ML18038A739

From kanterella
Jump to navigation Jump to search
Clarifies Changes in 930218 Resubmittal of Application for Amend to License DPR-63,revising TS Sections 3.2.7/4.2.7, 3.2.7.1,3.3.3/4.3.3 & 3.3.4/4.3.4 Re App J Leak Rate Testing
ML18038A739
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/29/1993
From: Sylvia B
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17056C329 List:
References
NMP1L-0750, NMP1L-750, NUDOCS 9304060205
Download: ML18038A739 (4)


Text

NIAGARAMOHAWKPOWER CORPORATION/NINE MlLEPOINT PO. BOX63, LYCOMING,NY t3093/TELEPHONE (315) 349-2882 B. Ralph Sylvia Executive Vice President Nuclear March 29, 1993 NMP1L 0750 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 Re: Nine Mile Point Unit 1 Docket No. 50-220 DPR-63 Gentlemen:

On February 18,

1993, Niagara Mohawk resubmitted an Application for Amendment to the Nine Mile Point Unit 1 Operating License DPR-63.

This Application contained proposed revisions to Technical Specification Sections 3.2.7/4.2.7, 3.2.7.1, 3.3.3/4.3.3 and 3.3.4/4.3.4 regarding Appendix J leak rate testing.

As discussed with your Staff on March 22,

1993, a clarification is required to Section 4.3.3.c.(2)c.

These changes are as follows:

~acae 139 1.

A closed parenthesis was added after (a) on line 3.

This correctly identified the parenthetical phrase.

2.

3.

The word "and" between 4.3.3.b.(1) and 4.3.3.b.(2) on line 5

was changed to "or" to indicate that failure to meet any one of the acceptanc'e criteria constitutes a failure.

The periodic ret'est identified as (b) in line 7 was changed to correctly indicate section 4.3.3.c.(1).

Pacae 140 1.

Deleted the word "or" between 4.3.3.a.(3) and 4.3.3.b.(1) on line 4.

Add "and 4.3.3.b.(2)."

This ensures that all acceptance criteria must be met.

Attached are revised pages 139 and 140 which provide the clarifications and replace the pages contained in our February 18, 1993 submittal.

9304060205

'3I30329 PDR"= ADOCK 05000220 PDR y0 I

)

gR l ~)i:l"

Page 2

We trust this information is responsive to your needs.

Very truly yours, MGM/pr Attachments 003721GG B. Ralp Sylvia Exec. Vice President-Nuclear XC:

Regional Administrator, Region I Mr.

W. L. Schmidt, Senior Resident Inspector Mr. R. A. Capra, Director, Project Directorate I-l, NRR Mr. D.

S. Brinkman, Senior Project Manager, NRR Records Management Ms.

Donna Ross Division of Policy Analysis and Planning New York State Energy Office Agency Building 2 Empire State Plaza

Albany, NY 12223