Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155G617 + (02:16:21, 11 December 2024)
- U-600525, Forwards Revised Post-Accident Sampling Sys Evaluation Rept, to Close Out Requirements of SER License Condition 6, Post-Accident Sampling & TMI Item II.B.3 + (02:16:22, 11 December 2024)
- ML20155G615 + (02:16:22, 11 December 2024)
- ML20155G614 + (02:16:23, 11 December 2024)
- ML20155G610 + (02:16:24, 11 December 2024)
- JPN-88-030, Forwards Addl Info Re Plant Alternate Rod Insertion & Recirculation Pump Trip Designs,Per ATWS Rule W/21 Oversize Drawings + (02:16:25, 11 December 2024)
- ML20155G607 + (02:16:26, 11 December 2024)
- JPN-98-046, Submits Response to NRC 981029 RAI Re ISI Program Relief Request 10 + (02:16:27, 11 December 2024)
- ML20155G602 + (02:16:27, 11 December 2024)
- ML20155G600 + (02:16:28, 11 December 2024)
- ML20155G598 + (02:16:29, 11 December 2024)
- ML20155G596 + (02:16:30, 11 December 2024)
- ML20155G593 + (02:16:30, 11 December 2024)
- NG-86-1506, Provides Addl Info Re Last Two Masonry Walls to Meet Requirements of IE Bulletin 80-11.New Seismic Analyses for Reactor & Turbine Bldgs Completed,Incorporating Radiation Damping.Input Accelerations Reduced + (02:16:31, 11 December 2024)
- B12022, Forwards Results of Equipment Qualification Reverification Walkdown Program,Per IE Info Notices 86-002 & 86-003. Discrepancies Will Be Corrected Prior to Startup from Current Outage + (02:16:32, 11 December 2024)
- ML20155G591 + (02:16:32, 11 December 2024)
- ML20155G588 + (02:16:33, 11 December 2024)
- ML20155G586 + (02:16:33, 11 December 2024)
- ML20155G584 + (02:16:34, 11 December 2024)
- B13031, Forwards Millstone Unit 2 Small Break LOCA Analysis, to Support Cycle 10 Startup Currently Scheduled for Mar 1989 + (02:16:35, 11 December 2024)
- ML20155G582 + (02:16:35, 11 December 2024)
- ST-HL-AE-2802, Advises That Four Areas That Required Wall Thickness Verification,Per Insp Repts 50-498/88-38 & 50-499/88-38,have Been Ultrasonically Examined & Found Acceptable + (02:16:36, 11 December 2024)
- ML20155G580 + (02:16:36, 11 December 2024)
- ML20155G579 + (02:16:37, 11 December 2024)
- ML20155G575 + (02:16:38, 11 December 2024)
- ML20155G577 + (02:16:38, 11 December 2024)
- IR 05000223/1988004 + (02:16:56, 11 December 2024)
- ML20155G571 + (02:16:56, 11 December 2024)
- ST-HL-AE-2674, Responds to NRC Re Violations Noted in Insp Repts 50-498/88-21 & 50-499/88-21.Corrective Actions:Review of Procedures Affected by Universal Joint Attachments for Torque Applications Completed + (02:16:57, 11 December 2024)
- ML20155G565 + (02:16:58, 11 December 2024)
- ML20155G566 + (02:16:58, 11 December 2024)
- ML20155G561 + (02:16:59, 11 December 2024)
- ML20155G564 + (02:16:59, 11 December 2024)
- ML20155G560 + (02:17:00, 11 December 2024)
- ML20155G559 + (02:17:01, 11 December 2024)
- ML20155G558 + (02:17:02, 11 December 2024)
- RC-98-0194, Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs + (02:17:02, 11 December 2024)
- ML20155G553 + (02:17:03, 11 December 2024)
- ML20155G549 + (02:17:04, 11 December 2024)
- ML20155G551 + (02:17:04, 11 December 2024)
- ML20155G546 + (02:17:05, 11 December 2024)
- ML20155G544 + (02:17:06, 11 December 2024)
- RC-98-0202, Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (02:17:06, 11 December 2024)
- ML20155G542 + (02:17:07, 11 December 2024)
- ML20155G541 + (02:17:07, 11 December 2024)
- ML20155G539 + (02:17:08, 11 December 2024)
- ML20155G540 + (02:17:08, 11 December 2024)
- B17442, Provides NRC Staff with Update of EOP Rev Effort That Is Ongoing at Mnps,Unit 2.Ongoing Reanalysis Has Resulted in Changes to Actions Necessary for Accident Mitigation. Regulatory Commitment,Encl + (02:17:09, 11 December 2024)
- IR 05000266/1988021 + (02:17:36, 11 December 2024)
- ML20155G536 + (02:17:37, 11 December 2024)
- B17512, Provides Response to RAI Re Review of Mnps,Unit 2 Steam Line Break Analysis.No Regulatory Commitments Contained within Ltr + (02:17:38, 11 December 2024)
- ML20155G535 + (02:17:38, 11 December 2024)