Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059D277 + (January 7, 1994)
- ML20199H732 + (January 7, 1994)
- ML20199H719 + (January 7, 1994)
- 05000265/LER-1993-023-01, :on 931209,determined That Should LOOP Occur Concurrent W/Loca & Single Failure of 125 Volt Dc TB Bus 1A Unit Would Be W/O EDG Due to Design Deficiency.Edg 1/2 Logic Locations/Levels Modified + (January 7, 1994)
- 05000271/LER-1993-015, :on 931008,identified That Size of LPCS Suction Strainers Smaller than That Previously Assumed Due to Use of Unverified Info.Lpcs Suction Strainers Replaced W/Larger Strainers on 931013 & 14 + (January 7, 1994)
- 05000278/LER-1993-011-02, :on 931211,terminal Block in Bottom of 4 Kv Cubicle Knocked Off Its Mount.Caused by Improper Coordination of Required TS Surveillance Requirement Shift Supervisor.Supervisor Counselled + (January 7, 1994)
- 05000271/LER-1993-014, :on 931009,alternate Cooling Sys Determined to Be Inoperable.Caused by Personnel Inadequately Establishing Acceptance Criteria for Insp of Cooling Tower Basin & Suction Pit.Deep Basin Drained + (January 7, 1994)
- 05000412/LER-1993-016, :on 931209,inadvertent Deactivation of Signal from Two Containment Isolation Valves Occurred.Caused by Personnel Error.Temporary Mod 2-94-001 Implemented on 931210,restoring Power to Auxiliary Relays + (January 7, 1994)
- ML20059H665 + (January 7, 1994)
- ML20059F423 + (January 7, 1994)
- ML20059H948 + (January 7, 1994)
- ML20059F070 + (January 7, 1994)
- ML20059L004 + (January 7, 1994)
- ML20059F061 + (January 7, 1994)
- IR 05000280/1993029 + (January 7, 1994)
- ML18100A809 + (January 7, 1994)
- 05000397/LER-1993-031, :on 931109,engineering Evaluation Determined That MCR HVAC Sys Will Not Maintain CR Temp.Caused by Inadequate Design Margin in Original Design.Per Written to Document Potential Analysis Concerns + (January 7, 1994)
- ML17352A379 + (January 7, 1994)
- IR 05000275/1993032 + (January 7, 1994)
- IR 05000261/1993026 + (January 7, 1994)
- ML16342A386 + (January 7, 1994)
- TAC:M88416 + (January 7, 1994)
- ML17331B219 + (January 7, 1994)
- ML17331B221 + (January 7, 1994)
- ML16342A384 + (January 7, 1994)
- ML20059F083 + (January 7, 1994)
- ML18153B438 + (January 7, 1994)
- ML20249B473 + (January 8, 1994)
- ML20059G970 + (January 8, 1994)
- ML20059F899 + (January 8, 1994)
- 05000456/LER-1993-006-09, :on 931209,potential Inoperability of Auxiliary Feedwater Switchover Due to Inadequate Design Change Identified.Caused by Design Change.Procedures Tested & Revised + (January 8, 1994)
- ML20029D831 + (January 8, 1994)
- ML20199A049 + (January 9, 1994)
- ML20059F694 + (January 9, 1994)
- ML17263A526 + (January 10, 1994)
- Press Release-94-003, NRC Staff Asks Utility Licensees for Additional Information on THERMO-LAG Fire Barrier Materials + (January 10, 1994)
- Press Release-94-002, NRC Licensing Board Schedules Prehearing Conference for Oncology Services, Indiana (PA) Cancer Center + (January 10, 1994)
- ML18037A661 + (February 17, 1993)
- ML18037A658 + (January 10, 1994)
- ML030780271 + (January 10, 1994)
- ML021760189 + (January 10, 1994)
- ML20063C358 + (January 10, 1994)
- ML20063A873 + (January 10, 1994)
- ML20062N860 + (January 10, 1994)
- ML20062N840 + (January 10, 1994)
- ML20062N768 + (January 10, 1994)
- ML20062N670 + (January 10, 1994)
- ML20062N647 + (January 10, 1994)
- ML20062N541 + (January 10, 1994)
- ML20059K967 + (January 10, 1994)
- ML20059J096 + (January 10, 1994)
- ML20059H405 + (January 10, 1994)
- ML20059G697 + (January 10, 1994)
- ML20059G691 + (January 10, 1994)
- ML20059G590 + (January 10, 1994)