Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-3504, Forwards Susquehanna Steam Electric Station Unit 1 Fifth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 +
- ML17157A572 +
- ML17262A364 +
- ML060790162 +
- ML18153C534 +
- ML20059B834 +
- ML20070T361 +
- ML20067E632 +
- ML20067E623 +
- ELV-02504, Forwards Findings & Corrective Actions Taken by Smithkline Beecham Clinical Labs Re Two Presumptive Positive Samples Forwarded from Southern Nuclear Operating Co on 910108 for Confirmation Testing +
- ML20067E276 +
- ML20067D056 +
- ML20067C248 +
- ML20067C242 +
- ML20066J387 +
- ML20066H140 +
- ML20066H002 +
- ML20066G998 +
- ML20066G989 +
- ML20066G971 +
- ML20066G339 +
- ML20066G320 +
- ML20066G311 +
- ML20073P867 +
- ML20072V308 +
- ML20072T254 +
- ML20134A548 +
- ML20134A585 +
- ML20261F570 +
- TAC:71200 +
- ELV-02446, Responds to Violations Noted in Special Team Insp Repts 50-424/90-19 & 50-425/90-19 on 900806-17.Corrective Actions: Record Correction Notice Initiated for Procedure 88014-C, RCS Flow Measurement +
- U-601794, Forwards fitness-for-duty Rept for Jul-Dec 1990,consisting of Performance Data for Personnel Subj to 10CFR26 +
- 0CAN029105, Revises Commitment Re Rev to Procedure 2503.017, Unit 2 Local Leak Rate Testing, Per Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47.Procedure Will Be Revised Prior to Refueling Outage Scheduled to Begin on 910222 +
- 0CAN029108, Forwards Endorsement 93 to Nelia Policy NF-0210,Endorsement 82 to Maelu Policy MF-0074,Endorsement 9 to Nelia Certificate NW-0116,Endorsement 9 to Maelu Certificate MW-0047 & Endorsement 21 to Nelia Certificate N-0048 +
- ST-HL-AE-3678, Forwards Rev 8 to Operations QA Plan, as Replacement for Updated FSAR Chapter 17.2 +
- RBG-34-462, Forwards Notification of Nuclear Insurance Coverage +
- U-601790, Summarizes Util Performance Improvement Since 891031 Re End of SALP 9 Period & Presents Brief Description of 1991 Initiatives for Further Improvement of Performance +
- TAC:79621 +
- ML20266J066 +
- ML20266J064 +
- ML20266J056 +
- ML20266J053 +
- ML20266J060 +
- 05000259/LER-1991-001-01, :on 901227 & 31,failure of Two Trains of Standby Power Sys to Load Sequence Occurred.Caused by Unexpected Failure Affecting Reliability of Equipment. Parallel Redundant Contacts Added +
- 05000374/LER-1991-001-04, :on 910110,three Open Conduit Penetrations Discovered on 687 Ft Elevation of Diesel Generator Bldg Fire Rated Barriers,Which Could Render HPCS Inoperable.Caused by Personnel Error.Fire Watch Initiated +
- 05000499/LER-1991-001, :on 910109,feedwater Isolation Valve Closed During Investigation of Low Nitrogen & Hydraulic Pressure Alarms.Caused by Personnel Error & Inadequate Procedure. Licensed & non-licensed Operators Trained +
- ML20067E734 +
- ML20067E739 +
- ML20067E505 +
- 05000285/LER-1991-001, :on 910109,determined That Containment Tendon Surveillances Performed in 1981 & 1985 Did Not Reflect Guidance in Tech Specs.Caused by Inadequate Administrative Controls.Testing Program Plan Implemented +