n
otucc4 Ct
I.
.
.
JUN 0 21986
Docket Nos. 50-424, 50-425
License Nos. CPPR-108, CPPR-109
Georgi Power Company
ATTN:
Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
REPORT NOS. 50-424/86-31 AND 50-425/86-15
On April 1 - May 13,1986, NRC inspected activities authorized by NRC Construc-
tion Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments. The violations, references to pertinent req;irements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original signed by
David M. Verrelli for
!
Luis A. Reyes, Acting Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection Report
-
cc w/encis:
(See page 2)
'
,
l
8606100216 860602
'e b
[g ' (
'
ADOCK 05000424
G
,,
l
<
,
l
<
1
a
,
.
JUN 0 21986
Georgia Power Company
2
cc w/encls:
R. E. Conway, Senior Vice President &
/ProjectDirector
D. O. Foster, Vice President, Project
j Support
VP. D. Rice, Vice President, Project
f Engineering
JR. H. Pinson, Vice President, Project
Construction
. T. Beckham, Vice President &
General Manager - Operations
R. A. Thomas, Vice President,
f Licensing
VD. S. Read, General Manager,
f Quality Assurance
VC. W. Hayes, Vogtle Quality
/ Assurance Manager
W. C. Ramsey, Manager -
Readiness Review
/G.B.Bockhold,GeneralManager,
Nuclear Operations
. Gucwa, Manager, Nuclear Safety
and Licensing
M. H. Googe, Project
j Construction Manager
,f E. D. Groover, Quality
Assurance Site Manager -
/ Construction
43. A. Bailey, Project Licensing
f Manager
4G. F. Trowbridge, Esq. , Shaw,
1.Pittman,PottsandTrowbridge
B
W. Churchill, Esq., Shaw,
d.Pittman,PottsandTrowbridge
L. Blake, Jr., Esq., Shaw,
, Pittman, Potts and Trowbridge
4J. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
/J.G.Ledbetter, Commissioner,
Department of Human Resources
1C.H.' Badger,OfficeofPlanning
and Budget
. ]D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. C. Teper, Georgians Against
Nuclear Energy
cc w/encls:
(cont'd
page 3)
1
,
,
,
.
Georgia Power Company
3
c w/encls: (cont'd)
. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
[r.anel
P
-
O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
/G. A. Linenberger, Jr., Administrative
Judge Atomic Safety and Licensing
/ Board Panel
VB. P. Garde, Citizens Clinic, Director
Government Accountability Project
w/encls:
. Reis, ELD
W. M. Hill, IE
V M. Miller, NRR
4.Brach,EDO
v/M. Sinkule, RII
4.Christnot,RII
/NRC Resident Inspector
cument Control Desk
ate of Georgia
RII
RII
RII
ECh istnot:mw
MS
ule
VBrownlee
5/ d/86
5/-p/86
5/p/86
3
w,,,
-w--r-y
-
y.-