Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134L537 + (08:49:08, 12 December 2024)
- ML20134L536 + (08:49:08, 12 December 2024)
- ML20134L534 + (08:49:09, 12 December 2024)
- ML20134L529 + (08:49:10, 12 December 2024)
- ML20134L528 + (08:49:10, 12 December 2024)
- ML20134L525 + (08:49:11, 12 December 2024)
- 05000287/LER-1985-001-04, :on 850723,reactor Tripped Due to High RCS Pressure.Caused by Erroneous Signal from Failed Integrated Control Sys Module.Module Replaced + (08:49:13, 12 December 2024)
- 05000382/LER-1996-001, :on 951107,TS 3.0.3 Entered Due to SIT Levels Reading High.Caused by Poor Work Practices.Cr Staff Immediately Lowered SIT Levels Until within Specified Range for Compliance W/Tss + (08:49:15, 12 December 2024)
- ML20134L515 + (08:49:17, 12 December 2024)
- ML20134L514 + (08:49:17, 12 December 2024)
- ML20134L511 + (08:49:19, 12 December 2024)
- 3F1196-01, Forwards Rev 23 to Crystal River Unit 3,FSAR Which Satisfies Requirements of 10CFR50.71(e)(4) & Includes Matl Which Describes Organization,Mods or Changes to CR-3 That Have Been Implemented as of End of Refuel 10 + (08:49:20, 12 December 2024)
- PY-CEI-NRR-2140, Monthly Operating Rept for Jan 1997 for Perry Unit 1 + (08:49:22, 12 December 2024)
- ML20134L505 + (08:49:23, 12 December 2024)
- PNO-III-85-076, on 850825,recirculation Pump B Problem Resulted in Brief Power Increase from 2.9 to 8.8%.Reactor Operators Tripped Pump After Failing to Reduce Pump Speed. Testing Disclosed No Problems W/Speed Control Circuitry + (08:49:23, 12 December 2024)
- DD-96-13, Informs That Time Provided by NRC Regulation for Commission to Act to Review Directors Decision DD-96-13 Has Expired. Decision Became Final Agency Action on 961101.W/Certificate of Svc.Served on 961115 + (08:49:24, 12 December 2024)
- ML20134L501 + (08:49:28, 12 December 2024)
- ML20134L496 + (08:49:29, 12 December 2024)
- ML20134L494 + (08:49:30, 12 December 2024)
- ML20134L492 + (08:49:31, 12 December 2024)
- ML20134L490 + (08:49:31, 12 December 2024)
- ML20134L489 + (08:49:32, 12 December 2024)
- 05000412/LER-1996-005-01, :on 961011,motor Control Ctr Auxiliary Control Relays Failed Due to Thermal Aging.Replaced 203 Active J12 Relays + (08:49:35, 12 December 2024)
- DD-96-15, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-96-15 Expired.Decision Final Agency Action on 961112.W/certificate of Service.Served on 961115 + (08:49:37, 12 December 2024)
- ML20134L482 + (08:49:37, 12 December 2024)
- ML20134L479 + (08:49:40, 12 December 2024)
- ML20134L477 + (08:49:41, 12 December 2024)
- ML20134L472 + (08:49:42, 12 December 2024)
- U-600209, Part 21 Rept (21-85-03) Re Failure of Actuator to Valve Stem Coupling During Testing of Hammel-Dahl 2500 Valve (GE PRC 89-14).Caused by Improper Test Startup.Evaluation Underway + (08:49:42, 12 December 2024)
- 05000237/LER-1985-031-03, :on 850727,east Bank Scram Discharge Vol hi-hi Water Level Scram Occurred.Caused by Steam Generated from Reactor Bldg Drain Header.Trip Setpoint of Instruments Lowered & Engineering Analysis Performed + (08:49:44, 12 December 2024)
- ML20134L470 + (08:49:45, 12 December 2024)
- ML20134L468 + (08:49:46, 12 December 2024)
- ML20134L466 + (08:49:47, 12 December 2024)
- 05000414/LER-1994-002, :on 940615,reactor Trip Breakers Opened Due to Component Failure.Failed Firing Cards Were Replaced, Remaining Firing Cards in Stock Tested & Procedures Revised + (08:49:48, 12 December 2024)
- ML20134L463 + (08:49:49, 12 December 2024)
- ML20134L462 + (08:49:50, 12 December 2024)
- ML20134L461 + (08:49:51, 12 December 2024)
- ML20134L460 + (08:49:51, 12 December 2024)
- ML20134L457 + (08:49:52, 12 December 2024)
- ML20134L458 + (08:49:52, 12 December 2024)
- ML20134L452 + (08:49:53, 12 December 2024)
- ML20134L449 + (08:49:54, 12 December 2024)
- ML20134L451 + (08:49:54, 12 December 2024)
- ML20134L448 + (08:49:55, 12 December 2024)
- ML20134L447 + (08:49:56, 12 December 2024)
- ML20134L446 + (08:49:56, 12 December 2024)
- ML20134L443 + (08:49:57, 12 December 2024)
- ML20134L442 + (08:49:58, 12 December 2024)
- ML20134L440 + (08:49:59, 12 December 2024)
- ML20134L439 + (08:50:00, 12 December 2024)
- ML20134L437 + (08:50:01, 12 December 2024)