Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000528/LER-2016-001, Leakage from Reactor Coolant Pump 2B Discharge Pipe Instrument Nozzle +
- 05000293/LER-2016-001, Regarding Both Emergency Diesel Generators Inoperable +
- IR 05000335/2016010 +
- IR 05000313/2016007 +
- IR 05000341/2016201 +
- IR 05000424/2016502 +
- ML15132A569 +
- ML16131A582 +
- ML16162A101 +
- ML16152A116 +
- ML16165A028 +
- W3F1-2016-0044, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2015 +
- ML16162A755 +
- ML16154A182 +
- RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability +
- ML16147A121 +
- CAC:MF5204 +
- ML16141A363 +
- ML16165A421 +
- L-16-096, Transmittal of 2015 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models and Commitment Change Related to Revised Peak Cladding Temperature Analysis +
- GNRO-2016/00032, NRC Form 536 Revision June 2016 +
- ML16162A014 +
- ML16162A013 +
- ML16161A850 +
- ML16161A516 +
- ML16165A324 +
- ML16162A717 +
- NL-16-0810, Submittal of Post Accident Monitoring Report +
- NOC-AE-16003369, Applicability of Application Supplement 1 Correspondence to Supplement 2 to STP Risk-Informed GSI-191 Licensing Application +
- CNL-16-094, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 20, Responses to Requests for Additional Information +
- ML16165A280 +
- OI 4-2014-048, Notice of Violation and NRC Investigation Report 4-2014-048 +
- NL-16-0169, Southern Nuclear Operating Company Response to Third Request for Additional Information Regarding Standard Emergency Plan: Enclosure 11, Vogtle Units 1 and 2 Standard Emergency Plan Annex (Marked-Up Pages and Clean Copy) +
- NL-16-0628, Southern Nuclear Operating Company Response to Third Request for Additional Information Regarding Standard Emergency Plan: Cover Letter, Attachment 1 and Enclosures 1 - 10 +
- DCL-16-061, Diablo Canyon, Units 1 and 2 - Supplement to License Amendment Request 15-03, Application of Alternative Source Term. +
- ML19115A263 +
- 05000348/LER-2016-001, Regarding Condition Prohibited by Technical Specifications Due to 600V Load Center Inoperable Longer than Allowed by Technical Specifications +
- 05000387/LER-2016-013, Regarding Secondary Containment Declared Inoperable Due to Simultaneous Opening of Double Airlock Doors +
- 05000387/LER-2016-014, Regarding Secondary Containment Declared Inoperable Due to Airlock Doors Open Due to a Human Performance Error +
- ML16148A211 +
- ML16162A006 +
- ML16176A148 +
- ML16169A264 +