Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14175A617 + (01:09:59, 11 January 2025)
- ML14175A615 + (01:10:00, 11 January 2025)
- ML14175A614 + (01:10:01, 11 January 2025)
- ML14175A613 + (01:10:02, 11 January 2025)
- ML14175A611 + (01:10:03, 11 January 2025)
- ML14175A610 + (01:10:05, 11 January 2025)
- ML14175A609 + (01:10:06, 11 January 2025)
- ML14175A607 + (01:10:08, 11 January 2025)
- ML14175A605 + (01:10:09, 11 January 2025)
- ML14175A604 + (01:10:10, 11 January 2025)
- ML14175A602 + (01:10:11, 11 January 2025)
- ML14175A601 + (01:10:12, 11 January 2025)
- ML14175A599 + (01:10:14, 11 January 2025)
- ML14175A598 + (01:10:15, 11 January 2025)
- ML14175A596 + (01:10:17, 11 January 2025)
- ML14175A594 + (01:10:18, 11 January 2025)
- ML14175A593 + (01:10:19, 11 January 2025)
- ML14175A591 + (01:10:20, 11 January 2025)
- ML14175A590 + (01:10:22, 11 January 2025)
- ML14175A588 + (01:10:23, 11 January 2025)
- ML14175A585 + (01:10:24, 11 January 2025)
- ML14175A583 + (01:10:25, 11 January 2025)
- ML14175A576 + (01:10:26, 11 January 2025)
- ML14175A568 + (01:10:27, 11 January 2025)
- ML14175A556 + (01:10:27, 11 January 2025)
- CNL-14-102, Resolution of Generic Safety Issue (GSI)-191 - Commitment Change + (01:10:28, 11 January 2025)
- ML14175A536 + (01:10:29, 11 January 2025)
- IR 05000336/2014403 + (01:10:30, 11 January 2025)
- BYRON 2014-0078, Day Inservice Inspection Report for Interval 3, Period 3, (B1R19) + (01:10:31, 11 January 2025)
- Press Release-I-14-028, New NRC Senior Resident Inspector Assigned to Beaver Valley Nuclear Plant + (01:10:31, 11 January 2025)
- ML14175A398 + (01:10:32, 11 January 2025)
- ML14175A390 + (01:10:33, 11 January 2025)
- Press Release-III-14-023, NRC Schedules Public Meeting June 26 to Discuss Performance of Palisades Nuclear Power Station + (01:10:34, 11 January 2025)
- IR 05000237/2014404 + (01:10:35, 11 January 2025)
- IR 05000277/2014403 + (01:10:35, 11 January 2025)
- CNL-14-065, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits (BFN TS-491) + (01:10:37, 11 January 2025)
- ML14175A299 + (01:10:38, 11 January 2025)
- ML14175A284 + (01:10:39, 11 January 2025)
- ML14175A250 + (01:10:40, 11 January 2025)
- NRC-2014-0139, Comment (1) of the Alliance for a Clean Environment on Draft Emergency Preparedness + (01:10:40, 11 January 2025)
- ML14175A190 + (01:10:41, 11 January 2025)
- L-2014-129, License Amendment Request Administrative Controls - Responsibility and Organization - Shift Technical Advisor + (01:10:42, 11 January 2025)
- 05000482/LER-2014-003, Regarding Failure of Safety Injection Accumulator Vent Line Due to Low Stress - High Cycle Fatigue Results in Degraded Reactor Coolant Boundary + (01:10:44, 11 January 2025)
- ET 14-0017, Withdrawal of License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis + (01:10:45, 11 January 2025)
- 05000353/LER-2014-005, Regarding High Pressure Coolant Injection System Inoperability Due to ECCS Actuation Instrument Channel Setpoint Drift + (01:10:47, 11 January 2025)
- ML14174B414 + (01:10:48, 11 January 2025)
- ML14174B412 + (01:10:49, 11 January 2025)
- ML14174B409 + (01:10:49, 11 January 2025)
- ML14174B394 + (01:10:50, 11 January 2025)
- ML14174B392 + (01:10:51, 11 January 2025)
- LR-N14-0160, Re-Submittal of No Signifcant Hazards Consideration for License Amendment Request for Approval of the Revised PSEG Nuclear Cyber Security Plan Milestone 8 Implementation Schedule + (01:10:54, 11 January 2025)