Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-5145, Forwards Endorsements 17,15,49,50,51,52,53,54 & 13 to Nelia Policies N-0113,N-0116,NF-0307,NF-0307,NF-0307,NF-0307, NF-0307,NF-0307 & NW-0199,respectively & Endorsements 19 & 18 to Maelu Policies M-0113 & M-0116,respectively + (August 18, 1995)
- NRC-95-4534, Forwards Proprietary WCAP-14442, AP600 Core Makeup Tank Level Instrument Test Data & Evaluation Rept. Nonproprietary Version of Rept Will Be Submitted within 90 Days.Proprietary Rept Withheld Per 10CFR2.790 + (August 18, 1995)
- TAC:M89739 + (August 18, 1995)
- JAFP-95-0376, Forwards Response to NRC Re Violations Noted in Insp Rept 50-333/95-11-01 on 950514-0624.Corrective Actions: Performed Critique of Unanticipated Water Sprinkler Discharge Event + (August 18, 1995)
- HL-5013, Responds to NRC Re Weaknesses Noted in Insp Repts 50-321/95-12 & 50-366/95-12.Corrective Actions:Revised Applicable Administrative Guideline Covering Quality Concerns Program on 950814 + (August 18, 1995)
- HL-5016, Informs That Gpc in Total Agreement W/Nei Comments on Proposed GL, Testing of Safety-Related Logic Circuits Which Are to Be Provided to Nrc,Per Request for Comments in (60FR27141 Dtd 950522) + (August 18, 1995)
- 05000271/LER-1995-015, :on 950720,determined That TS SR 4.7.A.4 Exceeded for Valve SB-16-19-A (AC-8) Due to Inadequate Procedure.Flange for Valve AC-8 Tightened & Leakage Path Eliminated + (August 18, 1995)
- 05000353/LER-1995-007, :on 950720,inadvertent Grounding of Keyswitch During Replacement Resulted in Actuations of Units Primary Containment & Rv Isolatioin Control Sys Due to Unclear Mgt Expectations.Conducted Mgt Meeting W/Maint Division + (August 18, 1995)
- NRC-95-4532, Forwards Proposed Draft/Markup of SSAR Section 18.9.8 + (August 18, 1995)
- ML20087K099 + (August 18, 1995)
- 05000368/LER-1995-001-03, :on 950719,human Error in Design of Plant Mod Created Potential for Failure of One DC Electrical Bus to Have Caused Failure of Opposite Train of Efw.Conducted Evaluation of Potential Generic Implications of Condition + (August 18, 1995)
- 05000352/LER-1995-003-01, :on 950719,Unit Maximum Power Level of 100% Was Exceeded by 3.4% Due to Unanticipated Response of 1B Reactor Recirculation Pump Following Decrease Speed Signal. Established Administrative Limit of 100% Core Flow + (August 18, 1995)
- 2CAN089502, Unanticipated Effect of Analyzed Failure of DC Electrical Bus Upon Train of EFW Sys Containing AC motor-driven Pump + (August 18, 1995)
- 05000424/LER-1995-003-02, :on 950724,automatic Containment Ventilation Isolation Actuation Function Inactivated Due to Cognitive Personnel Error on Part of Gpc Unit Shift Supervisor (Uss) & Shift Superintendent (Ss).Uss & SS Counseled + (August 18, 1995)
- 05000424/LER-1995-002-03, :on 950723,dual Unit RT Occurred Due to Lightning Strikes.Evaluation of Rod Control Sys Susceptibility to Voltage Surges & Proposed Corrective Actions Expected by 951001 + (August 18, 1995)
- ML20087K940 + (August 18, 1995)
- ML20087K944 + (August 18, 1995)
- ML20091K382 + (August 18, 1995)
- GO2-95-156, Special Rept:On 950712,loose Part Detection Sys Channel 4 Failed Due to Electrical Noise During Daily Check.Channel 4 Will Remain Inoperable Until Next Forced or Scheduled Outage When Primary Containment de-inerted for Other Work + (August 18, 1995)
- GO2-95-157, Forwards Response to NRC Re Violation Noted in Insp Rept 50-397/95-19.Corrective Actions:Procedure PPM 1.3.1 Revised to Include Shift & Relief Turnover Practices,Including Checklists + (August 18, 1995)
- ML16222A894 + (August 18, 1995)
- IR 05000269/1995017 + (August 18, 1995)
- ML16154A828 + (August 18, 1995)
- PNO-II-95-048C, on 950818,hurricane Felix Is Maintaining Slow Drifting Movement Toward East Northeast.Currently No Hurricane Watches or Warnings Established Along VA Coast + (August 18, 1995)
- ML13326A203 + (August 18, 1995)
- ML20141J096 + (August 19, 1995)
- ML20087K636 + (August 20, 1995)
- ML18101A909 + (August 21, 1995)
- ML18064A881 + (August 21, 1995)
- ML18064A880 + (August 21, 1995)
- ML12261A696 + (August 21, 1995)
- ML20087M000 + (August 21, 1995)
- ML20087L910 + (August 21, 1995)
- ML20087L341 + (August 21, 1995)
- ML20087L298 + (August 21, 1995)
- ML20087L280 + (August 21, 1995)
- ML20092B651 + (August 21, 1995)
- ML20091P246 + (August 21, 1995)
- ML20091L314 + (August 21, 1995)
- ML20091L259 + (August 21, 1995)
- ML20091L175 + (August 21, 1995)
- ML20091L162 + (August 21, 1995)
- ML20091K844 + (August 21, 1995)
- ML20091K820 + (August 21, 1995)
- ML20091K437 + (August 21, 1995)
- ML20091K424 + (August 21, 1995)
- ML20091K401 + (August 21, 1995)
- LIC-95-0162, Forwards Public & Central Files Versions of Revised Epips, Including FC-EPF Forms Index Issued 950808,Rev 4 to FC-EPF-10,FC-EPF Forms Index Issued 950810,Rev 2 to FC-EPF-2 & Rev 5 to FC-EPF-8.Central Files Version Withheld + (August 21, 1995)
- ST-HL-AE-5140, Forwards Summary of Simulator Upgrade Project Performance Testing Results + (August 21, 1995)
- LIC-95-0161, Forwards Fort Calhoun Station Performance Indicators Jul 1995 + (August 21, 1995)
- BSEP-95-0379, Requests Approval to Use Code Case N-416-1 as Alternative to ASME B&PV Code Hydrostatic Testing Requirements for Welded Repairs & Installation of Replacement Items by Welding + (August 21, 1995)