Commonwealth Ednon Company liraidwood Generaung station i

Route =1, llox N i

/'

fira(culle, IL 60 607%19 Tel H I On W.!801 April 29.1996 BW/96-053 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Annual Environmental Operation report for Facility License NPT-72 & 77 Braidwood Nuclear Power Station Docket Nos. 50-456 and 50-457 Enclosed is Braidwood Station's Annual Environmental Operating Report as required by the Technical Specification, Appendix B, Section 5.4 for Facility License NPF-72 and NPR-77.

The period of the report is from January 1,1995 to December 31,1995. The report was reviewed against the objectives of the Environmental Protection Plan as stated in Section 1 of Appendix B to Braidwood's Operating License and it has been determined that these objectives are being met.

'the report is contained in the following Attachments:

Attachment A -

A list of all changes in Station design or operations, tests, and experiments as required by Appendix B, Section 3.1.

Attachment B -

A list of all non routine reports as required by Appendix B, Section 5.4.2.

Attachment C -

A list of nonempliances to the Environmental Protection Plan and the i

corrective actions.

If you or your staff have any question or comments concerning this report, please refer them to Terrence Simpkin, Braidwood Regulatory Assurance Supervisor, at (815) 458-2801, extension 2980.

Yours Truly, J. Tulon Station Manager Braidwood Nuclear Station TJT/JMUdm 9605130420 960429 PDR ADOCK 05000456 R

PDR Attachments cc:

H.J. Miller, NRC Regional Administrator, Region III R.R. Assa, Project Manager, NRR C.J. Phillips, Senior Resident inspector I /

1 A linicoin CompJn)

4

.e f ATTACHMENT A List of changes in Station design, operation, tests and experiments made in accordance with Section 3.1 which involved a potentially significant unreviewed environmental question.

None - 1995 i

i I

i l

-1

1 t*

\\

ATTACIIMENT B List of non-routine reports submitted in accordance with Subsections 5.4.2.

None - 1995 l

l I

l l

l

.e n 1

ATTACilMENT C List of Environmental Protection Plan non<ompliances and corrective actions.

None - 1995 i