Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038A739 +
- ML17056C329 +
- ML17056C328 +
- ML17331A117 +
- Press Release-93-037, the Nuclear Regulatory Commission Has Received the Three Attached letter-type Reports from Its Independent Advisory Committee on Reactor Safeguards. the Reports Provide Comments on Human Performance in Nuclear Power Pla +
- ML18058B744 +
- ML18058B743 +
- ML18058B742 +
- ML18058B740 +
- ML18153D286 +
- ML18153D284 +
- ML20059F475 +
- ML20262E026 +
- IR 05000290/2038001 +
- RBG-38284, Responds to Violations Noted in Insp Rept 50-458/93-02. Corrective Actions:Security Mgt Will Ensure That Drills Are Conducted in Accordance W/Established Guidance & Procedures +
- LIC-93-0094, Forwards Scope & Objectives for Plant 1993 EP Exercise on 930629.Informs That Complete Scenario Package Will Be Submitted to NRC & FEMA by 930430 +
- 05000293/LER-1993-002, :on 930225,RCIC Sys Declared Inoperable During Surveillance Testing.Caused by Galling of Valves Stem & Bonnet Chamber.Valve Stem & Bonnet Chamber Will Be Replaced & Parts Will Be Purchased Following Design +
- IR 05000338/1993013 +
- 05000341/LER-1993-005, :on 930225,burned-out Indicating Lamp Shattered During Replacement,Due to Inappropriate Selected Fuse Coordination.Design of Safety Related Control Power Circuits Will Be Reviewed for Proper Fuse Coordination +
- 05000455/LER-1993-002-08, :on 930311,determines Unit 1 Essential Svc Water Pump Availability to Unit 2 Surveillance Not Complete. Caused by Failure to Complete Requirements of Shift/Daily Operating Surveillance.Surveillance Revised +
- BECO-93-042, Forwards TS Section 3/4.2.H, Drywell Temperature. Bases Adds Info Concerning Term Nominal Instrument Elevation +
- IR 05000313/1993003 +
- 05000298/LER-1993-002, :on 930202,NRC Inspector Discovered That Fire Watchman Unaware That Thermo-Lag Fire in Assigned Area Declared Inoperable on 920625,during Interview.Personnel re-familiarized w/Thermo-Lag Areas of Concern +
- B14414, Forwards SW & ESW Sys Insp/Replacement Strategy for Unit 1. Mod to Sys Based on Ongoing Monitoring of Sys Parameters or Visual & Ultrasonic Insp of Components +
- IR 05000482/1993005 +
- 05000361/LER-1993-002, :on 930225,125 Vdc Battery Charger 2B001 & 2B002 Declared Inoperable.Caused by Incorrect 10CFR21 Evaluation.Original 10CFR21 Evaluation for 125 Vdc Charger Reactor Circuit Boards Will Be Revised +
- ML20035B724 +
- 05000445/LER-1993-003, :on 930226,spurious SIS Actuation from Train a Solid State Safeguards Sequencer Occurred.Caused by Failure of Instrument Used During Troubleshooting.Monitoring Device Removed & Sys Card Chassis Replaced +
- ELV-05346, Discusses 921105 Request to Change Fuel Assembly Description in Section 5.3.1 of TS for Vogtle Electric Generation Plant,Allowing Limited Substitution of Zirconium Alloy & Forwards Fuel Reconstitution Methodology +
- LD-93-057, Forwards Revisions to Chapters 2 & 3 of CESSAR-DC Sys 80+ SAR - Seismic/Structural Changes +
- IR 05000245/1993008 +
- ML20035A365 +
- ML20035C474 +
- ML20035B721 +
- ST-HL-AE-4387, Requests Temporary Waiver of Compliance from Provisions of TS 3/4.1.3.3, Position Indication Sys Shutdown. Requests Specifically States That Reactor Trip Breakers Will Be Allowed to Close Prior to Declaring DRP Sys Operable +
- ML20035B431 +
- ML20035B500 +
- ML20035E249 +
- ML20035B732 +
- ML20035B747 +
- ML20035D506 +
- ML20035B426 +
- U-602111, Requests Change to TS Bases to Provide Addl Guidance on Need to Obtain Samples for Isotopic Analysis Following Increases in Levels Indicated by Offgas Radiation Monitor,Per NRC Request +
- ML20035C028 +
- ML20035B171 +
- ML20035C031 +
- ML20035B373 +
- ML20036B034 +
- ML20035C267 +
- ML20035C280 +