Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148B676 + (17:19:52, 11 December 2024)
- ML20148B675 + (17:19:52, 11 December 2024)
- ML20148B674 + (17:19:53, 11 December 2024)
- ML20148B672 + (17:19:54, 11 December 2024)
- ML20148B673 + (17:19:54, 11 December 2024)
- ML20148B671 + (17:19:55, 11 December 2024)
- ML20148B668 + (17:19:55, 11 December 2024)
- ML20148B666 + (17:19:57, 11 December 2024)
- ML20148B667 + (17:19:57, 11 December 2024)
- ML20148B664 + (17:19:58, 11 December 2024)
- ML20148B665 + (17:19:58, 11 December 2024)
- ML20148B663 + (17:19:59, 11 December 2024)
- ML20148B662 + (17:20:00, 11 December 2024)
- IR 05000338/1997002 + (17:20:02, 11 December 2024)
- ML20148B659 + (17:20:03, 11 December 2024)
- ML20148B657 + (17:20:03, 11 December 2024)
- ML20148B656 + (17:20:04, 11 December 2024)
- ML20148B654 + (17:20:05, 11 December 2024)
- ML20148B655 + (17:20:05, 11 December 2024)
- BECO-88-047, Forwards Responses to NRC Concerns Re Rev 1A of Inservice Testing (IST) Program for Pumps & Valves for Plant.Util Plan for Upgrading Current IST Program Establishes More Viable Pump & Valve Testing Program W/O Major Impact on NRC Review + (17:20:06, 11 December 2024)
- ML20148B650 + (17:20:07, 11 December 2024)
- ML20148B649 + (17:20:08, 11 December 2024)
- ML20148B647 + (17:20:08, 11 December 2024)
- ML20148B646 + (17:20:09, 11 December 2024)
- ML20148B645 + (17:20:09, 11 December 2024)
- ML20148B643 + (17:20:10, 11 December 2024)
- ML20148B641 + (17:20:11, 11 December 2024)
- ML20148B642 + (17:20:11, 11 December 2024)
- ML20148B640 + (17:20:12, 11 December 2024)
- ML20148B632 + (17:20:13, 11 December 2024)
- ML20148B633 + (17:20:13, 11 December 2024)
- ML20148B631 + (17:20:14, 11 December 2024)
- 05000338/LER-1988-004-01, :on 880113,discovered Resin Intrusion Into Secondary Side Water Sys.Caused by Equipment Problems in Condensate Polishing Sys.Condensate Polishing Sys Removed from Operation & Cleanup Procedure Performed + (17:20:16, 11 December 2024)
- ML20148B628 + (17:20:17, 11 December 2024)
- NRC-97-0056, Special Rept:On 970319,disconnect Switch for MCC 72E-5A, Position 3CR Opened Unexpectedly & Would Not Reclose When Rotary Actuator Placed in on Position.Caused by Inadequate Preventive Maint.Cleaned & Relubricated Disconnect Switches + (17:20:17, 11 December 2024)
- ML20148B624 + (17:20:18, 11 December 2024)
- ML20148B618 + (17:20:19, 11 December 2024)
- ML20148B615 + (17:20:20, 11 December 2024)
- ML20148B613 + (17:20:20, 11 December 2024)
- 05000352/LER-1988-002, :on 880130,isolation of Reactor Encl Secondary Containment Occurred.Caused by Exhaust Fan a & B Blade Pitch Settings Requiring Adjustment.Instrument Air Tubing to Exhaust Fan B Damper Replaced + (17:20:23, 11 December 2024)
- ML20148B607 + (17:20:24, 11 December 2024)
- ML20148B605 + (17:20:25, 11 December 2024)
- ML20148B604 + (17:20:25, 11 December 2024)
- IR 05000293/1988003 + (17:20:27, 11 December 2024)
- 05000321/LER-1979-102-03, /03L-0:on 791226,during Shutdown & While Performing Normal Surveillance,Hpci Steam Line Differential Pressure Switch Found at 241 Inches of Water.Caused by Instrument Drift.Instrument Recalibr + (17:20:29, 11 December 2024)
- ML20148B599 + (17:20:31, 11 December 2024)
- ML20148B598 + (17:20:31, 11 December 2024)
- ML20148B594 + (17:20:32, 11 December 2024)
- 05000321/LER-1979-102, Forwards LER 79-102/03L-0 + (17:20:33, 11 December 2024)
- ML20148B590 + (17:20:33, 11 December 2024)
- ML20148B589 + (17:20:34, 11 December 2024)
- ML20148B586 + (17:20:34, 11 December 2024)