ML20035B721
| ML20035B721 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 03/29/1993 |
| From: | Clayton H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Delgeorge L COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20035B722 | List: |
| References | |
| NUDOCS 9304050036 | |
| Download: ML20035B721 (4) | |
See also: IR 05000373/1993007
Text
h
K
'i
<y
'm Q'
!/.AR 2 9 1593
't/
\\,
.
Docket No. 50-373
Docket No.
50-374
Commonwealth Edison Company
ATIN: Mr. L. O. DelGeorge
'
Vice President, Nuclear Oversight
and Regulatory Services
Executive Towers West III
'
1400 Opus Place, Suite 300
Downers Grove, IL 60515
Dear Mr. DelGeorge:
This refers to the inspection conducted by D. Hills and C. Phillips of this
office, and by J. Roman of the Illinois Department of Nuclear Safety, on
February 8 through March 15, 1993. The inspection included a review of
authorized activities for your LaSalle County Station, Units 1 and 2,
facility. At the conclusion of the inspection, the findings were discussed
with those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
'
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
t
activities in progress.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice of Violation
(Notice). These violations are of concern as one indicated some continuing
inattention to detail problems regarding maintenance personnel and the other
reflected insufficient emphasis on certain radiation monitoring
instrumentation.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
4
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
Other activities were also identified to be in violation of NRC requirements.
,
However, as described in the enclosed inspection report, this violation will
not be subject to enforcement action because the criteria specified in
Section VII.B of the " General Statement of Policy and Procedures for NRC
_j
Enforcement Actions," (Enforcement Policy,10 CFR Part 2, Appendix C (1993))
were satisfied.
j
[- }
{
9304050036 930329
ADOCK 05000373
O
/
i
t
.. )
ER : 9 993
~
Commonwealth Edison Company
2
-I
'l
i
'In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
l
this letter, the enclosures, and your response to this letter will be placed
i
in the NRC Public Document Room.
I
The responses directed by this letter and the accompanying Notice are not
-
su Ject to the clearance procedures of the Office of~ Management and Budget as
,
required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
.
Sincerely,
.
)
,
g afochl63 SGl*[*
H. B' rent Clayton, Chief
i
Reactor Projects Branch 1
!
Enclosures:
1.
!
2.
Inspection Reports
l
No.
50-373/93007(DRP);
{
No.
50-374/93007(DRP)
,
t
cc w/ enclosure:
-l
W. Murphy, Site Vice President
i
J. Lockwood, Regulatory Assurance
t
Supervisor
l
D. Farrar, Nuclear Regulatory
Services Manager
OC/LFDCB
,
Resident Inspectors LaSalle
i
Dresden, Quad Cities
-f
Richard Hubbard
.!
J. W. McCaffrey, Chief, Public
!
Utilities Division
Licensing Project Manager, NRR
,
Robert Newmann, Office of Public
Counsel
State Liaison Officer
Chairman, Illinois Commerce
[
Commission
bec:
PUBLIC
-
t
s
/+5
y/r
!
RIII
RIII
RHP
RIII g
fB}FI
9771b$1
14( for
/9j
sr
r
/
Snel
By'rgess
e e
Clayton
nmk
r
i je
3/>sf7
m)xrqS
siv
Wifb
Wr4/ts
ll=>
@ls
,
-
.
-
-
UNITED STATES
[p n co,*'c,,
NUCLEAR REGULATORY COMMISSION
REGION lil
[
)p7
h
799 ROOSEVELT ROAD
5
y e
GLEN ELLYN, ILLINOIS 60137-5927
f
o
%, . . . . . /
I$Ah . . $Q
Docket flo.
50-373
Docket No.
50-374
Commonwealth Edison Company
ATTN: Mr. L
0. DelGeorge
Vice President, Nuclear Oversight
and Regulatory Services
Executive Towers West III
1400 Opus Place, Suite 300
Downers Grove, IL 60515
Dear Mr DelGeorge:
This refers to the inspection conducted by D. Hills and C. Phillips of this
office, and by J. Roman of the Illinois Department of Nuclear Safety, on
The inspection included a review of
February 8 through March 15, 1993.
authorizcd activities for your LaSalle County Station, Units 1 and
facility.
with those members of your staff identified in the enclosed report.
Within
Areas examined during the inspection are identified in the report.
these areas, the irispection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
During this inspection, certain of your activities appeared to be in violatice
of NRC requirements, as specified in the enclosed Notice of Violation
These violatiens are of concern as one indicated some continuing
inattention to detail problems regarding maintenance personnel and the other
(Notice).
reflected insufficient emphasis on certain radiation monitoring
instruwntation.
You are required to respond to this letter and should follow the instructior:
In your
specified in the enclosed Notice when preparing your response. re
After reviewing your response to tM s
actions you plan to prevent recurrence.
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action
necessary to ensure to pliance with NRC regulatory requirements.
Other activities were also identified to be in violation of NRC requirement:
However, as described in the enclosed inspection report, this violation wil-
not be subject to enforcement action because the criteria specified in
Section Vll.B of the " General Statement of Policy and Procedures for NRC
Enforcement Actions," (Enforcement Policy,10 CFR Part 2, Appendix C (1993))
were satisfied.
L
.
.
._
_ _
,
t
.
-
.
.
ilAR " 0 1993
t
'!
. Commonwealth Edison Company
2
!
!
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
'
this letter, the enclosures, and your response to this letter will be placed
in the IJRC Public Document Room.
The responses directed by thic letter and the accompanying tiotice are not
subject to the clearance procedures of the Office of Managem.ent and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-51).
'
We will gladly discuss any questions you have concerning this inspection.
i
'
Sincerely,
M
H. Brent Clayton, Chief
i
Reactor-Projects Branch 1
l
Enclosures:
!
!
1.
flotice of Violation
2.
Inspecticn Reports
-
TJo .
50-373/93007(DRP);
fJo.
50-374/93007(DRP)
,
cc w/ enclosure:
.
,
'
W. Murphy, Site Vice President
J. Lockwood, Regulatory Assurance
Supervisor
D. Farrar, tJutlear Regulatory
'
Services Manager
DC/LFDCB
Resident Inspectors LaSalle
Dresden, Quad Cities
Richard Hubbard
J. W. McCaffrey, Chief, Public
!
i
Utilities Division
Licensing Project Manager,f4RR
Robert IJewmann, Office of Public
Counsel
t
State Liaison Officer
i
Chairman. Illinois Commerce
Commission
l
\\
l
l
J
l
1.
-
t