Summarizes 880219 Meeting W/Util in Region I Re Organization
ML20148B664
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/15/1988
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8803220079
Download: ML20148B664 (2)


Text

-

f, Docket Nos.

50-277 50-278 Philadelphia Electric Company ATTNi Mr. Corbin A. McNeill Executive Director 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

S ub.i e :' - Weting Summary A meeting was held in the NRC Region I office'o. February 19, 1988 concerning the Philadelphia Electric Company. The meeting was attended by:

C. McNeill Senior Vice President - Nuclear, PSE&G W. Russell Regional Administrator, Region I S. Vargs Associate Director for Projects, NRR W. Kane Director, Division of Reactor Projects Mr. McNeill announced that effective February 29, 1988 he would assume respon-sibility for the nuclear activities of Philadelphia Electric Company (PECo) and would have the title of Execut.ive Director - Nuclear,- and report to J. L.

Everett, Chief Executive Officer. As such he would effectively replace J.

Kemper, Senior Vice President - Nuclear.

J. Kemper will report to C. McNeill and will be responsible for _ construction completion at Limerick 2.

D. Smith, Vice President, Peach Bottom; G. Leitch, Vice President, Limerick; J. Kowalski, Vice President, Nuclear Engineering; D. Helwig, General Manager Quality Assurance; and J. Gallagher, Vice President, Nuclear Services will also report to him.

No other organizational changes were identified or discussed.

Mr. McNeill noted that he had visited the Peach Bottom site for about a week, earlier in the year. He expressed concern with the large number of people on site and expects to review that situation as a high priority.

The NRC staff noted that the INP0 letter of January 11, 1988 raised concerns L

l with the extent to which external parties had the opportunity to provide a j

viable input to the PECo submittals. We advised Mr. McNeill that we were l

preparing a letter requesting PEco to address this issue. He acknowledged that and noted that it would likely be mid April before he would be able to conduct his assessment and respond.

l Sincerely, i-Sp*N l

W. F. Kane, Director Division of Reactor Projects j

l f

0FFICIAL RECORD COPY MEETING

SUMMARY

/PECO - 0001.0.0 03/15/88 8803220079 880315 i

PDR ADOCK 05000277

{

H DCD L

/

J Philadelphia Electric Company 2

15 MAR 1988 CC:-

-J W. Gallagher, Vice President, Nuclear Services

.E. C. Kistner, Chairman, Nuclear Review Board Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station Jack Urban, General Manager,. Fuels Department, Delmarva Power & Light Co.

John F. Franz,' Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr., Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Director, Licensing Section Doris Poulsen, Secretary of Harford County Council Public Document Room (PDR)

Loc'al Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspec'.or Commonwealth of Pennsylvania bCCl Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP Robert J. Bores, DRSS i

RI R bP B:k k:RA I:D I

?

11 i

$de lla R0 11 Linville/rh1 nger l

3/h/88 3/ /88 3$/88 3//[/88 3/ /88 3

88 0FFICIAL RECORD COPY MEETING

SUMMARY

/PEC0 - 0002.0.0 03/09/88 i

.