please contact me at (301) 415-1496 if you have any questions.
Sincerely,
}Db'l: O $ Y "
Kahtan N. Jabbour, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366
Enclosure:
Safety Evaluation cc w/ encl: See next page a
Georgia Power Company Edwin I. Hatch Nuclear Plant cc:
Mr. Ernest L. Blake, Jr.
Mr. Thomas P. Mozingo 1
Shaw, Pittman, Potts and Trowbridge Program Manager 2300 N Street, NW.
Nuclear Operations Washington, DC 20037 Oglethorpe Power Corporation 2100 East Exchange Place Mr. D. M. Crowe P. O. Box 1349 Manager Licensing - Hatch Tucker, Georgia 30085-1349 Georgia Power Company P. O. Box 1295 Charles A. Patrizia, Esquire Birmingham, Alabama 35201 Paul, Hastings, Janofsky & Walker 10th Floor Mr. L. Sumner 1299 Pennsylvania Avenue General Manager, Nuclear Plant Washington, DC 20004-9500 Georgia Power Company P. O. Box 439 Chairman Baxley, Georgia 31513 Appling County Commissioners County Courthouse Resident Inspector Baxley, Georgia 31513
)
a U.S. Nuclear Regulatory Commission 11030 Hatch Parkway North Steven M. Jackson Baxley, Georgia 31513 Senior Engineer - Power Supply Municipal Electric Authority Regional Administrator, Region II of Georgia U.S. Nuclear Regulatory Commission 1470 Riveredge Parkway, NW 101 Marietta Street, NW. Suite 2900 Atlanta, Georgia 30328-4684 J
Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, SW.
Atlanta, Georgia 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334