Text

.

?

TheLight c o m p a n y South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, Texas 77483 flouston Lighting & Power August 21, 1995 ST-HL-AE-5140 File No.: G25 10CFR55.45 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498; STN 50-499 Simulator Uperade Project Performance Testine Results

Reference:

Correspondence from Mr. J. F. Groth, Houston Lighting & Power to the Nuclear Regulatory Commission Document Control Desk dated March 1,1995 (ST-HL-AE-5008)

Pursuant to the referenced letter, a report of the test results for the simulator upgrade project performance testing completed in July,1995 is attached.

If you should have any questions, please contact Mr. J. T. Carlin at (512) 972-7949 or me at (512) 972-8664.

3 C

. F.

11 Vice President, Nuclear Generation KJT/ps

Attachment:

South Texas Project, Units 1 and 2 Simulator Upgrade Project Performance Test Results ES0000 gd MISC-95\\$140-215.003 Project Manaaer on Behalf of the Participants in the South Texas Project 9508290029 950821

't PDR ADOCK 05000498 P

PDR

Houston Lighting & Power Company ST-HL-AE-5140 South Texas Project Electric Generating Station File No.: G25 Page 2 C:

Leonard J. Callan'

. Rufus S. Scott Regional Administrator, Region IV Associate General Correl

~ U. S. Nuclear Regulatory Commission Houston Lighting Power C:mpany.

611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 Arlington, TX - 76011-8064 Houston, TX 77208 Thomas W. Alexion Institute of Nuclear Power Project Manager Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 13H15 Atlanta, GA 30339-5957 David P. Loveless Dr. Joseph M. Hendrie Sr. Resident Inspector 50 Bellport Lane c/o U. S. Nuclear Regulatory Comm.

Bellport, NY 11713 P. O. Box 910 l

Bay City, TX 77404-0910 Richard A. Ratliff l

Bureau of Radiation Control l

J. R. Newman, Esquire Texas Department of Health Morgan,' Lewis & Bockius 1100 West 49th Street 1800 M Street, N.W.

Austin, TX 78756-3189 l

Washington, DC 20036-5869

[

U. E Nuclear Regulatory Comm.

i K. J. Fiedler/M. T. Hardt Attn: Jocument Control Desk

(

City Public Service Washington, D. C. 20555-0001 P. O. Box 1771 San Antonio,fX 78296 J. C. Lanier/M. B. Lee J. R. Egan, Esquire City of Austin Egan & Associates, P.C.

Electric Utility Department 2300 N Strew, N.W.

721 Barton Springs Road Washington, D.C. 20037 Austin, TX - 78704 C. A. Johnson Central Power and Light Company

. P. O. Box 289, Mail Code: N5012 Wadsworth,-TX 77483 l

t

Attachment ST-HL-AE-5140 -

Page 1 of 2 SOUTH TEXAS PROJECT UNITS 1 AND 2 SIMULATOR UPGRADE PROJECT l

PERFORMANCE TEST RESULTS The South Texas Project simulator upgrade project is complete. Site acceptance testing began l ' Lin March 1995 and was completed satisfactorily in July 1995. One hundred percent malfunction testing was completed along with all other simulator performance tests required by ANSI-3.5,-

1 1985, " Nuclear Power Plant Simulators for Use in Operator Training," as endorsed by Regulatory

~

. Guide 1.149. Individuals from South Texas Project's plant operations, training and engineering organizations wem involved in the testmg program.

i The simulator upgrade project testing results meet the performance requimments.of ANSI-3.5, i

1985. The areas of panial and non-compliance which were identified in Section 2 of the March 1,1991 South Texas Project Simulator Certification Report have been corrected. Documentation of the simulator performance test results are maintained and available for review at the facility in accordance with 10CFR55.45(b) (5) (iii).

l I

The March 1,1995 South Texas Project Simulator Certification Report listed 1,554 malfunctions for testing. Of these,186 malfunctions did not test satisfactory during the simulator upgrade project and are being tracked as discrepancies until corrected. Four additional malfunctions were added, tested, and accepted for training. The added malfunctions were for a Steam Generator Tube Rupture in the upper portion of the tube bundle.

I As of August 2,1995 there are 537 discre; ancies against the simulator. These discrepancies will be corrected by the ' simulator vendor as prioritized by the South Texas Project. These identified L

discrepancies will be prioritized in accordance with station simulator configuration control

}.

procedures. Simulator discrepancy documentation is maintained by the South Texas Project and is available for review.

The disempancies listed in Section E of the March 1,1995 South Texas. Project Repon l

Simulator Certification Report have been corrected with the exception of number 1695 (core exit

. thermocouple response). Core exit thermocouple response is in the proper direction, but tb magnitude of response requires resolution. This discrepancy.will be scheduled for correction in

accordance with station simulator configuration procedures.

MISC 95\\5140-215.003 Y

w-m -

rw

g,.

.c i

Attachment -

ST-HL-AE-5140 Page 2 of 2 i

All modifications listed in the March 1,1991 South Texas Project Simulator Certification Report have been completed. ~ However, during the testing of the simulator lighting modification, a software problem was discovered with the lighting relays. A discrepancy report was generated -

for correction in accordance with station simulator configuration control procedures. It is

. anticipated this softr are problem will be corrected by January 1996.

5 f

I e

1

?

MISC 95\\5140-215.003

- - -