Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000328/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000416/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000259/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000361/LER-1982-073, Forwards LER 82-073/01T-0.Detailed Event Analysis Submitted +
- 05000311/LER-1982-073, Forwards LER 82-073/01T-0 +
- 05000272/LER-1982-073, Forwards LER 82-073/03L-0.Detailed Event Analysis Encl +
- 05000321/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000373/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000366/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000325/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000324/LER-1978-073, Forwards LER 78-073/03L-0 +
- 05000316/LER-1978-073, Forwards LER 78-073/03L-0 & LER 78-074/03L-0 +
- 05000321/LER-1978-073, Forwards LER 78-073/03L-0 +
- 05000387/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000338/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000317/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000302/LER-1982-073, Forwards LER 82-073/04T-0 +
- 05000339/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000302/LER-1981-073, Forwards LER 81-073/03L-0 +
- 05000331/LER-1982-073, Forwards LER 82-073/03L-0 +
- 05000362/LER-1983-073, /03L-0:on 830929,boronmeter 3AE0203 Rendered Inoperable When Manual Isolation Valves S31208MU084 & S31208MU091 Closed.Caused by Improper Sys Lineup.Corrective Actions Described in LER 83-073/03L-0 +
- 05000354/LER-1986-073, :on 861003,during Local Leak Rate Testing of Type D Electrical Penetrations,Personnel Discovered Check Valve to Electrical Peneration 1-HW-204 Installed in Reverse.Caused by Incorrect Field Installation +
- 05000440/LER-1986-073, :on 861025,both Trains of Control Room Ventilation (HVAC) Sys Shifted Into Emergency Recirculation Mode & Standby Train of Annulus Exhaust Gas Treatment Sys Started.Caused by Inadequate Procedure.Instructions Revised +
- 05000482/LER-1986-073-01, Forwards LER 86-073-01,re Event in Which Wolf Creek TSs Were Not Met.Commitments Made by Util,Encl +
- 05000528/LER-1985-073, :on 850915,step Determining RCS (AB) Flowrate Signed Off as Not Applicable.Flowrate Determination Also Missed in Surveillances on 850606 & 0705.Flowrate Verified Satisfactory by Completion of 41ST-12218 +
- 05000321/LER-1979-073-03, /03L-0:on 790827,water Supply for Control Room Charcoal Filter Fire Protection Deluge Sys Did Not Meet Seismic & Redundancy Requirements.Caused by Low Plant Svc Water Pressure Leading to Trips & Leakage +
- 05000424/LER-1987-073, :on 871221,control Room Ventilation Isolation Actuation Initiated Due to High Level Alarm.Caused by Faulty Sensing Tube for Radiation Monitor & Computer Software Design.Tube Replaced & Software Changed +
- 05000266/LER-1978-073-03, /03L on 781121:failure to Submit RO 50-366/78-55 W/In 30 Days.Caused by Deviation Rept 2-78-79 Not Received by Responsible Dept Head Nor Superintendent of Plant Engr Svcs.Personnel Were Reminded of Procedures +
- 05000366/LER-1978-073, Forwards LER 78-073/03L-0 +
- 05000482/LER-1985-073, :on 850911,violation of Tech Spec 3.3.3.8 Discovered When Five Transmitters/Receivers Associated W/ Control Room Fire Alarm Control Panel Found Disabled.Caused by Operator Error +
- 05000454/LER-1985-073, :on 850722,feedwater Isolation Occurred Due to High Level in Steam Generator 1B.Caused by Surge in Indication Level in Response to Sudden Momentary Drop in Steam Header Pressure & Increase in Steam Flow +
- 05000352/LER-1985-073, :on 850911,reactor Scrammed on Low Level Due to Feedwater Pump Trip on Low Suction Pressure & Isolation Signal Occurred.Caused by Loss of Condensate Pump B.Reactor Stabilized Using Trip Procedures T-99 & 100 +
