- 05000265/LER-1987-005-10, :on 870321,main Generator Tripped Due to Actuation of Main Transformer Sudden Pressure Relay.Cause Not Determined.Transformer Sudden Pressure Relay & Sudden Pressure Inhibit Relay Replaced + (21:19:55, 10 December 2024)
- ML20196G768 + (21:19:56, 10 December 2024)
- ML20196G767 + (21:20:00, 10 December 2024)
- 05000265/LER-1987-004-10, :on 870218,suppression Chamber to Drywell Vacuum Breaker 2-1601-33A Would Not Return to Normal Closed Position After Being Tested.Caused by Either Slightly Dimpled Valve Bushing or Corroded Solenoid + (21:20:02, 10 December 2024)
- ML20196G764 + (21:20:03, 10 December 2024)
- 05000353/LER-1997-004-01, :on 930316,failed to Obtain Offgas Sys Grab Sample within Four Hour Interval Required by Ts.Caused by Personnel Error.Analyzed Sample within Following Four Hours, IAW TS & Revised Chemistry Section Sample Program + (21:20:05, 10 December 2024)
- AECM-88-0021, Degraded Core Accident Hydrogen Control Program, Quarterly Rept Covering Period 871031-1231 + (21:20:06, 10 December 2024)
- ML20196G762 + (21:20:06, 10 December 2024)
- 05000336/LER-1998-024-01, :on 981030,potential Leakage Path Through Containment Pressure Instrument Was Identified.Caused by Failure to Adequately Consider FSAR Design Commitments. Replaced Nonconforming Containment Pressure Instruments + (21:20:09, 10 December 2024)
- ML20196G755 + (21:20:09, 10 December 2024)
- ML20196G754 + (21:20:10, 10 December 2024)
- 05000353/LER-1997-004, Forwards LER 97-004-00 Re Failure to Obtain Offgas Sys Grab Sample within TS Time Limit on 930316.Delayed Submittal of LER Is Due to Incorrect Assessment of Reportability at Time of Event + (21:20:11, 10 December 2024)
- ML20196G751 + (21:20:11, 10 December 2024)
- IR 05000232/1971001 + (21:20:12, 10 December 2024)
- ML20196G750 + (21:20:12, 10 December 2024)
- ML20196G747 + (21:20:13, 10 December 2024)
- ML20196G748 + (21:20:13, 10 December 2024)
- ML20196G746 + (21:20:14, 10 December 2024)
- HL-5710, Requests Approval of Alternative Reactor Vessel Weld Exam for Ehnp,Unit 1,per 10CFR50.55a(g)(6)(ii)(A)(5) for Permanently Excluding Exam of RPV Circumferential Shell Welds + (21:20:15, 10 December 2024)
- ML20196G743 + (21:20:16, 10 December 2024)
- ML20196G739 + (21:20:17, 10 December 2024)
- ML20196G737 + (21:20:17, 10 December 2024)
- ML20196G734 + (21:20:18, 10 December 2024)
- 05000336/LER-1998-024, Forwards LER 98-024-00 Re 981030 Potential Leakage Path Through Containment Pressure Instrument.Commitments Made by Util,Encl + (21:20:19, 10 December 2024)
- ML20196G732 + (21:20:19, 10 December 2024)
- 05000254/LER-1987-005-09, :on 870317,turbine Trip & Reactor Scram Occurred.Caused by Level Control Valves (LCV) Being Out of Adjustment,Stuck Valve Failure & Inadequate Planning.Program to Track LCV Setpoint Changes Developed + (21:20:21, 10 December 2024)
- IR 05000352/1999003 + (21:20:27, 10 December 2024)
- ML20196G728 + (21:20:28, 10 December 2024)
- NUREG-1210, Testimony of Tj Mckenna Re NUREG-1210.* Related Correspondence + (21:20:28, 10 December 2024)
- ML20196G722 + (21:20:34, 10 December 2024)
- ML20196G718 + (21:20:36, 10 December 2024)
- 05000254/LER-1987-006-08, :on 870403,HPCI Sys Inoperable.Caused by Loose Soldered Connection on Solenoid Valve Coil SV-8.Solenoid Coil Replaced & HPCI Turbine Remote Reset Verified.Solenoid Valves SV-8 & SV-12 Replacement Planned + (21:20:38, 10 December 2024)
- ML20196G715 + (21:20:39, 10 December 2024)
- B17487, Forwards Response to NRC 981023 RAI to Assist in Completing NRC Review of Two Discrepancy Repts DR-MP3-0514 & 0580 + (21:20:40, 10 December 2024)
- ML20196G713 + (21:20:40, 10 December 2024)
- LR-N970372, Requests Approval of Encl Relief Request RR-C2 to Use ASME Code Case N-498-1 W/Reduced Hold Time of 20 Minutes for Pressure Testing Plant HPCI Pump Piping,Hpci Turbine Steam Supply & Exhaust Lines & Associated Drains & Vents + (21:20:41, 10 December 2024)
- 05000254/LER-1987-007-09, :on 870414,diesel Fire Pump 1/2 B Inoperable & Exceeded 7-day out-of-svc Reporting Criteria.Caused by Design Deficiency.Deficiency Repaired,Surveillance Procedures Revised & Voltage Drop Reviewed + (21:20:43, 10 December 2024)
- ML20196G707 + (21:20:44, 10 December 2024)
- ML20196G704 + (21:20:45, 10 December 2024)
- ML20196G705 + (21:20:45, 10 December 2024)
- ML20196G702 + (21:20:46, 10 December 2024)
- ML20196G703 + (21:20:46, 10 December 2024)
- ML20196G701 + (21:20:47, 10 December 2024)
- 05000254/LER-1987-010-08, :on 870519,control Room Ventilation Actuated Due to Toxic Gas Analyzer Failure.Caused by Design Deficiency.Nrc Not Notified Due to Miscommunication.Gas Analyzer Power Restored & Personnel Counseled + (21:20:48, 10 December 2024)
- PNO-III-98-057, on 981204,licensee Reported Teletherapy Treatments with Higher Dose than Intended for 15 Treatments in Planned Series of 25 Treatments.Caused by Calculational Error.Region III Will Conduct Special Insp + (21:20:53, 10 December 2024)
- 05000254/LER-1987-012-08, :on 870624,reactor Bldg & Control Room Ventilation Sys Isolation Occurred.Caused by Relay Coil Failure.Relay Coil Replaced & Tested & Mod M-4-1(2)-85-17 to Replace Similar Relays Initiated + (21:20:54, 10 December 2024)
- ML20196G693 + (21:20:55, 10 December 2024)
- ML20196G692 + (21:20:56, 10 December 2024)
- 05000382/LER-1997-011-01, Forwards LER 97-011-01,revising Previous Submittal Re Water Level Maintained in Containment Spray Risers That May Have Been Less than Required by Ts.Commitments Discussed + (21:20:59, 10 December 2024)
- ML20196G690 + (21:21:00, 10 December 2024)
- ML20196G689 + (21:21:00, 10 December 2024)