Responds to Request for Concurrence with Util Understanding of Applicable Anfb Critical Power Correlation Determination of Atrium-9B Additive Constant Uncertainties. Util Understanding of Clarifications Correct
ML20196B177
Person / Time
Issue date: 11/24/1998
From: Essig T
NRC (Affiliation Not Assigned)
To: Curet H
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
PROJECT-702 NUDOCS 9812010009
Download: ML20196B177 (2)


Text

. _

e. 4 "Eh e 4 UNITED STATES j

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20565 0001

\ *****j/

November 24, 1993 Mr. H. D. Curet, Manager j Product Licensing l Siemens Power Corporation l 2101 Horn Rapids Road -

P. O. Box 130 Richland, WA 99352-0130

SUBJECT:

REQUEST FOR CONCURRENCE WITH SPC'S UNDERSTANDING OF THE I APPLICABLE OF "ANFB CRITICAL POWER CORRELATION DETERMINATION OF ATRIUM-98 ADDITIVE CONSTANT UNCERTAINTIES," i ANF-1125(P), SUPPLEMENT 1, APPENDIX E, REVISION 0 l Ref.: 1 Letter, H. D. Curet to Document Control Desk, " Request for Concurrence with SPC's Understanding of the Applicable of"ANFB Critical Power Correlation Determination of Atrium-98 Additive Constant Uncertainties," ANF-1125(P),

Supplement 1, Appendix E, Revision 0, November 18,1998.

Ref.: 2 Letter, Thomas H. Essig to H. D. Curet " Acceptance for Referencing of SPC Licensing Topical Report ANF-1125(P), Supplement 1 Appendix E, 'ANFB Critical Power Correlation Determination of Atrium-9B Additive Constant Uncertainties' (TAC No. MA2437), September 23,1998 i

On November 18,1998, Siemens Power Corporation (SPC) transmitted a letter (Reference 1) .

to the NRC requesting NRC's concurrence with SPC's understanding of the safety evaluation l report (SER) for SPC topical report ANF-1125, Supplement 1, Appendix E,"ANFB Critical Power Correlation Determination of Atrium-9B Additive Constant Uncertainties". In the letter, you requested the following points be clarified:

. NRC's concurrence with the definition of the maximum design limit in order to avoid any future misunderstanding regarding the application of )D the limit. (The discussion of the definition for maximum design limit is provided in Attachment A of your letter dated November 18,1998.)

. NRC's concurrence with SPC's understanding that safety limit g'y calculations using an ANFB additive constant uncertainties (ACU) value &

of 0.029 continue to be acceptable for Atrium-9B fuel.

The NRC staff finds that SPC's understanding of the above clarifications correct. Please note that in addition to the SER for the Reference 2 topical report, this letter and the Reference 1 letter dated November 18,1998 should be placed in the approved version of the topical report, ANF-1125, Supplement 1 Appendix E,"ANFB Critical Power Correlation Determination of Atrium-98 Additive Constant Uncertainties". 4 9812010009 981124 f,W 3 3 PDR TOPRP EMVEXXN u,, C,m PDR ] c,%

t <5c-3 Mr. D Curet If you have any questions regarding this matter please contact Mr. Egan Wang of my staff by phone 301-415-1076 (email eyw@nrc. gov) or, Ms. Margaret Chatterton at 301-415-2889 (email msci@nrc. gov).

Sincerely,

/$

f}~$ Generic Thomas Issues H. Essig, Acting Chief and Environmental J Projects Branch Office of Nuclear Reactor Regulation Project No. 702 DISTRIBUTION:

Central File PUBLIC GHolahan TEssig AAttard FAkstulewicz MChatterton TCollins JRoe EWang PGEB r/f OGC ACRS Document Name: clarify 1.ser

/ b

/ t ,

OFFICE PGEB 6/ ) SCiP%3h BC:SRXB g(%9CEB NAME EWang:I FAhhicz TCollins d5)dssig j DATE 11/23/98 1[M/98 11 /22/98 11 /2//98 1

OFFICIAL RECORD COPY