Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Q877 + (03:22:20, 12 December 2024)
- ML20137Q874 + (03:22:20, 12 December 2024)
- ML20137Q873 + (03:22:21, 12 December 2024)
- ML20137Q870 + (03:22:22, 12 December 2024)
- ML20137Q869 + (03:22:22, 12 December 2024)
- ML20137Q864 + (03:22:23, 12 December 2024)
- ML20137Q863 + (03:22:24, 12 December 2024)
- PNO-I-86-009A, on 860204,plant Restarted Following Outage to Replace Turbine Extraction Steam Bellows Inside Main Condenser + (03:22:24, 12 December 2024)
- U-600435, Advises That Postulated High Energy Pipe Breaks Inside Drywell Reviewed for Jet Impingement Effects on Grating.Two Postulated Breaks Will Produce Direct Jet Forces Perpendicular to Grating.Grating Will Not Be Displaced + (03:22:25, 12 December 2024)
- ST-HL-AE-1595, Submits Addl Info Re Draft Ser/Fsar Items Re NUREG-0737, Item II.B.3 on post-accident Sampling Sys.Instrumentation Will Be Calibr Every 6 Months.Frequency May Be Revised Based on Evaluations of Industry Experience + (03:22:26, 12 December 2024)
- ML20137Q856 + (03:22:26, 12 December 2024)
- U-600434, Confirms That Corrective Action Completed for Observation Repts 1,10,29,34,55,57,64 & 74.Gaps Between Batteries & Battery rack-end Rails Eliminated by Installing Spacers Between End Cells & Battery rack-end Rails + (03:22:27, 12 December 2024)
- ML20137Q852 + (03:22:27, 12 December 2024)
- ML20137Q850 + (03:22:28, 12 December 2024)
- SNRC-1230, Requests Training Program Authorizing Substitution of 3 Months on-shift Experience at Levels Less than or Equal to 5% Thermal Power & 2 Wks Observation Training at Levels Greater than or Equal to 20% Thermal Power.Fee Paid + (03:22:29, 12 December 2024)
- ML20137Q843 + (03:22:29, 12 December 2024)
- ML20137Q842 + (03:22:30, 12 December 2024)
- ML20137Q841 + (03:22:31, 12 December 2024)
- ML20137Q839 + (03:22:31, 12 December 2024)
- ML20137Q836 + (03:22:32, 12 December 2024)
- ML20137Q834 + (03:22:33, 12 December 2024)
- ML20137Q835 + (03:22:33, 12 December 2024)
- ML20137Q830 + (03:22:34, 12 December 2024)
- ML20137Q832 + (03:22:34, 12 December 2024)
- PY-CEI-NRR-0432, Forwards Application to Amend CPPR-148,extending Const Completion Date.Fee Paid + (03:22:35, 12 December 2024)
- ML20137Q823 + (03:22:36, 12 December 2024)
- B11951, Requests Exemption from Requirements of 10CFR50.49 for 11 Valve Motor Operators,Per 10CFR50.12(a).Justification Based on Application of 10CFR50.22(a)(2)(iii).Fee Paid + (03:22:37, 12 December 2024)
- ML20137Q816 + (03:22:37, 12 December 2024)
- ML20137Q815 + (03:22:38, 12 December 2024)
- ML20137Q813 + (03:22:39, 12 December 2024)
- U-600421, Provides Update on Const Schedule,Per 810529 Request.New Organization Formed to Coordinate Fuel Load Readiness. Integrated Leak Rate Test Successfully Completed.Eccs/Loss of Offsite Power Testing Incomplete + (03:22:39, 12 December 2024)
- ML20137Q809 + (03:22:40, 12 December 2024)
- ML20137Q805 + (03:22:41, 12 December 2024)
- ML20137Q804 + (03:22:41, 12 December 2024)
- ML20137Q803 + (03:22:42, 12 December 2024)
- 05000361/LER-1985-054, :on 851025,determined That 60-month Surveillance Requirement 4.8.4.1.b Exceeded on Containment Penetration Conductor Overcurrent Protective Devices 2BF08 & 2BF09.Devices Last Surveyed on 780706 & 0512 + (03:22:43, 12 December 2024)
- ML20137Q797 + (03:22:45, 12 December 2024)
- ML20137Q796 + (03:22:45, 12 December 2024)
- ML20137Q793 + (03:22:46, 12 December 2024)
- ML20137Q791 + (03:22:46, 12 December 2024)
- ML20137Q790 + (03:22:47, 12 December 2024)
- ML20137Q784 + (03:22:48, 12 December 2024)
- B11953, Forwards Revised Responses to Sqrt Audit Questions,Per 851101 Meeting W/Nrc & S&W & Bj Youngblood Re Sser 4 (NUREG-1031) + (03:22:49, 12 December 2024)
- ML20137Q783 + (03:22:49, 12 December 2024)
- ML20137Q779 + (03:22:50, 12 December 2024)
- ML20137Q778 + (03:22:50, 12 December 2024)
- ML20137Q777 + (03:22:51, 12 December 2024)
- IR 05000412/1985021 + (03:22:53, 12 December 2024)
- ML20137Q774 + (03:22:53, 12 December 2024)
- U-600430, Forwards List of Seismic & Dynamic Qualification of Equipment,In Response to SER Outstanding Issue 7ii Identified by Sqrt During 850827-30 Visit + (03:22:56, 12 December 2024)
- ML20137Q771 + (03:22:56, 12 December 2024)