Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198R882 + (14:11:37, 10 December 2024)
- ML20198R878 + (14:11:38, 10 December 2024)
- ML20198R876 + (14:11:39, 10 December 2024)
- ML20198R877 + (14:11:39, 10 December 2024)
- ML20198R874 + (14:11:40, 10 December 2024)
- IR 05000369/1986004 + (14:11:41, 10 December 2024)
- 05000245/LER-1997-038-01, :on 971008,RB Roof Was Not Analyzed for Seismic Sse.Caused by Failure to Analyze RB Roof for Higher Loads During Sse.Administrative Controls in Place to Prevent Fuel Movement Until RB Roof Has Been Qualified for SSE + (14:11:43, 10 December 2024)
- ML20198R870 + (14:11:44, 10 December 2024)
- ML20198R864 + (14:11:45, 10 December 2024)
- ML20198R868 + (14:11:45, 10 December 2024)
- ML20198R862 + (14:11:46, 10 December 2024)
- ML20198R860 + (14:11:46, 10 December 2024)
- ML20198R858 + (14:11:47, 10 December 2024)
- ML20198R855 + (14:11:48, 10 December 2024)
- ML20198R856 + (14:11:48, 10 December 2024)
- 05000346/LER-1997-016-01, :on 971217,monthly ECCS Valve Position SR Was Missed.Caused by Flow Path That Was Not Part of Contiguous ECCS Flow Path Envisioned for Compliance W/Ts 4.5.2.Verified Valves Open on 971222 + (14:11:50, 10 December 2024)
- ML20198R853 + (14:11:51, 10 December 2024)
- ML20198R851 + (14:11:51, 10 December 2024)
- ML20198R848 + (14:11:52, 10 December 2024)
- ML20198R847 + (14:11:52, 10 December 2024)
- ML20198R846 + (14:11:53, 10 December 2024)
- PNO-II-98-003, on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release + (14:11:53, 10 December 2024)
- ML20198R844 + (14:11:54, 10 December 2024)
- ML20198R843 + (14:11:55, 10 December 2024)
- ML20198R840 + (14:11:56, 10 December 2024)
- ML20198R839 + (14:11:57, 10 December 2024)
- ML20198R837 + (14:11:58, 10 December 2024)
- ML20198R838 + (14:11:58, 10 December 2024)
- ML20198R834 + (14:11:59, 10 December 2024)
- ML20198R833 + (14:11:59, 10 December 2024)
- ML20198R832 + (14:12:00, 10 December 2024)
- ML20198R830 + (14:12:00, 10 December 2024)
- ML20198R829 + (14:12:01, 10 December 2024)
- ML20198R828 + (14:12:01, 10 December 2024)
- ML20198R824 + (14:12:02, 10 December 2024)
- ML20198R826 + (14:12:02, 10 December 2024)
- ML20198R823 + (14:12:03, 10 December 2024)
- ML20198R819 + (14:12:04, 10 December 2024)
- ML20198R822 + (14:12:04, 10 December 2024)
- ML20198R817 + (14:12:05, 10 December 2024)
- ML20198R818 + (14:12:05, 10 December 2024)
- ML20198R815 + (14:12:06, 10 December 2024)
- ML20198R816 + (14:12:06, 10 December 2024)
- BSEP-86-0721, Responds to Violations Noted in Insp Repts 50-324/85-26 & 50-325/85-26.Corrective Actions:Util Investigating Analysis to Support Qualification of Insulated Cable W/Hypalon Jacketing.Response Will Be Provided by 860630 + (14:12:07, 10 December 2024)
- ML20198R810 + (14:12:07, 10 December 2024)
- ML20198R809 + (14:12:08, 10 December 2024)
- ML20198R806 + (14:12:30, 10 December 2024)
- ML20198R805 + (14:12:31, 10 December 2024)
- IR 05000424/1986040 + (14:12:32, 10 December 2024)
- ML20198R802 + (14:12:32, 10 December 2024)
- ML20198R800 + (14:12:33, 10 December 2024)
- ML20198R798 + (14:12:33, 10 December 2024)