Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13330B102 + (06:22:46, 11 January 2025)
- ML13330B100 + (06:22:48, 11 January 2025)
- ML13330B092 + (06:22:50, 11 January 2025)
- ML13330B088 + (06:22:55, 11 January 2025)
- ML13330B083 + (06:22:57, 11 January 2025)
- ML13330B081 + (06:23:00, 11 January 2025)
- ML13330B079 + (06:23:02, 11 January 2025)
- ML13330B072 + (06:23:05, 11 January 2025)
- ML13330B026 + (06:23:08, 11 January 2025)
- ML13330B006 + (06:23:10, 11 January 2025)
- NLS2013099, Response to Nuclear Regulatory Commissions Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns + (06:23:12, 11 January 2025)
- RBG-47409, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis for Seismic Requirements + (06:23:20, 11 January 2025)
- L-13-374, Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (06:23:23, 11 January 2025)
- HNP-13-122, Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Inservice Inspection Program- Third Ten-Year Interval Supporting Calculations + (06:23:28, 11 January 2025)
- IR 05000424/2013009 + (06:23:42, 11 January 2025)
- ML13330A953 + (06:23:44, 11 January 2025)
- ML13330A932 + (06:23:46, 11 January 2025)
- ML13330A931 + (06:23:48, 11 January 2025)
- ML13330A930 + (06:23:51, 11 January 2025)
- ML13330A929 + (06:23:54, 11 January 2025)
- ML13330A928 + (06:23:56, 11 January 2025)
- ML13330A927 + (06:23:58, 11 January 2025)
- ML13330A925 + (06:24:01, 11 January 2025)
- ML13330A924 + (06:24:03, 11 January 2025)
- ML13330A922 + (06:24:04, 11 January 2025)
- ML13330A917 + (06:24:08, 11 January 2025)
- ML13330A915 + (06:24:10, 11 January 2025)
- ML13330A914 + (06:24:14, 11 January 2025)
- ML13330A912 + (06:24:16, 11 January 2025)
- ML13330A911 + (06:24:19, 11 January 2025)
- ML13330A910 + (06:24:21, 11 January 2025)
- ML13330A908 + (06:24:23, 11 January 2025)
- ML13330A907 + (06:24:29, 11 January 2025)
- ML13330A906 + (06:24:32, 11 January 2025)
- ML13330A903 + (06:24:34, 11 January 2025)
- ML13330A900 + (06:24:35, 11 January 2025)
- ML13330A899 + (06:24:37, 11 January 2025)
- ML13330A897 + (06:24:39, 11 January 2025)
- ML13330A896 + (06:24:41, 11 January 2025)
- ML13330A893 + (06:24:42, 11 January 2025)
- ML13330A892 + (06:24:44, 11 January 2025)
- PNO-V-80-024, on 790409,plant Was Shut Down Because of Steam Generator C Tube Leakage of Approx 210 Gallons Per Day. Scheduled Refueling Outage Will Continue Through 800531 + (06:24:48, 11 January 2025)
- ML13330A890 + (06:24:50, 11 January 2025)
- ML13330A889 + (06:24:51, 11 January 2025)
- ML13330A888 + (06:24:53, 11 January 2025)
- 05000206/LER-1980-011-43, /43Z-0:on 800310,while Purging Pressurizer Relief Tank to Remove Oxygen Tank,Disc Ruptured.Caused by Overfilliing W/Primary Makeup Water.Ruptured Disc Replaced + (06:24:56, 11 January 2025)
- 05000206/LER-1980-011, Forwards LER 80-011/43Z-0 + (06:25:01, 11 January 2025)
- 05000206/LER-1980-010-03, /03L-0:on 800318,during Full Power Operation,High Temp Indication Observed on South Charging Pump Thrust Bearing.Caused by Loose Coupling Hub on Pump Shaft.Damaged Inboard Bearing Shoes & Coupling Hubs Replaced + (06:25:05, 11 January 2025)
- 05000206/LER-1980-010, Forwards LER 80-010/03L-0 + (06:25:09, 11 January 2025)
- 05000206/LER-1980-008-03, /03L-0:on 800318,during Maint of Saltwater Cooling Pump,Pipe Support 9-416-4 & Concrete Anchors Found Corroded.Caused by Vibration & Corrosion Induced by Saltwater Environ.Support Redesigned & Built + (06:25:14, 11 January 2025)
- 05000206/LER-1980-008, Forwards LER 80-008/03L-0 + (06:25:17, 11 January 2025)