ML20062N541

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1993 for Millstone Unit 2 & Revised Copy of Nov 1993 Unit Shutdowns & Power Reductions for Millstone Unit 2
ML20062N541
Person / Time
Site: Millstone 
Issue date: 01/10/1994
From: Miller D
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20062N544 List:
References
MP-94-16, NUDOCS 9401180012
Download: ML20062N541 (1)


Text

!

i 4

~

+

t Nm UTILITIES cone,,,o,,ico,. s,ioen si,,,,,3,,,,n, conn.c,,co, 1

EaCE

,w P o BOX 270

(($N EYC.,

HARTFORD CONNECTICUT 06141-0270 k

]

.ai

.s,,ua.. nor e cw.

(203) 665-5000 DON ALD B. MILLER, Jr.

SEMOR VICE PRESIDENT - MILLSTONE Re: 10CFR50.71(a)

January 10, 1994 MP-94-16 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336 1

Dear Sir.:

This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 for the month of December 1993, in accordance with Appendix A Technical Specifications, Section 6.9.1.5. One additional copy of the report is enclosed. Also enclosed is a revised copy of the November,1993, Unit Shutdowns and Power Reductions.

Very truly yours, NORTHEAST NUCLEAR ENERGY

>MP y

D. B. Miller, Jr.

Senior Vice President - Millstone Stat.

n DBM/sid

-cc:

T. T. Martin, Region l Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 P. D. Swetland, Senior Resident inspector, Millstone Unit Nos.1, 2 & 3 9401100012 T40110

/

osw ntu-ee PDR ADOCK~05000336 9@ ~

j R-PDR 8

7 r