Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151L788 + (10:57:37, 11 December 2024)
- ML20151L785 + (10:57:38, 11 December 2024)
- ML20151L780 + (10:57:42, 11 December 2024)
- ML20151L779 + (10:57:43, 11 December 2024)
- ML20151L778 + (10:57:43, 11 December 2024)
- ML20151L777 + (10:57:44, 11 December 2024)
- ML20151L775 + (10:57:48, 11 December 2024)
- TXX-4619, Responds to NRC Re Violations Noted in Insp Rept 50-445/85-11.Corrective Actions:Inspector Instructed to Document Deviations in Accordance w/CP-QP-16.0 in Prompt Manner + (10:57:49, 11 December 2024)
- ML20151L773 + (10:57:51, 11 December 2024)
- RBG-27691, Special Rept:On 880324,temp in North End of Main Steam Tunnel Rose Above Tech Spec 3/4.7.8 Limit of 122 F for More than 8 H.Caused by Combination of Full Power Operation & High Outside Temps.Request to Change Tech Specs Submitted + (10:57:52, 11 December 2024)
- ML20151L768 + (10:57:52, 11 December 2024)
- ML20151L765 + (10:57:53, 11 December 2024)
- ML20151L762 + (10:57:54, 11 December 2024)
- ML20151L760 + (10:57:54, 11 December 2024)
- ML20151L755 + (10:57:56, 11 December 2024)
- ML20151L754 + (10:57:56, 11 December 2024)
- 05000304/LER-1986-024-01, :on 861230,pressurizer Low Pressure Transient Occurred Due to Pressure Controller Shifting to Manual Instead of Automatic.Cause Undetermined.Nuclear Station Operator Reprimanded for Inattentiveness + (10:57:58, 11 December 2024)
- ML20151L751 + (10:57:59, 11 December 2024)
- 3F0897-22, Application for Amend to License DPR-72,TS Change Request Notice 215,extending Frequency of EDG Surveillances During Period of Time CR-3 EDGs Are Being Modified + (10:58:00, 11 December 2024)
- ML20151L748 + (10:58:00, 11 December 2024)
- 05000458/LER-1985-045, :on 851126,Div III ECCS Initiation & Injection Occurred.Caused by Improperly Valving Transmitter Into Svc During Surveillance Test Procedure.Pump Secured & Valve Closed.Procedure Clarified.Staff Counseled + (10:58:02, 11 December 2024)
- ML20151L745 + (10:58:05, 11 December 2024)
- ML20151L744 + (10:58:06, 11 December 2024)
- ML20151L741 + (10:58:07, 11 December 2024)
- ML20151L743 + (10:58:07, 11 December 2024)
- ML20151L740 + (10:58:08, 11 December 2024)
- RBG-22711, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-59.Corrective Actions:Engineering Evaluation Performed on Control Bldg Heat Load Calculations.Fsar Change Request Initiated to Revise Tables 9.2-1 & 9.2-15 + (10:58:09, 11 December 2024)
- ML20151L737 + (10:58:10, 11 December 2024)
- IR 05000293/1988024 + (10:58:12, 11 December 2024)
- ML20151L735 + (10:58:12, 11 December 2024)
- ML20151L734 + (10:58:13, 11 December 2024)
- 3F0897-27, Informs That CR-3 PSA Model Does Not Contain Proprietary Info & May Be Released to Public + (10:58:14, 11 December 2024)
- ML20151L730 + (10:58:14, 11 December 2024)
- W3P85-3184, NPDES Discharge Monitoring Rept for Nov 1985 + (10:58:15, 11 December 2024)
- ML20151L728 + (10:58:15, 11 December 2024)
- ML20151L726 + (10:58:16, 11 December 2024)
- 05000368/LER-1988-012, :on 880430,setpoint Discrepancies Discovered During in Situ Testing of Pressurizer Code Safety Valves. Cause Re Differences in Stated Test Methods.Adjustments Made to Valves 2PSV-4633 & 2PSV-4634 + (10:58:17, 11 December 2024)
- ML20151L721 + (10:58:18, 11 December 2024)
- ML20151L718 + (10:58:19, 11 December 2024)
- 3F0897-24, Provides Suppl Info for NRC to Consider When Evaluating OL Amend Request to Remove Portion of License Condition 2.C.(5) Which Deals W/Measurement of Decay Heat Dropline Flow + (10:58:20, 11 December 2024)
- AECM-88-0145, Requests That Enforcement Discretion Be Exercised on Tech Specs Section 6.5.1.2 & Listed Figures Re Consolidation of Engineering Expertise Into One Dept Recommendations of 1987 Evaluation + (10:58:20, 11 December 2024)
- ML20151L710 + (10:58:21, 11 December 2024)
- ML20151L709 + (10:58:21, 11 December 2024)
- 05000458/LER-1985-043, :on 851121,reactor Water Cleanup HX Room Temp Switch Trip Setpoint Found Outside Tech Spec Limit.Caused by Error in Approved Surveillance Procedure.Procedure Revised + (10:58:23, 11 December 2024)
- ML20151L707 + (10:58:24, 11 December 2024)
- ML20151L706 + (10:58:25, 11 December 2024)
- ML20151L703 + (10:58:25, 11 December 2024)
- ML20151L701 + (10:58:26, 11 December 2024)
- IR 05000298/1985028 + (10:58:28, 11 December 2024)
- ML20151L699 + (10:58:28, 11 December 2024)
- ML20151L698 + (10:58:29, 11 December 2024)