ML20035C280

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-245/93-09,50-336/93-05 & 50-423/93-06 on 930308-12.Notes That Licensee Maintained Effective Programs for Radioactive Liquid & Gaseous Effluent Control, W/Capabilities to Protect Public Health & Safety
ML20035C280
Person / Time
Site: Millstone  
Issue date: 03/29/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20035C281 List:
References
NUDOCS 9304070002
Download: ML20035C280 (3)


See also: IR 05000245/1993009

Text

'

t

- 1

. ~ . be

' ()

I-

M

i

UAR 2 9 153

.

.,

i

.I

Docket Nos. 50-245,50-336, and 50-423

l

t

1

Mr. John F. Opeka -

Executive Vice President - Nuclear

j

Northeast Nuclear Energy Company

!

P. O. Box 270

l

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

,

!

Subject- Combined Inspection Nos. 50-245/93-09, 50-336/93-05, and 50-423/93-06

.j

This letter refers to the safety inspection conducted by Dr. Jason C.' Jang of this office on

March 8-12,1993, of activities authorized by NRC License Nos. DPR-21, DPR-65, and

NPF-49 at the Millstone Nuclear Generating Station, Units 1,2, and 3, Waterford,

Connecticut, and ta the discussion of our findings held by Dr. Jang with Mr. S. Scace and .

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection. involving your radioactive effluent control programs,

are important to public health and safety and are discussed in the enclosed report. Within

these areas, the inspection consisted of selective examinations of procedures and -

representative records, interviews with personnel, and observation by the inspector.

Within the scope of this inspection, we noted that you maintained effective pr' grams for

o

radioactive liquid and gaseous effluent control, with capabilities to protect the public health

1

and safety and the environment. We noted further that the responsible individuals in the

Chemistry Department had excellent knowledge to implement th'e above programs. No safety

concerns or violations of regulatory requirements were observed in your programs.

No reply to this letter is required. Your cooperation with us in this matter is appreciated.

1

Sincerely,

Original Signed By::

j

JameMo nerN!ef:

Facilities Radiological Safety

and Safeguards Branch L

~ Division of Radiation Safety;

l

and Safeguards

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-245/93-09; 50-336/93-05

1

and 50-423/93-06

1

!'

9304070002 930329

PDR

ADOCK.05000245

5P .

I

i

-

-

HICIAL RECORD COPY

t:, L

!-

<i

5-

Pon

I

-

4 .

i

,

,

,-.

, , . . -

.

..+

.

.

g

.

//.G 2 9 G33

Nonheast Nuclear Energy Company

2

cc w/ encl:

W. D. Romberg, Vice President - Nuclear, Operations Services

S. E. Scace, Vice President, Millstone Station

H. F. Haynes, Nuclear Unit Director

J. S. Keenan, Nuclear Unit Director

'

F. R. Dacimo, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licensing

G. H. Bouchard, Director of Quality Services

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut SLO

!

l

!

l

1

I

\\

0FFICIAL RECORD COPY

I

a

. -

.

.

. .

.

,

,

.

i

o

Ufa 2 91333

Northeast Nuclear Energy Company

3

bec w/ encl:

Region I Docket Room (with concurrences)

J. Joyner, DRSS

R. Blough, DRP

L. Doerflein, DRP

W. Raymond, SRI, Haddam Neck

P. Swetland, SRI, Millstone

V. McCme, OEDO

D. Jaffe, PM, NRR

G. Vissing, PM, NRR

V. Rooney, PM, NRR

J. Anderson, NRR

DRS/EB SALP Coordinator

R. Barkley, DRP

DRSS:RI

DRSS:RI

DRSS:RI

JANG 3/ 7If93

MILLER 3/2f/93

JOYNER 3/29 /93

f

/

%.~74.d/Is

,i y

yv

a

j

,

!

h

!

0FFICK RECORD COPY