Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML110830236 +
- ML110830237 +
- ML20044E552 +
- ML20044E144 +
- ML20044D080 +
- 05000445/LER-1993-005, :on 930401,discovered That Quarterly Valve Stroke Time Testing Not Performed for Safety Chilled Water Sys Prior to Violation Date of 930329 Due to Personnel Error.Subj Testing Performed +
- 05000369/LER-1993-003, Forwards LER 93-003-00 Re Problem Investigation Process 0-M93-0198 Covering Past Inoperability of Train B of CR Ventilation Sys Due to Possible Fabrication/Installation Deficiency +
- ML20059B887 +
- ML20058L784 +
- ML20076G381 +
- ML20262D424 +
- ML20058P633 +
- JAFP-93-0265, Special Rept 93-003 Re Nonfunctional Fire Barrier Penetration Seal Due to Design & Equipment Problems.Drain Piping Installed,Penetration Sealed & Determined to Be Operable on 930420 +
- ET-NRC-93-3877, Forwards Proprietary Presentation Matls from 930420 Meeting W/Nrc on AP600 ADS Tests at Vapore Facility & 930422 Meeting on AP600 Integral Sys Tests at SPES-2 Facility.Affidavit for Withholding Encl.Encl Withheld Per 10CFR9.17(a)(4) +
- ML20057A938 +
- ML20056E040 +
- ML20056C538 +
- ST-HL-AE-4430, Forwards Revised Distribution List of Designated Recipients. Changes Indicated by Asterisk +
- ML20265C337 +
- ML20236T673 +
- ML20199K220 +
- ML20198N669 +
- 05000424/LER-1993-004, :on 930410,ESFAS Sequencer Operation Initiated During Testing.Caused by Design Flaw in Circuit Card. Affected Cards in Both Train a & Train B Sequencers Modified +
- ML20056C215 +
- ML20046D478 +
- ML20045D597 +
- ML20045C522 +
- ML20044F031 +
- ML20044D912 +
- ELV-05414, Comment Supporting Petition for Rulemaking PRM-50-58 Re VEPCO Petition to Change Frequency of Emergency Planning Exercises from Annual to Biennial +
- HL-3179, Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 +
- HL-3256, Forwards Rev 11C to FSAR & Rev 8C to Fire Hazards Analysis for Ei Hatch Nuclear Plant Units 1 & 2,per 10CFR50.71 +
- 05000366/LER-1993-003-01, :on 930407,scram Time Testing on All Control Rods Not Completed Prior to Exceeding 40% Rated Thermal Power.Caused by Personnel Error.Personnel Counseled & Procedures Will Be Revised +
- ML20044G554 +
- ML20044E498 +
- RBG-38-441, Responds to Notice of Violation for Insp Rept 50-458/93-08 on 930308-12.Corrective Actions:Implementing Procedure PSP-4-300 Revised & Security Operations Supervisors & Access Control Officers Retrained on Revised Security Instructions +
- HL-3272, Forwards Response to NRC 930427 Telcon Request to Clarify 921019 TS Amend Request to Remove Main Steam Line Radiation Monitor Trips +
- ML20044D041 +
- ML20044E196 +
- ML20044C932 +
- HL-3270, Special Rept 1-93-003:on 930322 & 0405,discovered That Fire Wrap Matl Not Installed on Several safety-related Cable Trays & Trays Not Installed Properly Following Breach on 930301.Maint Work Order Issued to Make Repairs +
- IR 05000382/1993006 +
- ML20036A499 +
- ML20036A427 +
- ET-NRC-93-3876, Provides Results of Review of NRC 930428 RAI on AP600 & Draft Document Entitled, Defense-In-Dept & Diversity Assessment of...AP600 Protection Sys, .Requests That Subj Assessment Document Be Withheld +
- HL-3271, Special Rept 2-93-001:on 930407,fire Rated Sealing Device 2Z43-H736D Inoperable for Greater than 14 Days.Device Breached to Support Scheduled Refueling Outage Work.Device Restored to Operable Status by 930413 +
- ELV-05412, Comment on Proposed Rule 10CFR50, Requirements for Monitoring Effectiveness of Maint at Nuclear Power Plants. Supports Rule +
- 3F0593-05, Advises That Containment Emergency Sump Ph Control Sys, Using Trisodium Phosphate Dodecahydrate,Operable Prior to Entering Mode 4.Cycle 9 mid-cycle Outage Completed on 930426 +
- JPN-93-032, Withdraws Relief Request for RCIC Sys Hydrostatic Pressure Tests,Submitted Via +
- LD-93-073, Forwards Addl Sys 80+ Submittal 1 Design Descriptions & ITAAC Covering Station Svc Water Sys & Component Cooling Water Sys.Changes Will Be Incorporated in Final Amend Targeted for Submittal on 930630 +