Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138N208 + (23:38:33, 11 December 2024)
- B11832, Forwards Response to Informal NRC Question Raised During 850925 Telcon Re Steam Generator Tube Rupture Issue Related to three-loop Operation + (23:38:34, 11 December 2024)
- ML20138N203 + (23:38:35, 11 December 2024)
- ML20138N202 + (23:38:35, 11 December 2024)
- ST-HL-AE-1445, Forwards Response to Draft SER Open Items D 5.2-7,D 5.2-10 & D 5.2-11 Re Cold Overpressure Protection + (23:38:36, 11 December 2024)
- IR 05000498/1996006 + (23:38:37, 11 December 2024)
- ML20138N196 + (23:38:38, 11 December 2024)
- U-600285, Responds to NRC Re Noncompliance Noted in Insp Rept 50-461/85-42.Corrective Actions:Sargent & Lundy Issued Rev 5 to Procedure PI-CP-034 to Address Electrical Project Engineering Div Assignment & Analysis Description + (23:38:39, 11 December 2024)
- ML20138N195 + (23:38:39, 11 December 2024)
- ML20138N193 + (23:38:40, 11 December 2024)
- ML20138N190 + (23:38:41, 11 December 2024)
- RBG-22495, Forwards Fisher Controls Intl,Inc Establishing Design Similarity to Representative Valve/Operator Prototype,Per Equipment Qualification Branch Request + (23:38:41, 11 December 2024)
- ML20138N189 + (23:38:42, 11 December 2024)
- ML20138N188 + (23:38:43, 11 December 2024)
- ML20138N183 + (23:38:43, 11 December 2024)
- ML20138N182 + (23:38:44, 11 December 2024)
- ML20138N176 + (23:38:45, 11 December 2024)
- ML20138N179 + (23:38:45, 11 December 2024)
- ML20138N172 + (23:38:46, 11 December 2024)
- ML20138N167 + (23:38:47, 11 December 2024)
- ML20138N166 + (23:38:48, 11 December 2024)
- ST-HL-AE-1500, Forwards Response to Draft SER or FSAR Items Re Loose Parts Monitoring sys.Marked-up FSAR Pages Will Be Included in Future Amend + (23:38:48, 11 December 2024)
- ML20138N163 + (23:38:49, 11 December 2024)
- ML20138N160 + (23:38:50, 11 December 2024)
- ML20138N161 + (23:38:50, 11 December 2024)
- ML20138N153 + (23:38:51, 11 December 2024)
- ML20138N148 + (23:38:52, 11 December 2024)
- ML20138N150 + (23:38:52, 11 December 2024)
- B11831, Forwards Proprietary & Nonproprietary Supplemental Info Re, Justification for Use of W-3 Correlation For...Steamline Break Analysis, in Response to 850925 Telcon.Proprietary Version Withheld (Ref 10CFR2.790) + (23:38:53, 11 December 2024)
- IR 05000395/1985037 + (23:38:53, 11 December 2024)
- ML20138N141 + (23:38:55, 11 December 2024)
- ST-HL-AE-1466, Forwards Response to Draft SER & FSAR Items Re Chapter 7A, Item II.D.1 Concerning Relief & Safety Valves.Encl marked-up FSAR Pages Will Be Incorporated Into Future Amend Unless Otherwise Noted + (23:38:55, 11 December 2024)
- ML20138N140 + (23:38:56, 11 December 2024)
- ML20138N138 + (23:38:56, 11 December 2024)
- ML20138N136 + (23:38:57, 11 December 2024)
- ML20138N134 + (23:38:58, 11 December 2024)
- ML20138N131 + (23:38:58, 11 December 2024)
- ML20138N129 + (23:38:59, 11 December 2024)
- ML20138N128 + (23:38:59, 11 December 2024)
- ML20138N126 + (23:39:00, 11 December 2024)
- PNO-IV-85-055, on 851031,initial Criticality Achieved. Criticality Occurred at Predicted Point in Rod Withdrawal Sequence + (23:39:01, 11 December 2024)
- ML20138N123 + (23:39:01, 11 December 2024)
- TXX-4609, Forwards Revised Objectives & Guidelines for 1985 Emergency Preparedness Exercise + (23:39:02, 11 December 2024)
- ML20138N119 + (23:39:03, 11 December 2024)
- ML20138N116 + (23:39:04, 11 December 2024)
- ST-HL-AE-1507, Forwards Current Resumes for Key Plant Personnel,Including Health & Safety Svcs Manager & Radiological Protection Supervisor,Per s + (23:39:04, 11 December 2024)
- B11696, Forwards Review of Integrated Safety Assessment Program Topic 1.10, Emergency Response Facilities Instrumentation, Per 850517 Commitment + (23:39:05, 11 December 2024)
- ML20138N109 + (23:39:06, 11 December 2024)
- ST-HL-AE-1497, Forwards Response to Draft Ser/Fsar Item D 0.5-6 Re Tank Rupture & Groundwater release.Marked-up FSAR Pages Will Be Included in Amend + (23:39:06, 11 December 2024)
- ML20138N106 + (23:39:07, 11 December 2024)
- ML20138N105 + (23:39:07, 11 December 2024)