Forwards Response to 10CFR50,App R Alternative Shutdown Capability 4,160 Volt Switchgear Room, Per 871110 Request
ML20148C964
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/29/1988
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Wagner D
Office of Nuclear Reactor Regulation
Shared Package
ML20148C971 List:
References
CON-NRC-88-017, CON-NRC-88-17 GL-86-10, TAC-60839, TAC-60840, VPNPD-88-117, NUDOCS 8803230230
Download: ML20148C964 (1)


Text

,

_ d' O

Wisconsin Electnc eaaen ccuenr b

231 W. WCHIGAN.P O BOX 204 WLW AUKEE.Wi S3201 (414)221 2345 VPNFD-88-ll7 NRC-88-017 February 29, 1988 l

U.S.

NUCLEAR REGULATORY COMMISSION

~

Document Control Desk Washington, D.C.

20555

~

Attention:

Mr. David H. Wagner, Project Manager Project Directorate III-3 Gentlemen:

DOCKETS NO. 50-266 AND 50-301 FIRE PROTECTION REQUIREMENT - 4160 VOLT SWITCHGEAR ROOM (TAC NOS. 60839 and 60840)

POINT BEACH NUCLEAR PLANT U? LITS 1& 2 Your letter dated November 10, 1987, requested that we provide

=

j l

additional information regarding our proposed modifications to l

provide capability to bypass the 4160 volt vital switchgear room for remote shutdown system.

Specifically, you requested that we describe how the proposed dedicated shutdown capability for the 4160 volt switchgear room meets each requirement of 10 CFR 50, Appendix R, Section III.L.

We have provided this information in l

the attached report.

As suggested, NRC stuff guidance on alternate / dedicated shutdown capability, as discussed in your Generic Letter 86-10, has also been considered in our evaluation.

Please contact us if you have any questions concerning our report.

Very truly yours, bl$O C.

W.

Fay fggh l

Vice President Nuclear Power 7

(

Attachment

/

Copies to NRC Regional Administrator, Region III i

l NRC Resident Inspector 1