- 05000327/LER-1984-073, :on 841212,110 Fire Doors Failed to Meet Ul Stds.Caused by Maint & Mods Performed on Doors.Fire Watches Set Per Tech Specs & Mod/Repair Schedule & long-term Maint Being Addessed +
- 05000361/LER-1984-073, :on 841130,control Room Isolation Sys Train B Spuriously Actuated by Radiation Monitor 2/3 RI-7825.Caused by Electrical Noise Spike of Unknown Origin.Cause Being Investigated.Sys Reset & Secured +
- 05000374/LER-1984-073-01, :on 841112,reactor Water Cleanup Sys (Rwcs) Isolated on High Differential Temp in Pump Rooms.Caused by Lack of Circulating Air.Ge Investigating Differential Flow Setpoint +
- 05000373/LER-1984-073, :on 841106,turbine Stop Valves 1,3 & 4 Opened. Caused by Open Position Switch (NO15) on Step Valve 2.Limit Switch Adjusted on Valve 1B21-MSV2 +
- 05000397/LER-1984-073, :on 840708,spurious Hi Chlorine Alarm from WOA-SR-15 Caused Control Room Emergency Filtration Sys to Auto Start.Caused by Component Failure in Electronics Module on Chlorine Analyzer.Alarm Reset +
- 05000278/LER-1976-073-03, /03L:on 761110,RCIC Inboard Steam Supply Isolation Valve MO-3-13-15 Failed to Close from Handswitch During Surveillance Test.Cause Unknown.Valve Declared Inoperable & Outboard Isolation Valve Closed +
- 05000277/LER-1976-073-03, /03L:on 760914,HPCI Steam Line High Flow Switch DPIS 2-23-76 Trip Setting Exceeded Tech Spec Limit.Caused by Setpoint Shift.Switch Recalibr & Retested +
- 05000237/LER-1976-073-03, /03L-0:on 761117 During Start Up Operations, Nitrogen Storage Tank Level Dropped Below Tech Spec Limit. Addl Nitrogen Delivered to Restore Storage Tank Level +
- 05000315/LER-1983-073-03, Min Average Ice Weight of Sample Ice Condenser Baskets Less than 1,220 Lb Per Basket. Caused by Natural Sublimation.Ice Mass Fully Reconditioned to Optimize Ice Density +
- 05000260/LER-1983-073-03, /03L-0:on 831128,percent Power/Core Max Limiting Power Density Ratio Found Less than Tech Spec Limit.Caused by Xenon Transient Due to Reactor Scram & Pulling of Rods to Prescram Pattern.Rods Inserted +
- 05000255/LER-1983-073-01, /01T-0:on 831121,discovered That Tech Spec Surveillance Procedure Tests Only One of Three Water Flow Switch Detectors for Switchgear Room 1-D.Caused by Procedural Inadequacy +
- 05000339/LER-1983-073-03, /03L-0:on 831107 & 14,w/unit in Mode 1 at 100% Power,Inner Personnel Hatch Door Found to Have Unacceptable Leak Rate,Contrary to Tech Spec 3.6.1.3.Caused by Dirty Door Seals Due to Multiple Containment Entries +
- 05000348/LER-1983-073-03, /03L-0:on 831018,train a Chlorine Detector Declared Inoperable Due to Broken Detector Tape.Caused by Failure of Shaft Which Holds Tape Cassette in Place.Shaft Repaired +
- 05000338/LER-1983-073-03, /03L-0:on 831028,containment Average Temp Dropped Below 86 F.Caused by Component Cooling Water to Containment Cooling Coils Dropping 20 F.Large Heat Load Changing Procedure Will Be Revised +
- 05000362/LER-1983-073-01, /01T-0:on 830929,charging & Letdown Flows Isolated by Closing Manual Isolation Valves S31208MU084 & S31208MU091 in Violation of Limiting Conditions of Operation.Caused by Personnel Error.Valves Opened on 830930 +
- 05000324/LER-1983-073-03, /03L-0:on 830824,during Surveillance,Instrument Indication of Reactor Water Cleanup Sys Differential Flow Indicator 2-G31-R615,GE Model 180,indicated High.Caused by Entrapped Air in Transmitter Sensing Lines +
- 05000370/LER-1983-073-03, /03L-0:on 831026,main Steam PORVs 2SV-1,7,13 & 19 Did Not Receive Close Signal from Solid State Protection Sys Train A.Caused by Disconnected Wire.Wire Reconnected +
- 05000369/LER-1983-073-03, /03L-0:on 830829,surveillance Test Review Determined That Monthly Test on RCS Cold Leg Accumulator Pressure Not Performed by Required Date of 830506.Caused by Personnel Error +