Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038A351 +
- ML17262A536 +
- ML17262A538 +
- ML17329A039 +
- ML17305B520 +
- ML18033B686 +
- ML20083E302 +
- ML20082K821 +
- ML20079C035 +
- ML20077B467 +
- ML20077A495 +
- ML20077A309 +
- ML20073M057 +
- ML20073J583 +
- ML20073J275 +
- ML20073H777 +
- ML20073H356 +
- DCL-91-113, Responds to NRC Re Violations Noted in Insp Rept 50-275/91-03.Corrective Actions:Watchperson Removed from Compensatory Measure Responsibilities & Replaced W/Another Watchperson +
- JAFP-91-0268, Responds to NRC Re Violations Noted in Insp Rept 50-333/91-04 on 910128-0201.Corrective Actions:Perform Fatigue Evaluation & Revise Procedure (MCM-4) +
- 0CAN059101, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/91-06 & 50-368/91-06 on 910225-0315.Corrective Actions:Qc Hold Placed on Stainless Steel Piping in Warehouse +
- JPN-91-020, Advises That Facility Long Term Pipe Support Insp & Evaluation Program Completed During 1990 Refueling Outage. Program Goal of Ensuring That Pipe Supports Comply W/ Applicable Installation Criteria Met +
- ELV-02711, Application for Amends to Licenses NPF-68 & NPF-81 Revising TS 3.6.3 by Allowing Those Valves Associated W/Containment Hydrogen Monitors to Be Opened on Intermittent Basis Under Administrative Control +
- HL-1588, Provides Supplemental Response to Station Blackout for Each Issue Identified in SER & 900327.Util Intends to Implement Mods & Procedure Changes within 2 Yrs Following Receipt of Satisfactory SER +
- ML20057B221 +
- ML20266F883 +
- ML20266F904 +
- ML20266F878 +
- ML20266E144 +
- ML20262F816 +
- ML20262F713 +
- 05000368/LER-1991-010, :on 910407,containment Purge Isolation Valve Declared Inoperable Due Excessive Leakage.Caused by Inadequate Design Info from Valve Mfg.Valve Will Be Replaced or Rotated,Per Evaluation of Feasibility +
- 05000382/LER-1991-004-01, :on 910404,acceptance Criteria for TS Surveillance OP-903-099, Spent Fuel Handling Machine Operability Not Completed within 72 H.Caused by Inadequate Attention to Details.Individuals Counseled +
- 05000277/LER-1991-008-01, :on 910407,Tech Spec Violation Due to Failure to Perform Reactor Coolant Temp Logging.Caused by Failure to Follow Procedures.Shift Teams Reviewed & Involved Shift Team Discussed Event in Detail +
- 05000327/LER-1991-006-01, :on 910403,discovered That Seven Sprinkler Heads in Unit 1 Reactor Bldg Annulus Had Not Been Inspected. Caused by Failure to Update Procedures in Timely Manner. Fire Watches Established +
- ML20024H131 +
- ML20035A900 +
- ML20024H041 +
- ML18095A912 +
- 05000400/LER-1991-008-01, :on 910403,common-cause Failures Affecting Trains of High Head Safety Injection Identified.Caused by Water Hammer That Apparently Occurred Because of Air Void. Relief Valves Being Rebuilt & Retested +
- ML18009A910 +
- ML17262A478 +
- ML18009A883 +
- ML20044C306 +
- ML20024H134 +
- ML20199B144 +
- 05000341/LER-1990-013, :on 901228,determined That Need for Isolation of Sampling Line in Event of LOCA Not Identified in Procedure & Primary Containment Integrity Could Be Compromised.New Sample Taps Added +
- 05000282/LER-1989-010, :on 890721,reactor Trip Occurred Resulting from Loss of One Reactor Coolant Pump.Caused by Personnel Error. Problem Investigated.Bus Doors 4160V Labeled & Potential Fuse Drawer Fronts Also Labeled +