Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 2013-17, Significant Plant Transient Induced By Safety-Related Direct Current Bus Maintenance At Power +
- Information Notice 2012-17, Certified Material Test Reports and Age Hardened Concrete Compressive Strength +
- Information Notice 2011-17, Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping +
- Information Notice 2010-17, Common Cause Failure of Boiling-Water Reactor Recirculation Pumps With Variable Speed Drives +
- Information Notice 2008-17, Construction Experience with Concrete Placement Process +
- Information Notice 2007-17, Fires at Nuclear Power Plants Involving Inadequate Fire Protection Administrative and Design Controls +
- Information Notice 2006-17, Recent Operating Experience of Service Water Systems Due to External Conditions +
- Information Notice 2005-17, Manual Brachytherapy Source Jamming +
- Information Notice 2003-17, Reduced Service Life of Automatic Switch Company (ASCO) Solenoid Valves With Buna-N Material +
- Information Notice 1986-17, Update of Failure of Automatic Sprinkler System Valves to Operate +
- Information Notice 1996-17, Reactor Operation Inconsistent with the Updated Final Safety Analysis Report +
- Information Notice 1993-17, Safety Systems Response to Loss of Coolant and Loss of Offsite Power +
- Information Notice 1992-17, NRC Inspections of Programs Being Developed at Nuclear Power Plants in Response to Generic Letter 89-10 +
- Information Notice 1991-17, Fire Safety of Temporary Installation or Services +
- Information Notice 1985-17, Possible Sticking of Asco Solenoid Valves +
- Information Notice 1989-17, Contamination and Degradation of Safety-Related Battery Cells +
- Information Notice 1990-17, Weight and Center of Gravity Discrepancies for Copes-Vulcan Valves +
- Information Notice 1987-17, Response Time of Scram Instrument Volume Level Detectors +
- Information Notice 1994-17, Strontium-90 Eye Applicators: Submission of Quality Management Plan (QMP), Calibration, and Use +
- Information Notice 1995-17, Reactor Vessel Top Guide and Core Plate Cracking +
- Information Notice 1997-17, Cracking of Vertical Welds in the Core Shroud and Degraded Repair +
- Information Notice 1998-17, Federal Bureau of Investigation'S (FBI) Awareness of National Security Issues and Response (ANSIR) Program +
- Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses +
- Information Notice 2002-17, Attachment: Recent Misadministrations Caused by Incorrect Calibrations of STRONTIUM-90 Eye Applicators +
- Information Notice 2000-17, Crack in Weld Area of Reactor Coolant System Hot Leg Piping at V.C. Summer +
- Information Notice 2013-17, Significant Plant Transient Induced by Safety-Related Direct Current Bus Maintenance at Power +
- Information Notice 2010-17, Common Cause Failure of Boiling-Water Reactor Recirculation Pumps with Variable Speed Drives +
- Information Notice 2003-17, Reduced Service Life of Automatic Switch Company (Asco) Solenoid Valves with Buna-N Material +
- Information Notice 1994-17, Strontium-90 Eye Applicators: Submission of Quality Management Plan (Qmp), Calibration, and Use +
- Information Notice 2009-17, Reportable Events Involving Treatment Delivery Errors Caused by the Use of Differing Units for the Calibration of Brachytherapy Sources +
- Information Notice 2004-17, Loose Part Detection and Computerized Eddy Current Data Analysis in Steam Generators +
- Information Notice 1988-17, Summary of Responses to NRC Bulletin 87-01, Thinning of Pipe Walls in Nuclear Power Plants +
- Information Notice 1998-17, Federal Bureau of Investigations (FBI) Awareness of National Security Issues and Response (Ansir) Program +