Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-0825, Forwards Fifth Quarterly Rept Cleveland Electric Illuminating Seismic Monitoring Network 871016-1231. Rept Will Continue to Be Submitted on Quarterly Basis + (17:05:09, 11 December 2024)
- ML20148D020 + (17:05:10, 11 December 2024)
- ML20148D022 + (17:05:10, 11 December 2024)
- ML20148D018 + (17:05:12, 11 December 2024)
- ML20148D017 + (17:05:13, 11 December 2024)
- ML20148D013 + (17:05:14, 11 December 2024)
- ML20148D016 + (17:05:14, 11 December 2024)
- ML20148D008 + (17:05:15, 11 December 2024)
- ML20148D007 + (17:05:16, 11 December 2024)
- ML20148D005 + (17:05:16, 11 December 2024)
- ST-HL-AE-5655, Responds to RAI by Providing Revised Graded QA Operations QA Plan + (17:05:18, 11 December 2024)
- ML20148D000 + (17:05:18, 11 December 2024)
- ML20148C997 + (17:05:19, 11 December 2024)
- ML20148C994 + (17:05:20, 11 December 2024)
- ML20148C992 + (17:05:20, 11 December 2024)
- ML20148C990 + (17:05:21, 11 December 2024)
- ML20148C989 + (17:05:22, 11 December 2024)
- ML20148C985 + (17:05:23, 11 December 2024)
- ML20148C982 + (17:05:24, 11 December 2024)
- ML20148C979 + (17:05:25, 11 December 2024)
- B16471, Proposed Tech Specs Modifying Definition 1.8 Re Containment Integrity + (17:05:26, 11 December 2024)
- ML20148C975 + (17:05:26, 11 December 2024)
- ML20148C973 + (17:05:27, 11 December 2024)
- ML20148C965 + (17:05:28, 11 December 2024)
- ML20148C970 + (17:05:28, 11 December 2024)
- ML20148C964 + (17:05:29, 11 December 2024)
- ML20148C962 + (17:05:30, 11 December 2024)
- ML20148C959 + (17:05:30, 11 December 2024)
- ML20148C953 + (17:05:32, 11 December 2024)
- ML20148C949 + (17:05:32, 11 December 2024)
- ML20148C948 + (17:05:33, 11 December 2024)
- ML20148C946 + (17:05:33, 11 December 2024)
- ML20148C940 + (17:05:34, 11 December 2024)
- ST-HL-AE-5658, Forwards Updated Procedures for Plant Graded QA Program. Procedures Previously Provided in Original Submittal of QA Operations QA Plan in + (17:05:35, 11 December 2024)
- 05000302/LER-1997-010, :on 970327,HVAC Was Not Considered for Manual Operation of safe-shutdown Equipment in post-fire Conditions.Caused by Failure to Consider Loss of Ventilation in Preparing Fire study.CR-3 in Cold Shutdown + (17:05:37, 11 December 2024)
- ML20148C927 + (17:05:38, 11 December 2024)
- ML20148C924 + (17:05:43, 11 December 2024)
- ML20148C925 + (17:05:43, 11 December 2024)
- ML20148C921 + (17:05:46, 11 December 2024)
- ML20148C916 + (17:05:47, 11 December 2024)
- ML20148C914 + (17:05:48, 11 December 2024)
- ML20148C913 + (17:05:48, 11 December 2024)
- ML20148C911 + (17:05:49, 11 December 2024)
- 05000293/LER-1987-019, :on 871217,RWCU Sys Operation Interrupted Due to Actuation of RWCU Sys Portion of Primary Containment Isolation Control Sys.Caused by Personnel Error.Fuse Replaced & Isolation Reset + (17:05:51, 11 December 2024)
- 05000269/LER-1997-004-01, :on 970417,determined More than One HPI Pump Could Be Started During LTOP Event.Util Evaluation of Event Continuing & Rept Will Be Supplemented to Address Root Cause & Other LER Content Requirements + (17:05:53, 11 December 2024)
- ML20148C907 + (17:05:54, 11 December 2024)
- ML20148C906 + (17:05:59, 11 December 2024)
- ML20148C903 + (17:06:00, 11 December 2024)
- ML20148C898 + (17:06:00, 11 December 2024)
- 05000366/LER-1987-016-02, :on 871231,surveillance Not Performed within Time Limit.Caused by Personnel Error.Surveillance Performed, Verified & Schedule Modified.Personnel Counseled. W/88018 Ltr + (17:06:03, 11 December 2024)
- ML20148C889 + (17:06:05, 11 December 2024)
- ML20148C888 + (17:06:05, 11 December 2024)