Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228B437 +
- ML17228B436 +
- ML17353A616 +
- ML17353A617 +
- ML17353A615 +
- ML18038B649 +
- ML18038B648 +
- ML18153A539 +
- ML18153A538 +
- ML18153A537 +
- ML20101N307 +
- ML20101K970 +
- ML20101K806 +
- ML20101J051 +
- ML20101H251 +
- ML20101G552 +
- ML20101G549 +
- ML20101G464 +
- ML20101F887 +
- ML20101F797 +
- ML20101F789 +
- ML20101F590 +
- ML20101F535 +
- ML20101F512 +
- ML20101F286 +
- ML20101F175 +
- ML20107B942 +
- ML20117J675 +
- ML20117F794 +
- ML20107L987 +
- ML20138J362 +
- ML20138H542 +
- ML20129J437 +
- ML20266A497 +
- LIC-96-0042, Forwards Public & Central Files Versions of Revised Epips, Including Rev 13 to EPIP-RR-17A & Rev 10 to EPIP-TSC-8. Central Files Version of Revised EPIPs Withheld +
- NSD-NRC-96-4669, Provides Justification for AP600 Separation Criteria to Reg Guide 1.75 +
- 3F0396-19, Application for Amend to License DPR-72,consisting of Change Request 203,Rev 2,allowing Restart from Current Refueling Outage +
- JAFP-96-0127, Informs That on 960221,util Identified Urine Blind Test Specimen Positive Result That Had Been Incorrectly Reported as Negative.Util Begun Contract Prerequisites to Convert to Different Health & Human Svcs Certified Testing Lab +
- HL-5131, Advises That Util Has Implemented Guidance Re Testing of Both SSPV & ARI Sys.Util Intends to Become Member of BWROG Committee Addressing Viton SSPV Issue +
- ST-HL-AE-5316, Responds to NRC Re Violation Noted in Insp Rept 50-499/96-12.Corrective Actions:Lessons Learned from Occurrence Issued to Licensed Operators & Understanding of Policies & Practices Will Be Strengthened Through Training +
- ML20134C546 +
- ML20134C541 +
- ML20265E301 +
- ML20265E233 +
- ML20265E242 +
- ML20141J036 +
- ML20101L492 +
- 05000352/LER-1996-007, :on 960220,trip of FPC Pumps Resulted in Loss of Core Circulaton & Decay Heat Removal.Caused by Insufficient Procedural Guidance.C/A:Assessment Performed +
- 05000298/LER-1995-023, :on 951030,loss of Configuration Control by Valve Vendor Occurred.Caused by MOV Program Ownership & Weaknesses in Programmatic Controls.Vendors for MOVs Included in GL 89-10 Program Audited +
- 05000333/LER-1996-003-01, :on 960222,plant Shutdown Due to Degraded Control Rod Scram Times & Manual Scram.Caused by Leak in Main Turbine EHC Sys.C/A:Bypass Valves Replaced +