Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0496-34, Confirms Notification Made Via ENS on 960419 Retracting Notification Made on 960322 for Reportable Event 30152 Re Suspected Design Basis Issue Involving Charcoal Filtration Efficiency & Air in-leakage (Dose) for CREVS + (April 26, 1996)
- TAC:M87175 + (April 26, 1996)
- JPN-96-019, Informs of Extension of Second 10-yr ISI & IST Intervals by Period of Nine Months.Extension Being Applied to Third Period of Second Interval Currently Scheduled to End Sept 1996.Addl Nine Months Extends Interval Through June 1997 + (April 26, 1996)
- 3F0496-30, Special Rept 96-02:on 960313,fire Detection Zones Required by Fire Protection Plan Out of Svc for Greater than Fourteen Days.Hourly Fire Watch Established + (April 26, 1996)
- NG-96-0978, Forwards DAEC 1995 Annual Radiological Environ Operating Rept + (April 26, 1996)
- BSEP-96-0157, Responds to GL 95-07, Pressure Locking & Thermal Binding of SR Power Operated Gate Valves + (April 26, 1996)
- PY-CEI-NRR-2046, Withdraws 930618 LAR Involving Rev to TS Figure 5.1.1-1 & Various Refs to Figure Throughout Current Ts,Due to Anticipated Implementation of Amend 69 (Improved TS) Changes When Implemented Will Obviate Need to Process Subj LAR + (April 26, 1996)
- PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process + (April 26, 1996)
- LD-96-014, Part 21 Rept Re Response to NRC Notice on Nonconformance. Licensee Will Direct Cognizant Personnel Reviewing Deviation or Failure to Comply for Basic Components Delivered to Customers,To Document Whether/Not Facts Indicate Evaluation + (April 26, 1996)
- ML20266J791 + (April 26, 1996)
- ML20265D445 + (April 26, 1996)
- ML20265D515 + (April 26, 1996)
- ML20266J793 + (April 26, 1996)
- ML20266J789 + (April 26, 1996)
- 05000373/LER-1996-003-04, :on 960327,scram Signal Received Causing Single Control rod,50-43 to Fully Insert.Caused by Spurious Spike of H IR Neutron Monitor Channel & Degraded Signal Cable Shield & Connector.Scram Reset & H IRM Bypassed + (April 26, 1996)
- 05000259/LER-1996-002-02, :on 960328,EDG auto-started Due to Undervoltage Condition as Result of Personnel Error.Functional Tests on Breakers Associated W/Shutdown Bus Stopped & EDG Shutdown & Placed in Standby Readiness + (April 26, 1996)
- 05000219/LER-1996-002, :on 960329,discovered Low Voltage Alarm Setpoint Changed to Value Beyond TS Limit.Caused by Improper Work Practice.Battery Charger Surveillance Procedure Revised & Low Voltage Sensing Relays Adjusted + (April 26, 1996)
- 05000395/LER-1996-003, :on 960206,identified Discrepancy in Test Methodologies Between TS Required Testing & Actual Testing Performed.Caused by Recognize Discrepancy in Test Methodologies.Emergency TS Change Requested + (April 26, 1996)
- 05000423/LER-1996-006-02, :on 960330,plant Shutdown Required by TS for AFW Containment Isolation Valves Declared Inoperable.Caused by Opened Valves Outside Containment.Unit Was Shutdown in Orderly Manner + (April 26, 1996)
- 05000324/LER-1996-001, :on 960202,planned Reactor Manual Scram Inserted to Support Start of Unit 2 B212R1 Refueling Outage. Caused by Accelerated Aging.New Assembilies Replaced & Increased Frequency of Monitoring Performance + (April 26, 1996)
- 05000302/LER-1996-009, :on 960327,failure to re-attach Instrument Tubing to Seismic Supports After Mod Leads to Operation Outside Design Basis Occurred.Caused by Personnel Error. Instrument Tubing Properly Supported + (April 26, 1996)
- NRC-96-0029, EECW Being in Unanalyzed Condition & Subsequent TS Required Shutdown.Util Determined That Sys Design Such That Long Term Emergency Equipment Component Cooling Could Not Be Assured for All DBA Scenarios + (April 26, 1996)
- ML20107N109 + (April 26, 1996)
- 05000260/LER-1996-003-02, :on 960328,determined That Fuel Movement Performed W/Inoperable Refueling Interlock.Caused by Misinterpretation of TS Requirements.Fuel Movement Activities Discontinued + (April 26, 1996)
- HNP-96-076, Forwards Amend 47 to FSAR for Shnpp,Incorporating Addl Engineering Evaluations as Indicated in 960412 Submittal of Amend 46 to Fsar.Info in Amend 47 Update Completes Amend Scope as Defined in 960412 Submittal of Amend 46 + (April 26, 1996)
- L-96-113, Submits Planned Refueling Outage SG Insp Activities for Unit 1 + (April 26, 1996)
- ML17264A461 + (April 26, 1996)
- ML18151A678 + (April 26, 1996)
- ML20108B729 + (April 28, 1996)
- ML20108A380 + (April 28, 1996)
- ML20108A367 + (April 28, 1996)
- ML20265D215 + (April 28, 1996)
- ML20265A768 + (April 28, 1996)
- ML20265A419 + (April 28, 1996)
- ML17059B123 + (April 29, 1996)
- ML17059B122 + (April 29, 1996)
- ML17264A554 + (April 29, 1996)
- ML17264A555 + (April 29, 1996)
- ML18065A703 + (April 29, 1996)
- ML18065A680 + (April 29, 1996)
- ML18065A676 + (December 31, 1995)
- ML18065A675 + (April 29, 1996)
- ML20111A642 + (April 29, 1996)
- ML20108F235 + (April 29, 1996)
- ML20108E779 + (April 29, 1996)
- ML20108E216 + (April 29, 1996)
- ML20108D153 + (April 29, 1996)
- ML20108D146 + (April 29, 1996)
- ML20108D136 + (April 29, 1996)
- ML20108D093 + (April 29, 1996)
- ML20108D098 + (April 29, 1996)
- ML20108D013 + (April 29, 1996)
- ML20108C960 + (April 29, 1996)
- ML20108C404 + (April 29, 1996)
- ML20108B858 + (April 29, 1996)
- ML20108B388 + (April 29, 1996)