Text
!
i 4
~
+
t Nm UTILITIES cone,,,o,,ico,. s,ioen si,,,,,3,,,,n, conn.c,,co, 1
EaCE
,w P o BOX 270
(($N EYC.,
HARTFORD CONNECTICUT 06141-0270 k
]
.ai
.s,,ua.. nor e cw.
(203) 665-5000 DON ALD B. MILLER, Jr.
SEMOR VICE PRESIDENT - MILLSTONE Re: 10CFR50.71(a)
January 10, 1994 MP-94-16 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating License No. DPR-65 Docket No. 50-336 1
Dear Sir.:
This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 for the month of December 1993, in accordance with Appendix A Technical Specifications, Section 6.9.1.5. One additional copy of the report is enclosed. Also enclosed is a revised copy of the November,1993, Unit Shutdowns and Power Reductions.
Very truly yours, NORTHEAST NUCLEAR ENERGY
>MP y
D. B. Miller, Jr.
Senior Vice President - Millstone Stat.
n DBM/sid
-cc:
T. T. Martin, Region l Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 P. D. Swetland, Senior Resident inspector, Millstone Unit Nos.1, 2 & 3 9401100012 T40110
/
osw ntu-ee PDR ADOCK~05000336 9@ ~
j R-PDR 8
7 r