Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-29498, Forwards Supplemental Response to Violations Noted in Insp Rept 50-458/88-18.Corrective Actions:Temporary Change Notice Issued for STP-403-0601 to Reflect Actual Testing Requirements for Standby Gas Treatment Sys.Affidavit Encl + (22:29:25, 10 December 2024)
- 05000395/LER-1999-008, :on 990518,manual RT Initiated Due to Main Turbine High Vibration.Caused by Light Rubbing within New Monoblock Turbine Rotor.Reactor Power Was Reduced.With + (22:29:34, 10 December 2024)
- ML20196B261 + (22:29:35, 10 December 2024)
- ML20196B259 + (22:29:35, 10 December 2024)
- ML20196B258 + (22:29:36, 10 December 2024)
- ML20196B257 + (22:29:37, 10 December 2024)
- ML20196B255 + (22:29:37, 10 December 2024)
- ML20196B253 + (22:29:38, 10 December 2024)
- ML20196B252 + (22:29:38, 10 December 2024)
- 05000423/LER-1999-006-01, :on 990516,both Reactor Plant Aerated Drains SR Air Driven Sump Pumps Failed During TRM Surveillance.Caused by Inadequate Preventive Maint Program Design.Surveillance Procedure Sp 3635B.2 Will Be Conducted Monthly + (22:29:40, 10 December 2024)
- ML20196B248 + (22:29:41, 10 December 2024)
- ML20196B246 + (22:29:42, 10 December 2024)
- ML20196B245 + (22:29:42, 10 December 2024)
- ML20196B242 + (22:29:43, 10 December 2024)
- ML20196B243 + (22:29:43, 10 December 2024)
- ML20196B241 + (22:29:44, 10 December 2024)
- ML20196B235 + (22:29:45, 10 December 2024)
- ML20196B236 + (22:29:45, 10 December 2024)
- ML20196B233 + (22:29:46, 10 December 2024)
- VPN-075-98, Informs That,Per Commitments Made in 981119 Meeting with Nrc,Rev to PGE-1075 Will Be Submitted No Later than 981218 + (22:29:47, 10 December 2024)
- ML20196B229 + (22:29:49, 10 December 2024)
- ML20196B227 + (22:29:50, 10 December 2024)
- 05000423/LER-1999-006, Forwards LER 99-006-00,re Failure of Both Reactor Plant Aerated Drains SR Air Driven Sump Pumps During Technical Requirements Manual Surveillance on 990516.Commitments Also Encl + (22:29:51, 10 December 2024)
- ML20196B222 + (22:29:52, 10 December 2024)
- ML20196B218 + (22:29:53, 10 December 2024)
- ML20196B219 + (22:29:53, 10 December 2024)
- ML20196B215 + (22:29:54, 10 December 2024)
- ML20196B216 + (22:29:54, 10 December 2024)
- ML20196B211 + (22:30:02, 10 December 2024)
- ML20196B209 + (22:30:03, 10 December 2024)
- ML20196B207 + (22:30:03, 10 December 2024)
- ML20196B204 + (22:30:08, 10 December 2024)
- ML20196B203 + (22:30:08, 10 December 2024)
- ML20196B199 + (22:30:09, 10 December 2024)
- ML20196B198 + (22:30:10, 10 December 2024)
- ML20196B197 + (22:30:10, 10 December 2024)
- ML20196B195 + (22:30:13, 10 December 2024)
- ML20196B191 + (22:30:14, 10 December 2024)
- ML20196B193 + (22:30:14, 10 December 2024)
- ML20196B186 + (22:30:15, 10 December 2024)
- ML20196B189 + (22:30:15, 10 December 2024)
- ML20196B183 + (22:30:17, 10 December 2024)
- ML20196B185 + (22:30:17, 10 December 2024)
- ML20196B179 + (22:30:18, 10 December 2024)
- ML20196B177 + (22:30:19, 10 December 2024)
- ML20196B178 + (22:30:19, 10 December 2024)
- 05000344/LER-1988-003, :on 880324,single Failure Mechanism Discovered Which Could Result in Overpressurization of Containment Electrical Penetration Seals.Cause Undetermined.Nitrogen Supply to Subj Penetrations Isolated + (22:30:21, 10 December 2024)
- ML20196B174 + (22:30:22, 10 December 2024)
- ML20196B172 + (22:30:23, 10 December 2024)
- ML20196B173 + (22:30:23, 10 December 2024)
- ML20196B170 + (22:30:24, 10 December 2024)
- ML20196B167 + (22:30:25, 10 December 2024)