\\*****p May 3,1993 Project No. 680 ORGANIZATION: ASEA BROWN BOVERI-COMBUSTION ENGINEERING (ABB-CE)
SUBJECT:
SUMMARY
OF MEETING HELD WITH ABB AND ABB-CE TO DISCUSS TOPICS RELATED TO THE THERMAL HYDRAULIC MODELING 0F THE PIUS DESIGN USING RIGEL AND TRAC CODES On November 3 through 11, 1992, Brent Boyack, Los Alamos National Laboratory; David Ebert, Office of Nuclear Regulatory Research (RES); and Dino Scaletti, visited ASEA Brown Boveri Offices in Vasteras, Sweden, to discuss issues related to thermal hydraulic modeling of the PIUS design. The intent of this meeting was to help the staff gain insights relative to its attempts to accurately reflect the PIUS design in its TRAC model. ABB Atom presented their RIGEL model and the staff presented their work on the TRAC simulation of PIUS. Also discussed were severe accident questions that had been developed by ORNL under contract to RES.
Enclosures 1 and 2 are meeting summaries provided by David Ebert and Brent Boyack, respectively. contains the non-proprietary presentation material used during the meetings by ABB; the information considered proprietary by ABB is provided under separate cover and is identified as.
The ABB presentation materials were transmitted by letter from C.B. Brinkman to Dino Scaletti dated January 25, 1993.
As part of these meetings the staff was able to observe the MAGNE loop in operation. HAGNE is only intended as a proof of principle facility.
It operates at atmospheric pressure, reduced temperatures, and is not built to scale. The staff was also able to observe the ATLE test facility; the facility that was used to bench mark the RIGEL code used by ABB Atom to analyze the PIUS design. ATLE is presently being modified to run further tests of the PIUS design.
Further tests will include design responses to LOCAs and step changes in reactor coolant flow.
On November 11, 1992, D. Scaletti visited Forsmark 3 Nuclear Power Plant and the Swedish Final Repository for Radioactive Waste (SFR) located at the Forsmark site.
Forsmark 3 is one of only four Swedish boiling-water reactor plants not to be impacted by the sump debris problem that occurred at Barseback. The other 3 are Forsmark I and 2 and Oskarshamn 3; all internal pump plants.
Forsmark 3 and Oskarshamn 3 are the two newest designs to be constructed in Sweden. SFR is a final repository for low-and medium-level radioactive waste from Swedish industry. The repository is located about I km offshore, 50 meters below the Baltic Seabed in excavated rock.
C$
dOh66 REiliRu i0 REGl.ATORY CBHAL RES r
/
b 9306240451 930503
" L PROJ NN 6
PDR 1
b
ABB-CE May 3, 1993 l
The meetings were very informative and will benefit the' staff in the refinement of TRAC model for PIUS. The meeting attendees are identified in.
OriginalSigned By:
1 Dino C. Scaletti, Senior Project Manager Advanced Reactors Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
Enclosures:
1.
Meeting Summary, RES 2.
Meeting Summary, LANL 3.
Presentation Material (Non-Proprietary) 4.
Presentation Material (Proprietary) 5.
List of Attendeos cc w/ enclosures 1, 2, 3, 5:
See next page
- See previous concurrence LA:ADAR P
Distribution:
(w/o Encl. 4)
PShea*
Central File -
4/7/93~
/93 PDR TEMurley DCScaletti TilCox'H+ GAR SC:PDAL*.
D:PDAR:ADA FJMiraglia PShea
@CPiersoni DMCrutchfield-ACRS (10) 57,3 /93 b f/3 /93 RCPierson OGC THCox EJordan EDThrom PDAR R/F DEbert, RES PIUS R/F
.0FFICIAL RECORD COPY Document Name:
SUMRY11.3
ABB-CE May 3, 1993 PIUS Project No. 680 cc: Regis Matzte, Director 9354-0401 Ulf Lindelow, Section Chief Advanced Water Reactor Projects PWR Core Design, Fuel Division ABB Combustion Engineering ABB Atom, ABB Nuclear Power S-721 63 Vasteras 1000 Prospect Hill Road Sweden Windsor, Connecticut 06095-0500 John F. Carew Mark Crump, Manager 9341-0407 Building 475 B Reactor Engineering-Brookhaven National Laboratory ABB Combustion Engineering Upton, New York 11973-5000 Nuclear Power 1000 Prospect Hill Road Gregory J. Van Tuyle Windsor, Connecticut 06095-0500 Building 475 B Brookhaven National Laboratory Chuck Molnar 9377-0407 Upton, New York 11973-5000 Nuclear Systems Licensing ABB Combustion Engineering Johann Lindner, Vice President Nuclear Power Technology and Engineering 1000 Prospect Hill Road ABB Atom, Inc.
Windsor, Connecticut 06095-0500 200 Great Pond Drive Windsor, Connecticut 06095 Lars Nilsson, Technical Manager PIUS Reactor Division Ernie H. Kennedy, Manager ABB Atom AB Nuclear Systems Licensing S-721 63 Vasteras ABB Combustion Engineering Sweden Nuclear Power 1000 Prospect Hill Road Harold D. Thornburg P.O. Box 500 ABB Atom, Inc.
Windsor, Connecticut 06095-0500 901 South Warfield Drive Mt. Airy, Maryland 21771 Daniel F. Giessing, Director Office of LWR Safety and Technology Mail Stop NE-42 U.S. Department of Energy Washington, DC 20585 Steve Goldberg, Budget Examiner Office of Management and Budget 725 17th Street, NW Washington, DC 20503