Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-09-010, Reply to Request for Additional Information Regarding Proposed Changes to Technical Specifications on Diesel Generator Endurance Test Surveillance + (February 6, 2009)
- ML090390026 + (February 6, 2009)
- ML090390017 + (February 6, 2009)
- NL-09-022, Supplement to Request for Relief 3-48 and 3-47 (I) to Support Refuel Outage 15 Inservice Inspection Program + (February 6, 2009)
- LR-N09-0029, Response to Request for Additional Information Regarding License Amendment Request - Snubbers + (February 6, 2009)
- RA09-002, Cycle 3 Core Operating Limits Report + (February 6, 2009)
- L-PI-09-020, Submittal of Supplemental Information Regarding Application for Renewed Operating Licenses + (February 6, 2009)
- L-2009-035, Third Interval Relief Requests 31 and 32 + (February 6, 2009)
- ML090410485 + (February 6, 2009)
- ML090370861 + (February 6, 2009)
- ML090370379 + (February 6, 2009)
- ML090370359 + (February 6, 2009)
- NRC-09-0008, Detroit Edison - Fermi 2, Waste Shipment Not Received within Twenty Days + (February 6, 2009)
- ML090360313 + (February 6, 2009)
- ML090280581 + (February 6, 2009)
- ML090080214 + (February 6, 2009)
- ML090050442 + (February 6, 2009)
- NRC-2008-0670, Exemption from Requirements of 10 CFR Part 50, Appendix R, Section III.G.1.b for Fire Area 31 + (February 6, 2009)
- 05000483/LER-2008-006, Regarding Reactor Trip Due to Turbine Trip During Power Reduction Following Loss of C Condensate Pump + (February 6, 2009)
- 05000483/LER-2008-007, Intermediate Range Hi Flux Reactor Protection System Actuation While Shutdown + (February 6, 2009)
- 05000272/LER-2008-002, Missed Containment Spray Valve Surveillance Per Technical Specification 4.0.5 + (February 6, 2009)
- NLS2009009, Transmittal of Revision 12 to Emergency Plan Implementing Procedure EPIP 5.7.23, Activation of the Jic + (February 6, 2009)
- ML090370786 + (February 6, 2009)
- ML090480483 + (February 6, 2009)
- TAC:ME0413 + (February 6, 2009)
- ML090830546 + (February 8, 2009)
- IR 05000456/2008005 + (February 9, 2009)
- IR 05000298/2008005 + (February 9, 2009)
- IR 05000416/2008005 + (February 9, 2009)
- ML090400437 + (February 9, 2009)
- IR 05000272/2008005 + (February 9, 2009)
- RIS 2007-21, Rev. 1, Adherence to Licensed Power Limits + (February 9, 2009)
- ML090410640 + (February 9, 2009)
- ML090480143 + (February 9, 2009)
- ML13057A621 + (February 9, 2009)
- ML091960148 + (February 9, 2009)
- ML091960128 + (February 9, 2009)
- ML092860054 + (February 9, 2009)
- ML092380577 + (February 9, 2009)
- TAC:MC8282 + (February 9, 2009)
- ML090300566 + (February 9, 2009)
- ML090540441 + (February 9, 2009)
- ML090510661 + (February 9, 2009)
- ML090480487 + (February 9, 2009)
- ML090480334 + (February 9, 2009)
- ML090440206 + (February 9, 2009)
- BVY 09-011, 2008 Summary Report Inservice Inspection and Repair or Replacement + (February 9, 2009)
- L-2009-034, Ninety-Day Post-Outage Supplemental Response to NRC Generic Letter 2008-01 (Following the Unit 1 Fall 2008 Refueling Outage), Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems + (February 9, 2009)
- ML090430138 + (February 9, 2009)
- ML090430136 + (February 9, 2009)
- ML090410625 + (February 9, 2009)