Forwards Insp Repts 50-424/86-31 & 50-425/86-15 on 860401-0513 & Notice of Violation
ML20198R810
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/02/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20198R811 List:
References
NUDOCS 8606100216
Download: ML20198R810 (3)


See also: IR 05000424/1986031

Text

n otucc4 Ct

.

I. .

JUN 0 21986

Docket Nos. 50-424, 50-425

License Nos. CPPR-108, CPPR-109

Georgi Power Company

ATTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NOS. 50-424/86-31 AND 50-425/86-15

On April 1 - May 13,1986, NRC inspected activities authorized by NRC Construc-

tion Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violations, references to pertinent req;irements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original signed by

David M. Verrelli for

!

Luis A. Reyes, Acting Director

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

-

cc w/encis: (See page 2)

'

,

8606100216 860602 l

[g 'e' b(

'

PDR ADOCK 05000424

G PDR ,, l

< ,

< l

1 a

,

.

JUN 0 21986

Georgia Power Company 2

cc w/encls:

R. E. Conway, Senior Vice President &

/ProjectDirector

D. O. Foster, Vice President, Project

j Support

VP. D. Rice, Vice President, Project

f Engineering

JR. H. Pinson, Vice President, Project

Construction

. T. Beckham, Vice President &

General Manager - Operations

R. A. Thomas, Vice President,

f Licensing

VD. S. Read, General Manager,

f Quality Assurance

VC. W. Hayes, Vogtle Quality

/ Assurance Manager

W. C. Ramsey, Manager -

Readiness Review

/G.B.Bockhold,GeneralManager,

Nuclear Operations

. Gucwa, Manager, Nuclear Safety

and Licensing

M. H. Googe, Project

j Construction Manager

,f E. D. Groover, Quality

Assurance Site Manager -

/ Construction

43. A. Bailey, Project Licensing

f Manager

4G. F. Trowbridge, Esq. , Shaw,

1.Pittman,PottsandTrowbridge

B W. Churchill, Esq., Shaw,

d.Pittman,PottsandTrowbridge

L. Blake, Jr., Esq., Shaw,

, Pittman, Potts and Trowbridge

4J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

/J.G.Ledbetter, Commissioner,

Department of Human Resources

1C.H.' Badger,OfficeofPlanning

and Budget

. ]D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. C. Teper, Georgians Against

Nuclear Energy

cc w/encls: (cont'd page 3)

1

, ,

,

.

Georgia Power Company 3

c w/encls: (cont'd)

. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

-

P

[r.anel O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

/G. A. Linenberger, Jr., Administrative

Judge Atomic Safety and Licensing

/ Board Panel

VB. P. Garde, Citizens Clinic, Director

Government Accountability Project

w/encls:

. Reis, ELD

W. M. Hill, IE

V M. Miller, NRR

4.Brach,EDO

v/M. Sinkule, RII

4.Christnot,RII

/NRC Resident Inspector

cument Control Desk

ate of Georgia

RII RII RII

ECh istnot:mw MS ule VBrownlee

5/3 d/86 5/-p/86 5/p/86

w,,, -w--r-y -

y.-