ML19323F214
| ML19323F214 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/20/1980 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-80-04, IEB-80-4, TLL-233, NUDOCS 8005280659 | |
| Download: ML19323F214 (1) | |
Text
_ _ _ _ - _ _ _
l l
1 Metropolitan Edison Company Post Office Box 480 gj q Middletown, Pennsylvania 17057 717 944-4041 Writer's Direct Dial Nurnber May 20,1980 TLL 233 Office of Inspection and Enforcement Attn:
B. H. Grier, Director U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pa.
19406
Dear Sir:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 IE Bulletin 80-04 In our response te Bulletin 80-04 of May 9, 1980 (TLL 228), we stated that the TMI-I containment design pressure was 60 psig.
In fact, the containment design pressure for IMI-I is 55 psig. However, the statements made in our initial response are accurate when assuming the 55 psig design pressure.
Therefore, no further revision to our previous submittal is necessary.
Sincerely, Signed J. G. Herbein J. G. Herbein Vice President TMI-I JCH:DCM: hah cc: Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C.
20555 1
J. T. Collins sumppuunsa=
\\
800528065a
'/e!r000' taF E2500 COr*CaN 5 3 5.*er"Ce' Of Pe 09'e't AC' C !.,!M e5 SyS!G"