Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323F251 + (01:18:39, 1 January 2025)
- ML19323F250 + (01:18:40, 1 January 2025)
- A00803, Application to Amend License DPR-65,submitted as Proposed Revision to Tech Specs,In Response to NRC . Summarizes Status of Implementation of Automatic Initiation of Auxiliary Feedwater.One Pump Sufficient + (01:18:41, 1 January 2025)
- 05000259/LER-1980-035, Forwards LER 80-035/03L-0 + (01:18:46, 1 January 2025)
- ML19323F242 + (01:18:52, 1 January 2025)
- ML19323F240 + (01:18:54, 1 January 2025)
- ML19323F239 + (01:18:55, 1 January 2025)
- 05000254/LER-1980-010-03, /03L-0:on 800423,while Performing Loss of Electrohydraulic Control Fluid Pressure Scram Surveillance, Pressure Switch 1-5600-PS-3 Tripped Below Tech Spec Limit. Caused by Instrument Setpoint Drift.Switch Adjusted + (01:18:57, 1 January 2025)
- 05000366/LER-1980-074-03, /03L-0:on 800427,core Max Fraction of Limiting Power Density Found in Excess of Tech Spec.Cause Not Stated. Average Power Range Monitor Adjusted,Power Reduced & Process Computer Updated,Run & Verified + (01:19:02, 1 January 2025)
- 05000259/LER-1980-039-01, /01T-0:on 800507,util Notified by GE That Qualification of Containment Atmospheric Monitoring Sys Hydrogen Sensors Has Not Been Demonstrated to Meet Purchase Specs.Operating Procedures & Instructions Changed + (01:19:08, 1 January 2025)
- ML19323F232 + (01:19:14, 1 January 2025)
- 05000254/LER-1980-010, Forwards LER 80-010/03L-0 + (01:19:17, 1 January 2025)
- 05000259/LER-1980-039, Forwards LER 80-039/01T-0 + (01:19:21, 1 January 2025)
- ML19323F227 + (01:19:28, 1 January 2025)
- 05000366/LER-1980-074, Forwards LER 80-074/03L-0 + (01:19:31, 1 January 2025)
- 05000298/LER-1980-011-03, /03L-0:on 800418,check Valves Upstream of Accumulators Had Excessive Back Leakage.Caused by BUNA-N Seat Embrittlement Due to Age.Check Valve Seats Replaced W/Ethylene Propylene Matl.Valves Bench Tested + (01:19:36, 1 January 2025)
- ML19323F222 + (01:19:42, 1 January 2025)
- 05000298/LER-1980-011, Forwards LER 80-011/03L-0 + (01:19:48, 1 January 2025)
- ML19323F215 + (01:19:56, 1 January 2025)
- ML19323F214 + (01:19:57, 1 January 2025)
- ML19323F213 + (01:19:59, 1 January 2025)
- ML19323F211 + (01:20:01, 1 January 2025)
- 05000325/LER-1980-045-03, /03L-0:on 800424,while Performing Reactor Low Water 2 & 3 Channel Calibr & Functional Check,Low Level & Pressure Switches Failed to Actuate.Caused by Instrument Drift.Switches Recalibr & Returned to Svc + (01:20:04, 1 January 2025)
- ML19323F209 + (01:20:05, 1 January 2025)
- 05000278/LER-1980-010-03, /03L-0:on 800421,while Performing Surveillance Test,Lpci Injection valve,MO-3-10-25B,failed to Open.Caused by Lack of Guide Clearance Between Valve Disc & Valve Guide. Valve Was Repaired & Stroked Satisfactorily + (01:20:07, 1 January 2025)
- 05000325/LER-1980-045, Forwards LER 80-045/03L-0 + (01:20:12, 1 January 2025)
- ML19323F205 + (01:20:14, 1 January 2025)
- ML19323F204 + (01:20:16, 1 January 2025)
- ML19323F203 + (01:20:18, 1 January 2025)
- 05000324/LER-1980-041-03, /03L-0:on 800425,while Performing Reactor Low Water 2 & 3 Channel Calibr & Functional Check,Low Level Switch Actuated Below Tech Spec Limits.Caused by Instrument Drift.Switch Recalibr & Return to Svc + (01:20:20, 1 January 2025)
- 05000267/LER-1980-021-03, /03L-0:on 800421,w/reactor Shut Down,Main Steam Pressure Low Instrument Discovered Inoperable.Caused by Bad Connection Due to Dirty Contact.Contacts Cleaned & Module Returned to Svc + (01:20:24, 1 January 2025)
- 05000267/LER-1980-021, Forwards LER 80-021/03L-0 + (01:20:27, 1 January 2025)
- ML19323F197 + (01:20:29, 1 January 2025)
- 05000324/LER-1980-041, Forwards LER 80-041/03L-0 + (01:20:38, 1 January 2025)
- ML19323F191 + (01:20:41, 1 January 2025)
- AECM-80-102, Status Rept 5 of Potentially Reportable Deficiency Re Inadequate Circuit Separation.Investigation Expanded to Address Adequacy of GE Supplied Components & Control Room Panels.Final Rept by 801201 + (01:20:42, 1 January 2025)
- ML19323F188 + (01:20:46, 1 January 2025)
- ML19323F185 + (01:20:54, 1 January 2025)
- ML19323F184 + (01:20:57, 1 January 2025)
- 05000327/LER-1980-046-01, /01T-0:on 800509,environ Temp Effect on Main Steam Safety Valve Setpoints Not Considered in Design Analysis. Caused by Failure to Consider Environ Temp Variation.Design Evaluation Will Determine Corrective Actions Required + (01:21:02, 1 January 2025)
- ML19323F182 + (01:21:06, 1 January 2025)
- ML19323F180 + (01:21:08, 1 January 2025)
- ML19323F179 + (01:21:10, 1 January 2025)
- 05000327/LER-1980-046, Forwards LER 80-046/01T-0 + (01:21:13, 1 January 2025)
- ML19323F176 + (01:21:16, 1 January 2025)
- 05000366/LER-1980-075-03, /03L-0:on 800428 Core Max Fraction of Limiting Power Density in Excess of Tech Specs.Corrective Action Failed to Lower Power Density.Caused by Lower than Equilibrium Xenon Distribution During Startup + (01:21:19, 1 January 2025)
- ML19323F173 + (01:21:22, 1 January 2025)
- ML19323F172 + (01:21:24, 1 January 2025)
- ML19323F171 + (01:21:26, 1 January 2025)
- 05000366/LER-1980-075, Forwards LER 80-075/03L-0 + (01:21:30, 1 January 2025)
- ML19323F168 + (01:21:37, 1 January 2025)